Photo: SJ CLASSIQUETitle & ownership
Approvals
| Building plan (BBMP) | Sanctioned 29 Oct 2025 · No. PRJ/2154/25-26IN | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹12.30 Cr 26.4%Development · ₹34.26 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 29 Oct 2025 | |
| Escrow bank | INDUSIND BANK · Whitefield |
Data room
125 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| “the Sanctuary”Completed (regulator flag) | Classic Ventures LLP | Plot | – | Completed |
| 42 Queens SquareCompleted (regulator flag) | GRS INFRA | Plot | – | Completed |
| 77 EastLapsed · completion date passed | MODERN SPAACES | Apartment | – | Jan 2023 |
| 77 East Phase 2 By Modern Spaaces VenturesLapsed · completion date passed | MODERN SPAACES | Apartment | 1,010 sqft carpet (as filed) | Dec 2022 |
| 302 WestCompleted · OC 30-08-2023 | MODERN SPAACES VENTURES | Apartment | 735–1,398 sqft carpet (as filed) | Completed |
| 312 WestLapsed · completion date passed | MODERN SPAACES CONSTRUCTIONS | Apartment | 604 sqft carpet (as filed) | Apr 2022 |
| Aban DazzleRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Rowhouse | 2,040 sqft carpet (as filed) | Dec 2028 |
| Abhee Kings CourtCompleted · OC 26-05-2026 | ABHEE VENTURES PVT LTD | Apartment | 836–1,124 sqft carpet (as filed) | Completed |
8 of 191 other projects in Sarjapur, A to Z. Status is taken from each project's own filing.
All 194 projects in Sarjapur → · Sj Constructions's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sj Classique in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water and sewerage NOC (BWSSB) | issued 15 May 2025 |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Sep 2029 |
| Land conversion | Converted 22 Jul 2024 · Deputy Commissioner of Bangalore | |
|---|---|---|
| Survey numbers | 76/6 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
2BHK · avg 72 m² 54.7%3BHK · avg 99 m² 31.3%2.5BHK 7.8%1BHK 6.3%
| 1BHK | 4 | 1,841 |
| 2.5BHK | 5 | 4,898 |
| 2BHK | 35 | 27,147 |
| 3BHK | 20 | 21,237 |
| Sold, Q2 2026-27 | 1 / 64 | |
|---|---|---|
| Unsold, Q2 2026-27 | 63 |
| SOBHA Ayana | about 1.5 km | Locked | |
|---|---|---|---|
| Adarsh Park Heights Phase-2 | about 1.5 km | Locked | |
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 And 22 | about 2 km | Locked | |
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58 | about 2 km | Locked | |
| Sobha Sentosa Phase 1 Wing 7 | about 2 km | Locked | |
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 2 km | Locked | |
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 2 km | Locked | |
| Sobha Sentosa Phase 4 Wing 1 And 2 | about 2 km | Locked | |
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 2 km | Locked | |
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 2 km | Locked | |
| SOBHA Neopolis Phase 3 - W 1, 2, 10 & 11 | about 2 km | Locked | |
| SOBHA Neopolis Phase 4 - 3, 4, 8 & 9 | about 2 km | Locked |
| Sj Classique This project | This project is the point the others are measured from | 30 Sep 2029 | 2% (1 of 64) | Not verified yet |
|---|---|---|---|---|
| SOBHA Ayana | about 1.5 km | 31 Dec 2031 | 62% (426 of 683) | Locked |
| Adarsh Park Heights Phase-2 | about 1.5 km | 31 May 2027 | 95% (471 of 494) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Residential (main), over the filed survey numbers | |
|---|---|---|
| Nearest government-flagged flood location | about 1 km, Gunjur | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
| Amenities declared | Electricity · CCTV Surveillance · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Swimming Pool, built | 0% | |
| Power Backup, built | 0% | |
| Covered parking per unit | 1.11 (71 covered spaces for 64 units) | |
| Sewage plant | Sewage treatment plant | |
| Power backup | Declared by the promoter |
| Main structure | Not started · planned by 31 Jan 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 Jul 2029 | |
| Club house | Not started | |
| Completion | 6% | |
| Completion, accountant | 4.1% of the estimated cost spent |
| Schedule end | 31 Jul 2029 | |
|---|---|---|
| RERA completion date | 30 Sep 2029 | |
| Work began, as filed | 1 Apr 2026 |
| Structure | RCC framed structure | |
|---|---|---|
| Building heights, fire NOC | 14.95 m filed, 2 towers |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Flooring | Vitrified tiles (800x800 mm) | |
|---|---|---|
| Power backup | Provided, 9.29 sq m | |
| Sewage plant | Sewage treatment plant |
| Structural engineer, quarterly | Form 6 · Oct 2026 | Clear |
|---|---|---|
| Fire safety | None filed | |
| Environmental clearance | None filed | |
| Architect, quarterly | Form 5 · Oct 2026 | |
| Architect's certificate, registration | Dated 4 Feb 2026 · site inspected 2 Feb 2026 | |
| Architect's quarterly progress certificate dated | 14 Oct 2026 | |
| Architect's site inspection for the quarterly progress certificate | 8 Oct 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹46.57 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹26.62 Cr | |
| Cost incurred | ₹1.91 Cr (4.1% of the estimate) |
Sold (1) 1.6%Unsold (63) 98.4%
| Sold, Q2 2026-27 | 1 / 64 · 63 available | |
|---|---|---|
| Unsold, Q2 2026-27 | 63 |
| Escrow bank | INDUSIND BANK · Whitefield | |
|---|---|---|
| Designated account, collected | ₹13.3 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 (0% of that quarter's deposits) |
| K-RERA registrations under this promoter | 5 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 1 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 And 22 |
|---|
| about 2 km |
| 30 Mar 2026 |
| 100% (237 of 237) |
| Locked |
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58 | about 2 km | 30 Sep 2026 | 100% (356 of 356) | Locked |
|---|
| Sobha Sentosa Phase 1 Wing 7 | about 2 km | 30 Jun 2026 | 100% (71 of 71) | Locked |
|---|
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 2 km | 31 Dec 2026 | 99% (140 of 142) | Locked |
|---|
| Projects within 4 km, counted | 102 (102 with an approximate location) | |
|---|---|---|
| Flats in them | 37,944 | |
| Booked | 21,301 of 37,944 (56%) | |
| Unsold | 16,643 | |
| Booked a month, pooled | 436 flats | |
| Months to sell, pooled | 34 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell, BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 6.5 km, Nallur Halli | |
| Metro, under construction | about 4 km, Kodibeesanahalli |
| Kempegowda Airport | 44.5 | 31.5 |
| MG Road (CBD) | 19 | 15 |
| Manyata Tech Park | 23 | 18 |
| ITPL, Whitefield | 11 | 7.5 |
| Ecospace, Bellandur ORR | 7 | 5 |
| Electronic City Ph 1 | 17.5 | 10 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2.5 km to the north, named Bellandur Amani 90MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Kachamaranahalli Substation on OpenStreetMap |