Photo: SM ART APARTMENTSTitle & ownership
Approvals
| Building plan (BBMP) | Sanctioned 11 May 2022 · No. BBMP/Addl.Dir/JDNORTH/0070/21-22 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹56.57 Cr 30.3%Development · ₹130.16 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 11 May 2022 | |
| Escrow bank | Axis Bank · KASTHURI NAGAR |
Data room
137 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
Excellent apartment. All flats are very spacious and ventilation is so nice that even fan is not required.
Property is clean and well maintained. Location is ok but sometimes peak hour nearby road is too much rush otherwise everything is fine. All the basic amenities are available.
SM ART Apartments is a well-maintained residential community that offers a comfortable and family-friendly living environment. The apartment complex is known for its spacious homes, good amenities, and a vibrant community atmosphere.…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 38 & BanyanCompleted · OC 30-03-2022 | ASSETZ BUILDWELL LLP | Apartment | 1,833 sqft carpet (as filed) | Completed |
| Ambaram HomesCompleted (regulator flag) | ARR DEVELOPERS | Apartment | 879 sqft carpet (as filed) | Completed |
| Amber MeadowsCompleted · OC 31-05-2024 | Excel Stone Developers | Apartment | – | Completed |
| Anuraag AbodeCompleted (regulator flag) | ANURAAG CONSTRUCTIONS | Apartment | 861 sqft carpet (as filed) | Completed |
| Anuraag AmoghCompleted · OC 05-08-2024 | ANURAAG CONSTRUCTIONS | Apartment | 736–949 sqft carpet (as filed) | Completed |
| Ashish A N Reddy ApartmentLapsed · completion date passed | AASHISH DEVELOPER AND BUILDERS | Apartment | 817 sqft carpet (as filed) | Sep 2023 |
| Atz ArevaLapsed · completion date passed | ATZ PROPERTIES | Apartment | 804–1,042 sqft carpet (as filed) | Jun 2026 |
| AuraActive · 9% built | BLUE SKY PROPERTIES | Apartment | 1,089 sqft carpet (as filed) | Apr 2030 |
8 of 66 other projects in Balagere, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sm Art in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Fire NOC |
|---|
| KSFES/NOC/328/2021 · issued 4 Feb 2022 · building height 71.38 m | Clear |
| Environmental clearance | SEIAA 133 CON 2021 · EC identification no. EC22B038KA184450 · issued 18 Jan 2022 | Clear |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water and sewerage NOC (BWSSB) | issued 5 Jan 2022 |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 15 Dec 2026 |
| Land conversion | 4 of 4 parcels converted | |
|---|---|---|
| Sy 47/1, 49/8 | Converted 2 Jul 2021 · Revenue Department | |
| Sy 47/4 | Converted 6 Jul 2021 · Revenue Department | |
| Sy 49/6 | Converted 2 Feb 2021 · Revenue Department | |
| Survey numbers | 47/1 · 47/4 · 49/6 · 49/8 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
2bhk · avg 728 m² 56.8%3bhk 21.4%2.5bhk · avg 876 m² 21.1%1 bhk 0.7%
| 1 bhk | 2 | 9,311 |
| 2.5bhk | 62 | 5,84,857 |
| 2bhk | 167 | 13,08,256 |
| 3bhk | 63 | 6,58,009 |
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | about 0.5 km | Locked | |
|---|---|---|---|
| Sobha Sentosa Phase 1 Wing 7 | about 0.5 km | Locked | |
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 0.5 km | Locked | |
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 0.5 km | Locked | |
| Sobha Sentosa Phase 4 Wing 1 And 2 | about 0.5 km | Locked | |
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 And 22 | about 0.5 km | Locked | |
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58 | about 0.5 km | Locked | |
| SOBHA Ayana | about 0.5 km | Locked | |
| Adarsh Park Heights Phase-2 | about 1 km | Locked | |
| SOBHA Neopolis | about 1 km | Locked | |
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 1.5 km | Locked | |
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 1.5 km | Locked |
| Sm Art This project | This project is the point the others are measured from | 15 Dec 2026 | – | Not verified yet |
|---|---|---|---|---|
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | about 0.5 km | 30 Mar 2026 | 100% (237 of 237) | Locked |
| Sobha Sentosa Phase 1 Wing 7 | about 0.5 km | 30 Jun 2026 | 100% (71 of 71) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Residential (main), over the filed survey numbers | |
|---|---|---|
| Nearest government-flagged flood location | about 0.5 km, Balagere | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · Community Hall · Indoor Sports facility · Gym · Power Backup | |
|---|---|---|
| Covered parking per unit | 1.10 (324 covered spaces for 294 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 20 Jun 2025 |
|---|
| Schedule end | 15 Sep 2026 | |
|---|---|---|
| RERA completion date | 15 Dec 2026 | |
| Work began, as filed | 20 May 2022 |
| Building heights, fire NOC | 71.38 m on the fire NOC · 22 m filed, 2 towers |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 100 sq m |
|---|
| Fire safety | KSFES/NOC/328/2021 · issued 4 Feb 2022 · building height 71.38 m | |
|---|---|---|
| Environmental clearance | SEIAA 133 CON 2021 · EC identification no. EC22B038KA184450 · issued 18 Jan 2022 | |
| Architect's certificate, registration | Site inspected 18 May 2022 | |
| Engineer's certificate, registration | Dated 28 May 2022 | |
| Chartered accountant's certificate, registration | Dated 1 Jun 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹186.72 Cr |
|---|
Sold (238) 100%
| Flats sold, at completion | 238 | |
|---|---|---|
| Flats unsold, at completion | 0 | |
| Flats in the phase | 238 |
| Escrow bank | Axis Bank · KASTHURI NAGAR |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 0.5 km | 31 Dec 2026 | 99% (140 of 142) | Locked |
|---|
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 0.5 km | 30 Jun 2027 | 99% (176 of 178) | Locked |
|---|
| Sobha Sentosa Phase 4 Wing 1 And 2 | about 0.5 km | 31 Dec 2027 | 100% (142 of 142) | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 And 22 | about 0.5 km | 30 Mar 2026 | 100% (237 of 237) | Locked |
|---|
| Projects within 4 km, counted | 89 (89 with an approximate location) | |
|---|---|---|
| Flats in them | 31,618 | |
| Booked | 18,090 of 31,618 (57%) | |
| Unsold | 13,528 | |
| Booked a month, pooled | 509 flats | |
| Months to sell, pooled | 23 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell, BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 4.5 km, Nallur Halli | |
| Metro, under construction | about 3 km, Kodibeesanahalli |
| Kempegowda Airport | 43.5 | 29 |
| MG Road (CBD) | 17.5 | 14 |
| Manyata Tech Park | 22 | 16.5 |
| ITPL, Whitefield | 10.5 | 5.5 |
| Ecospace, Bellandur ORR | 7 | 5 |
| Electronic City Ph 1 | 21 | 12 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Bellandur Amani 90MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named Sobha Dream Acres Substation on OpenStreetMap |