Building plan (BMRDA)Sanctioned 11 Jan 2022No. APA/CC/204/2021-22
RERA extensionsNone on the filingFiling read 31 Oct 2026
Land conversionConverted 28 Nov 2003DEPUTY COMMISSINER ANEKAL AUTHORITY
Permits
Approval letters
Building plan (BMRDA)
Sanctioned 11 Jan 2022 · No. APA/CC/204/2021-22
Power NOC
Filed with the registration
Fire department
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
Locked
Forfeiture, agreement•• %
Forfeiture, allotment letterNot verified yet
Transfer feeNot verified yet
Maintenance includedNot verified yet
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Unit mix filed
Location & risks
What is the location like?
Review1 to review · 1 clear
Groundwater, taluk average21.3 m below groundAnekal taluk, July 2023
Water supply, as filedBorewellDeclared by the promoter
Metro, operational11.1 km
Construction & progress
How is it being built, and when will it be ready?
CompletionCompletedOccupancy certificate filed with K-RERA
Progress
Completion, architect
Lapsed: no quarterly return is on this phase's K-RERA filing
Work left
By component
Lapsed: no quarterly return is on this phase's K-RERA filing
Quarterly return
Developer
Can the developer deliver?
SoldNo return filed
Sold in the latest quarterNo return filed
Funding
Estimated cost
Loan & collateral
Can it be financed?
Conditions
Collateral checks
Building plan (BMRDA)
Sanctioned 11 Jan 2022
Escrow bank
IDFC FIRST BANK · RESIDENCY ROAD
Stage
Certified progress
Lapsed: no quarterly return is on this phase's K-RERA filing
Not verified yet: Value; Max loan; Borrower margin; Developer's project loan; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Data room
Documents filed for this project
Locked
122 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Contract & costs, Disputes & cases and DocumentsUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. The village name is shared by several villages; the one nearest the filed coordinate was used.
I am very happy to stay at SNR SAFA as a tenant. The people in community/ society are very helpful. Great environment, feels like staying at home. Swimming pool, and children play area is well maintained. As a health cautious guys , i use…
JJyothi Banerjee2 Jul 2026★★★★★
As a owner of the flat in SNR SAFA, I am feeling proud. The construction quality is awesome. I have purchased flat from this builder after looking at other projects of the SNR SQUARE. The people in community are very co-operative. All…
AAkhilesh Kumar14 Feb 2026★★★★★
It is my worst decision to own a flat in SNR SAFA, Leaving the construction of the building aside. The people in community are very selfish and greedy when it comes to their priority. Everyone is pointing for civic sense when it's not them…
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Snr Safa in the interactive atlas
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
Title
Charges
Mortgage on the project land
Declared by the promoter
!Review
Survey sketch
Survey sketch filed with K-RERA
No survey sketch is listed on this phase's K-RERA filing
Land record
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. The village name is shared by several villages; the one nearest the filed coordinate was used.
Owners as on the RTC, read date / relation / share
Owners on the RTC
RTC extent
Filed extent
Map extent
Extents agree?
Land category
Pending mutations
Sy. No. 4/1
████████
1
1 acre 3 guntas
1 acre 17 guntas
1 acre 6 guntas
Differs: 15 guntas apart
0
Ownership
Landowner share
Joint development agreement
Landowner share
22%
Not verified yet: Title opinion; Records searched to; Charges on the land; Title report; Developer's project loan; Schedule in the EC vs KGIS neighbours; Encumbrance certificate, Form 15; Sketch, sanction and mutation vs KGIS map; Area on the KGIS map; Developer share; Sale deed signed by.
Filed with the registration
SEIAA
Filed with the registration
AAI
Filed with the registration
Pollution board (CFE)
Filed with the registration
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
28 Feb 2025
Registration certificates
PRM/KA/RERA/1251/308/PR/101122/005438
Land use
Conversion order
Land conversion
Converted 28 Nov 2003 · DEPUTY COMMISSINER ANEKAL AUTHORITY
Survey numbers
4/1
Not verified yet: Validity.
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Payments
Payment plan
Not verified yet
Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
2BHK flats · avg 72 m² 72%3BHK · avg 92 m² 24%1BHK flats 4%
Unit types
Type
Flats
Carpet, as filed (sq ft)
1BHK flats
4
1,765
2BHK flats
72
55,940
3BHK
24
23,853
Floor plans, brochure
No floor plans on file
Unsold stock
K-RERA inventory
Lapsed: no quarterly return is on this phase's K-RERA filing
The area
Comparable projects
Filed prices nearby
Basemap: Esri, OpenStreetMap contributors
Map of 5 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Suyug's Saffron, price locked; Engrace 4, price locked; Engrace 3, price locked; Coevolve Florenza, price locked; Leafy Avenue, price locked.
This project
Padlock: that project's price is part of its own report
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; East Bengaluru, past year; Bengaluru, past year; East Bengaluru since 2022; This project vs East Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Bengaluru median yield.
Bommasandra
The site
Zoning & hazards
Power lines and drains
Basemap: Esri, OpenStreetMap contributors
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
Not verified yet: Possession, agreement; Structure; Structural safety certificate; Main structure; Electrical and plumbing finishing; Internal roads; Club house; Completion, accountant; Foundation; Wall material; Wall thickness; Concrete / steel grade; Windows; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Sewage plant; Structural engineer, quarterly; Design consultants (Form 6); Fire safety; Environmental clearance.
Land · ₹5.57 Cr 21.3%
Development · ₹20.55 Cr 78.7%
Form 4
Estimated cost, at registration
₹26.12 Cr
Estimated cost, architect's and engineer's certificates
₹17.80 Cr
Sales
Sold vs unsold
Lapsed: no quarterly return is on this phase's K-RERA filing
Sold per quarter
Lapsed: no quarterly return is on this phase's K-RERA filing
K-RERA inventory
Lapsed: no quarterly return is on this phase's K-RERA filing
Compliance
Escrow
Lapsed: no quarterly return is on this phase's K-RERA filing
Escrow and filings
Escrow bank
IDFC FIRST BANK · RESIDENCY ROAD
Share of collections the promoter declared for escrow
70%
Track record
Average schedule slip
DOSL builder track
K-RERA registrations under this promoter
5
Marked completed
3
Past promised date, not completed
2
Other phases under this promoter name
4
With a filed extension or completion
4 (3 completed, 1 extended)
Average schedule slip
22 months
Not verified yet: Receivable, sold flats; Cost left; Cost left vs buyer dues; Cost incurred; Collected from buyers; Land cost revision; Designated account, collected; Designated account, withdrawn; Unregistered agreements, over 10% paid.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Anekal taluk average, July 2023: 21.3 m below ground
What it means
20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class
Through the year
January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several)
Water supply, as filed
Borewell
Nearest city water main
7.5 km
!Review
Distances
Within 3 km
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.