Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | 1 | |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 77 SkyWithdrawn | DivyaSree Infrastruture Projects Private Limited | Mixed development | – | Dec 2018 |
| Century RegaliaActive · 74% built | Century Real Estate | Apartment | 2,375–4,780 sqft | Apr 2029 |
| Century Regalia (Project 2)Active · 32% built | Suruchi Properties Private Limited | Apartment | 1,266–2,153 sqft carpet (as filed) | Feb 2030 |
| Chick Cottage ResidencesCompleted · OC 19-03-2021 | Tree of Life Dwellings LLP | Apartment | – | Completed |
| Construction Of 336 (G+3) Houses At ShanthinagarRegistered · no quarterly update yet | karnataka slum development board | Apartment | 323 sqft carpet (as filed) | Oct 2026 |
| Diamond District | India Builders Corporation (IBC) | Apartment | 1,150–3,000 sqft | – |
| DivyaSree 77 East | DivyaSree Developers | Villa | 5,851–6,154 sqft | – |
| DivyaSree 77 LifeCompleted · OC 24-12-2025 | DivyaSree Developers | Apartment | 2,400–4,200 sqft | Completed |
8 of 25 other projects in Old Airport Road, A to Z. Status is taken from each project's own filing.
All 26 projects in Old Airport Road → · Sobha's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sobha Palladian in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Map of 2 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Adarsh Parkland, price locked; SOBHA Neopolis, price locked.
| Sobha Palladian This project | This project is the point the others are measured from | – | – | Not verified yet |
|---|---|---|---|---|
| Adarsh Parkland | 2.7 km | – | – | Locked |
| SOBHA Neopolis | 3.5 km | 31 Dec 2028 | 95% (570 of 600) | Locked |
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 3.5 km | 31 Dec 2030 | 98% (220 of 225) | Locked |
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 3.5 km | 31 Dec 2031 | 96% (289 of 302) | Locked |
| SOBHA Neopolis Phase 3 - W 1, 2, 10 & 11 | about 3.5 km | 31 Dec 2029 | 90% (335 of 374) | Locked |
| SOBHA Neopolis Phase 4 - 3, 4, 8 & 9 | about 3.5 km | 31 Dec 2031 | 85% (319 of 374) | Locked |
| Rent, 4BHK, 3 km | ₹80,500 /mo · 8 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹60,000 /mo · 183 listings | |
| Rent, 2BHK, 3 km | ₹35,000 /mo · 276 listings | |
| Rent, 1BHK, 3 km | ₹18,500 /mo · 213 listings | |
| Rent per sq ft, 3 km | ₹35.6 /mo, as listed · 253 listings with a size |
| Projects within 4 km, counted | 37 (21 with an approximate location) | |
|---|---|---|
| Flats in them | 10,442 | |
| Booked | 5,216 of 10,442 (50%) | |
| Unsold | 5,226 | |
| Booked a month, pooled | 167 flats | |
| Months to sell, pooled | 28 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest government-flagged flood location | 200 m, Deepa nursing home |
| Nearest storm drain | 120 m to the east, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 150 m to the north-east, an unnamed water body |
| K-RERA registrations under this promoter | 118 | |
|---|---|---|
| Marked completed | 61 | |
| Past promised date, not completed | 7 | |
| Revoked or withdrawn | 7 |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Nearest city water main | 40 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 120 m to the east, primary drain | |
|---|---|---|
| Ground level | 873 m above sea level, plus or minus 4 m | |
| Metro, operational | 3.7 km, Seetharam Palya | |
| Metro, under construction | 1.3 km, Kodibeesanahalli |
| Kempegowda Airport | 44.7 | 44 | 27.3 |
| MG Road (CBD) | 11.1 | 15 | 9.9 |
| Manyata Tech Park | 17.3 | 23 | 12.6 |
| ITPL, Whitefield | 11.4 | 13 | 6.2 |
| Ecospace, Bellandur ORR | 5.6 | 11 | 3.3 |
| Electronic City Ph 1 | 20.2 | 28 | 12.8 |
| Landfill or waste transfer station | 2.8 km to the north-east | |
|---|---|---|
| Sewage treatment plant | 300 m to the north-west | |
| Quarry | None within 3 km | |
| Crematorium | 2.9 km to the north | |
| Prison | None within 3 km | |
| Electrical substation | 1.1 km to the south-east |