Overview
Overview
Overview
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| 1410 The ResidencesCompleted (regulator flag) | Hitin Property Developments | Apartment | 1,550 sqft carpet (as filed) | Completed |
| A.N. ComfortsCompleted · OC 30-12-2019 | D. Anand Naidu | Apartment | – | Completed |
| AayodhyaLapsed · completion date passed | UTOCORP | Apartment | 285 sqft carpet (as filed) | Jun 2024 |
| AiekyaCompleted · OC 18-08-2025 | Avaneesh Ventures | Apartment | 1,129 sqft carpet (as filed) | Completed |
| Aikyam Emerald GroveCompleted (regulator flag) | AIKYAM VENTURES | Plot | – | Completed |
| Amberstone ElanzaActive · 63% built | SRIVARI VENTURES | Apartment | 804–1,161 sqft carpet (as filed) | Dec 2028 |
| Amberstone Illumina |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
| SRIVARI DWELLINGS |
| Apartment |
| 793–1,071 sqft carpet (as filed) |
| Dec 2028 |
| Amidst NatureExtended to 20-07-2027 | CLIMATE CONNECTIONS | Plot | ~1,500–2,800 sqft (estimate: filed carpet plus 25%) | Jul 2025 |
8 of 152 other projects in Kanakapura Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Sri Temple Touch is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding locality.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Mahindra Eden Phase-2 | about 1 km, to a locality centre | Locked | |
|---|---|---|---|
| Srivara Vasudha | about 1 km, to a locality centre | Locked | |
| Jhanavi Trishul Alaska | about 1.5 km, to a locality centre | Locked | |
| Sattva Forest Ridge | about 2.5 km, to a locality centre | Locked |
| Sri Temple Touch This project | This project is the point the others are measured from | Not on the filing | Not filed | Not verified yet |
|---|---|---|---|---|
| Mahindra Eden Phase-2 | about 1 km, to a locality centre | 30 Jul 2027 | 100% (250 of 250) | Locked |
| Srivara Vasudha | about 1 km, to a locality centre | 30 Nov 2026 | 100% (95 of 95) | Locked |
| Nearest storm drain | about 0.5 km from the locality centre, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 1 km from the locality centre, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Not verified yet | |
| Nearest city water main | Not verified yet | |
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km from the locality centre, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | Not verified yet | |
| Landfill or waste transfer station | None within 3 km of the locality centre | |
|---|---|---|
| Sewage treatment plant | None within 3 km of the locality centre | |
| Quarry | None within 3 km of the locality centre | |
| Crematorium | None within 3 km of the locality centre | |
| Prison | None within 3 km of the locality centre | |
| Electrical substation | about 1 km from the locality centre |
| Garden Square | about 3 km, to a locality centre | Locked |
|---|
| Platinum Landmark | about 4 km, to a locality centre | Locked |
|---|
| Song Of Wind | about 4 km, to a locality centre | Locked |
|---|
| Samaya Sunshine | about 5.5 km, to a locality centre | Locked |
|---|
| Sobha Royal Crest | about 5.5 km, to a locality centre | Locked |
|---|
| Axis Amarissa | about 5.5 km, to a locality centre | Locked |
|---|
| Iris Courtyard | about 5.5 km, to a locality centre | Locked |
|---|
| Adarsh Premia | about 6 km, to a locality centre | Locked |
|---|
| Jhanavi Trishul Alaska | about 1.5 km, to a locality centre | 30 Sep 2028 | 32% (47 of 148) | Locked |
|---|
| Sattva Forest Ridge | about 2.5 km, to a locality centre | 31 Dec 2029 | 75% (304 of 407) | Locked |
|---|
| Garden Square | about 3 km, to a locality centre | 30 Jun 2026 | 84% (193 of 230) | Locked |
|---|
| Platinum Landmark | about 4 km, to a locality centre | 30 Dec 2027 | 17% (18 of 103) | Locked |
|---|