Photo: Official MailsTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (BMRDA) | Sanctioned 8 Oct 2020 · No. 33/456/2019-20 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
2BHK · avg 67 m² 57.1%3BHK · avg 86 m² 42.9%
Location & risks
Construction & progress
Developer
Land · ₹4.98 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BMRDA) | Sanctioned 8 Oct 2020 | |
| Escrow bank | Axis Bank · BELANDUR |
Data room
169 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
Calm and quiet atmosphere.An appartment with all the necessary amenities. Very good connectivity.
Pros- • I found the price quite reasonable compared to others. •Well ventilated flats. •Best quality material used in the construction as well as they have used good branded stuffs inside the flates(jagur,hardware,Havells) •Friendly and…
Good Project. spacious and well-ventilated. All the basic amenities are provided. The price is reasonable, especially considering the quality and features of the property. The floor plan is well-designed, maximizing space and functionality.…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| “the Sanctuary”Completed (regulator flag) | Classic Ventures LLP | Plot | – | Completed |
| 42 Queens SquareCompleted (regulator flag) | GRS INFRA | Plot | – | Completed |
| 77 EastLapsed · completion date passed | MODERN SPAACES | Apartment | – | Jan 2023 |
| 77 East Phase 2 By Modern Spaaces VenturesLapsed · completion date passed | MODERN SPAACES | Apartment | 1,010 sqft carpet (as filed) | Dec 2022 |
| 302 WestCompleted · OC 30-08-2023 | MODERN SPAACES VENTURES | Apartment | 735–1,398 sqft carpet (as filed) | Completed |
| 312 WestLapsed · completion date passed | MODERN SPAACES CONSTRUCTIONS | Apartment | 604 sqft carpet (as filed) | Apr 2022 |
| Aban DazzleRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Rowhouse | 2,040 sqft carpet (as filed) | Dec 2028 |
| Abhee Kings CourtCompleted · OC 26-05-2026 | ABHEE VENTURES PVT LTD | Apartment | 836–1,124 sqft carpet (as filed) | Completed |
8 of 191 other projects in Sarjapur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Srinis Urbane in the interactive atlas
Approval or registration
Land use converted
Yamare Grama Panchayat, Anekal Taluk · Survey 116/2, 116/3, 116/4, 116/5
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Consideration ₹21.9 L · Sy 116/5; 116, Chambenahalli village, Sarjapura hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 7, 13 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹21.9 L · Sy 116/3; 116, Chambenahalli village, Anekal taluk
Title deed filed with K-RERA, pp. 1, 7, 13 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹21.9 L · Sy 116/4; 116, Chambenahalli village, Sarjapura hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 7, 12 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹30.4 L · Sy 116/2; 116, Anekal taluk
Title deed filed with K-RERA, pp. 1, 9, 13 · See it in Documents
Transfer of the land
Title deed executed
No. BSK-1-01550-2019-20 · Book 1 · Consideration ₹4.50 Cr · Sy 116/2; 116, CHAMBENAHALLI village, Sarjapura hobli, Anekal taluk; Sy 116/3; 116, CHAMBENAHALLI village, Sarjapura hobli, Anekal taluk; and 2 more items
Title deed filed with K-RERA, pp. 1, 7, 8, 13, 14 · See it in Documents
Transfer of the land
Sale deed
in favour of Srinivasa Constructions represented by its Authorised signatory Mr. G Dhananjaya · Survey 116/2, 116/3, 116/4, 116/5
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Yamare Grama Panchayat, Anekal taluk · Survey 116/2, 116/3, 116/4, 116/5
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BMRDA · plan 33/456/2019-20
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/080922/005223
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Matched part of the survey number | 6,306 sq m | |
| The whole survey number on the KGIS map | 27,808 sq m | |
| Land area filed with K-RERA | 5,588 sq m | |
| Village, hobli and taluk on the KGIS map | Chambenahalli, Sarjapura-3 hobli, Anekal taluk | |
| Mutation entry | None open on 4 of 4 filed surveys |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Survey numbers | 116/2 , 116/3 , 116/4 , 116/5 | |
|---|---|---|
| Land extent, Sy 116/2 , 116/3 , 116/4 , 116/5 | 1 acre 17 guntas | |
| Whole survey numbers on the KGIS map | 27,808 sq m (the project holds a share) | |
| Land area of this registration | 5,588 sq m | |
| Khata | E Khatha · Yamare Grama Panchayat, Anekal taluk · 31 Jan 2020 | |
| Sale deed | Dated 2 May 2019 | |
| Sale deed in favour of | Srinivasa Constructions represented by its Authorised signatory Mr. G Dhananjaya |
| Sy. No. 116/2 | 1 | 18 guntas | 0 | ||||
| Sy. No. 116/3 | 1 | 13 guntas | 0 | ||||
| Sy. No. 116/4 | 1 | 13 guntas |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2025 |
| Land conversion | Converted 3 Jul 2012 · Yamare Grama Panchayat, Anekal Taluk | |
|---|---|---|
| Survey numbers | 116/2 , 116/3 , 116/4 , 116/5 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 64 | 719 |
| 3BHK | 48 | 928 |
| Coevolve Florenza | about 2 km | Locked | |
|---|---|---|---|
| Bilva Phase-II By Bhavisha Homes | about 2 km | Locked | |
| Nambiar District 25 Phase 2 | about 2 km | Locked | |
| Leafy Avenue | about 3 km | Locked | |
| Engrace 3 | about 3.5 km | Locked | |
| Engrace Vista | about 3.5 km | Locked | |
| Engrace 4 | about 3.5 km | Locked | |
| Suyug's Saffron | about 3.5 km | Locked | |
| Vasudharini Nest | about 4 km | Locked | |
| Jeevan's Allure | about 4 km | Locked | |
| Leafy Delight | about 4.5 km | Locked | |
| Royal Nest | about 5 km | Locked |
| Srinis Urbane This project | This project is the point the others are measured from | 31 Dec 2025 | – | Not verified yet |
|---|---|---|---|---|
| Coevolve Florenza | about 2 km | 31 Dec 2027 | 48% (149 of 309) | Locked |
| Bilva Phase-II By Bhavisha Homes | about 2 km | 30 Apr 2027 | 39% (89 of 226) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 5 km, Gunjur | |
|---|---|---|
| Government land in the filed surveys | Not found |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup | |
|---|---|---|
| Covered parking per unit | 1.00 (112 covered spaces for 112 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 13 May 2024 |
|---|
| Possession, agreement | Dec 2025 | |
|---|---|---|
| Schedule end | 31 Dec 2025 | |
| RERA completion date | 31 Dec 2025 | |
| Work began, as filed | 14 Jan 2022 |
| Building heights, fire NOC | 14.95 m filed, 2 towers |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 100 sq m |
|---|
| Architect's certificate, registration | Dated 16 Aug 2022 · site inspected 8 Aug 2022 | |
|---|---|---|
| Engineer's certificate, registration | Dated 16 Aug 2022 | |
| Chartered accountant's certificate, registration | Dated 16 Aug 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹39.17 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹34.19 Cr | |
| Estimated cost, chartered accountant's certificate | ₹39.17 Cr, same as the filing |
Sold (112) 100%
| Flats sold, at completion | 112 | |
|---|---|---|
| Flats unsold, at completion | 0 | |
| Flats in the phase | 112 |
| Escrow bank | Axis Bank · BELANDUR |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 0 |
| Sy. No. 116/5 | 1 | 13 guntas | 0 |
| Nambiar District 25 Phase 2 |
|---|
| about 2 km |
| 31 Aug 2030 |
| 86% (705 of 816) |
| Locked |
| Leafy Avenue | about 3 km | 31 Dec 2028 | 11% (8 of 71) | Locked |
|---|
| Engrace 3 | about 3.5 km | 1 Jun 2026 | 100% (76 of 76) | Locked |
|---|
| Engrace Vista | about 3.5 km | 30 Dec 2028 | 46% (181 of 392) | Locked |
|---|
| Projects within 4 km, counted | 68 (68 with an approximate location) | |
|---|---|---|
| Flats in them | 23,227 | |
| Booked | 12,209 of 23,227 (53%) | |
| Unsold | 11,018 | |
| Booked a month, pooled | 344 flats | |
| Months to sell, pooled | 27 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 10.5 km, Nallur Halli | |
| Metro, under construction | about 9.5 km, Kodibeesanahalli |
| Kempegowda Airport | 49 | 34.5 |
| MG Road (CBD) | 27.5 | 20.5 |
| Manyata Tech Park | 31.5 | 23.5 |
| ITPL, Whitefield | 15.5 | 11 |
| Ecospace, Bellandur ORR | 16.5 | 10.5 |
| Electronic City Ph 1 | 17.5 | 11.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |