Overview
Overview
Overview
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| “smilee Celestial”Lapsed · completion date passed | Blue Valley Properties Pvt Ltd | Plot | – | Aug 2019 |
| 1 Lakhmulti Storey Housing DoddanagamangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 1 Lakhmulti Storey Housing GoolimangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation Pvt Ltd | Apartment | 323–484 sqft carpet (as filed) | Mar 2024 |
| A B AnanthaActive · 84% built | Amaravathi Builders | Apartment | 753–972 sqft carpet (as filed) | Jan 2027 |
| Abhee NandikaCompleted · OC 22-04-2022 | ABHEE DEVELOPERS | Apartment | 786 sqft carpet (as filed) | Completed |
| Abhee Prakruthi Villa PlotsCompleted (regulator flag) |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
| M/s.Abhee Developers |
| Plot |
| – |
| Completed |
| Abhee PrideCompleted · OC 18-04-2026 | ABHEE VENTURES PRIVATE LIMITED | Apartment | 688–842 sqft carpet (as filed) | Completed |
| Abhee Serenity SpringsActive · 35% built | Abhee Ventures | Apartment | 1,000–1,575 sqft | Jun 2030 |
8 of 236 other projects in Electronic City, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Ssb Urban Lotus is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding village.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Assetz Muse & Maison | about 2 km, to a locality centre | Locked | |
|---|---|---|---|
| Assetz Ren & Rei | about 2 km, to a locality centre | Locked | |
| Haven Phase 2 | about 3 km, to a locality centre | Locked | |
| Assetz Mizumi Reserve Tower A1 A2 A4 | about 3.5 km, to a locality centre | Locked |
| Ssb Urban Lotus This project | This project is the point the others are measured from | Not on the filing | Not filed | Not verified yet |
|---|---|---|---|---|
| Assetz Muse & Maison | about 2 km, to a locality centre | 31 Mar 2030 | 9% (12 of 128) | Locked |
| Assetz Ren & Rei | about 2 km, to a locality centre | 31 Jan 2029 | 73% (159 of 218) | Locked |
| Nearest storm drain | about 1 km from the locality centre, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km from the locality centre, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 1 km from the locality centre, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | Not verified yet | |
| Landfill or waste transfer station | about 2.5 km from the locality centre | |
|---|---|---|
| Sewage treatment plant | about 2.5 km from the locality centre | |
| Quarry | None within 3 km of the locality centre | |
| Crematorium | None within 3 km of the locality centre | |
| Prison | about 2 km from the locality centre, named Bangalore Central Jail on OpenStreetMap | |
| Electrical substation | about 1 km from the locality centre, named Tata P.P. Solar on OpenStreetMap |
| Birla Evara | about 3.5 km, to a locality centre | Locked |
|---|
| Mahindra Zen | about 3.5 km, to a locality centre | Locked |
|---|
| Vasuki Vallabha | about 4 km, to a locality centre | Locked |
|---|
| Ramky One Karnival | about 4 km, to a locality centre | Locked |
|---|
| K&T's Sai Sannidhi | about 4 km, to a locality centre | Locked |
|---|
| Sowmya Skyla | about 4 km, to a locality centre | Locked |
|---|
| Mahindra NewHaven | about 4 km, to a locality centre | Locked |
|---|
| Abhee Riviera Royale | about 4 km, to a locality centre | Locked |
|---|
| Haven Phase 2 | about 3 km, to a locality centre | 30 Jun 2030 | 11% (16 of 148) | Locked |
|---|
| Assetz Mizumi Reserve Tower A1 A2 A4 | about 3.5 km, to a locality centre | 30 Dec 2030 | 69% (302 of 440) | Locked |
|---|
| Birla Evara | about 3.5 km, to a locality centre | 25 Dec 2031 | 66% (1,060 of 1,594) | Locked |
|---|
| Mahindra Zen | about 3.5 km, to a locality centre | 31 Dec 2028 | 100% (227 of 228) | Locked |
|---|