| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
131 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 396 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sumadhura Belfort in the interactive atlas
Transfer of the land
Sale deed
in favour of SUMADHURA INFRACON PRIVATE LIMITED · Survey 172/2, 173, 174/1, 174/2
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Authority · Survey 172/2, 173, 174/1, 174/2
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · PDO RDPRD, Bangalore · Survey 172/2, 173, 174/1, 174/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Satellite Town Ring Road Planning Authority · plan STRRPA/TP/CC/097/2026-27
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/304/PR/230926/008960
K-RERA registration
Transfer of the landApproval or registrationThe parcels join the project
Described in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 172/2, 173, 174/1, 174/2 | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 17,218 sq m | |
| Khata | E Khatha · PDO RDPRD, Bangalore · 28 Apr 2026 | |
| Sale deed | Dated 2 May 2025 | |
| Sale deed in favour of | SUMADHURA INFRACON PRIVATE LIMITED | |
| Building plan (Satellite Town Ring Road Planning Authority) | Sanctioned 28 Aug 2026 · No. STRRPA/TP/CC/097/2026-27 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Aug 2030 |
| Land conversion | Converted 6 Oct 2025 · DC Authority | |
|---|---|---|
| Survey numbers | 172/2 · 173 · 174/1 · 174/2 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
3BHK grand · avg 102 m² 37.5%2BHK classic · avg 76 m² 34.4%2.5BHK flex · avg 86 m² 28.1%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK classic | 180 | 819 |
| 2.5BHK flex | 147 | 927 |
| 3BHK grand | 196 | 1,094 |
| Sold, Q2 2026-27 | 0 / 523 | |
|---|---|---|
| Unsold, Q2 2026-27 | 523 |
| Kumari Nautilus | about 1.5 km | Locked | |
|---|---|---|---|
| Sowparnika Euphoria in the East | about 2.5 km | Locked | |
| Sowparnika Rhythm of Rain | about 2.5 km | Locked | |
| Sowparnika Ashiyana Phase II | about 2.5 km | Locked |
| Sumadhura Belfort This project | This project is the point the others are measured from | 31 Aug 2030 | 0% (0 of 523) | Not verified yet |
|---|---|---|---|---|
| Kumari Nautilus | about 1.5 km | 12 Jan 2028 | 69% (114 of 165) | Locked |
| Sowparnika Euphoria in the East | about 2.5 km | 31 May 2031 | 99% (1,086 of 1,102) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 4 km, SIDDHARTHA LAYOUT KADUGODI | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 2.5 km to the north-west, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.32 (688 covered spaces for 523 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 62 m
Across Hosakote, the water table sat 22.6 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 62 m, and it recovered 4.9 m over the year.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.6 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (Panchayath) | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station |
|---|
| Main structure | Not started · planned by 31 May 2029 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 May 2030 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 15% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Aug 2030 | |
| RERA completion date | 31 Aug 2030 | |
| Work began, as filed | 1 Aug 2026 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 74.95 m filed, 3 towers | |
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 182.56 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Oct 2026 | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Oct 2026 | |
Land · ₹50.15 Cr 10.7%Development · ₹417.15 Cr 89.3%
| Estimated cost | ₹467.31 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Unsold (523) 100%
| Sold, Q2 2026-27 | 0 / 523 · 523 available | |
|---|---|---|
| Unsold, Q2 2026-27 | 523 |
| Escrow bank | HDFC · RICHMOND ROAD-BENGALURU | |
|---|---|---|
| Designated account, collected | ₹1.48 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 (0% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 18 | |
|---|---|---|
| Marked completed | 8 | |
| Past promised date, not completed | 0 | |
| Complaints filed against the promoter | 4 | |
| Other phases under this promoter name | 18 | |
| With a filed extension or completion | 8 (8 completed, 0 extended) | |
| Average schedule slip | 12 months |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan | Sanctioned 28 Aug 2026 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · RICHMOND ROAD-BENGALURU | |
| Vintage Valley | about 4 km | Locked |
|---|
| Nirmaanika Aria | about 4.5 km | Locked |
|---|
| Godrej Parkshire (Hoskote) | about 4.5 km | Locked |
|---|
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | about 5 km | Locked |
|---|
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | about 5 km | Locked |
|---|
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | about 5.5 km | Locked |
|---|
| Godrej Splendour | about 6 km | Locked |
|---|
| Godrej Splendour Phase II | about 6 km | Locked |
|---|
| Sowparnika Rhythm of Rain | about 2.5 km | 15 Jan 2032 | 97% (703 of 725) | Locked |
|---|
| Sowparnika Ashiyana Phase II | about 2.5 km | 31 Dec 2025 | 99% (419 of 422) | Locked |
|---|
| Vintage Valley | about 4 km | 31 Jan 2030 | 56% (27 of 48) | Locked |
|---|
| Nirmaanika Aria | about 4.5 km | 31 Dec 2027 | 32% (22 of 68) | Locked |
|---|
| Projects within 4 km, counted | 21 (21 with an approximate location) | |
|---|---|---|
| Flats in them | 6,067 | |
| Booked | 3,331 of 6,067 (55%) | |
| Unsold | 2,736 | |
| Booked a month, pooled | 56 flats | |
| Months to sell, pooled | 42 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 2.5 km to the north-west, Dakshina Pinakini, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 5 km, Whitefield | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 23.5 |
| MG Road (CBD) | 22 |
| Manyata Tech Park | 20 |
| ITPL, Whitefield | 7.5 |
| Ecospace, Bellandur ORR | 16 |
| Electronic City Ph 1 | 23 |
| None within 3 km |
| Sewage treatment plant | about 2.5 km to the south-west, named Kadugodi 6MLD Sewage Treatment Planet on OpenStreetMap |
|---|
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | None within 3 km |
|---|