Photo: Sunrise Royal VistaTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Transfer of the land
Sale deed
Survey 54/3
K-RERA filing, land schedule
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3bkh · avg 84 m² 100%
Location & risks
Construction & progress
Developer
Land · ₹1.50 Cr 16.7%Development · ₹7.50 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 7 Jan 2023 | |
| Escrow bank | Industrial Development Bank of India · Banasawadi |
Data room
115 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Ambha Bhavani ResidencyActive · 100% built | SHREE JNANAKSHI BUILDERS AND DEVELOPERS | Apartment | 767 sqft carpet (as filed) | Dec 2027 |
| Ambhavilas ResidencyCompleted · OC 19-10-2023 | SHREE JNANAKSHI BUILDERS AND DEVELOPERS | Apartment | 957 sqft carpet (as filed) | Completed |
| Architha AarnaCompleted (regulator flag) | ARCHITHA VENTURES LLP | Apartment | 888–1,123 sqft carpet (as filed) | Completed |
| Architha Bg EnclaveLapsed · completion date passed | ARCHITHA BUILDERS | Plot | – | Nov 2023 |
| Ars Green Villae RaspberryLapsed · completion date passed | ARS Properties | Apartment | 390–743 sqft carpet (as filed) | Jul 2021 |
| Aryan OpulenceLapsed · completion date passed | Aryan Constructions | Apartment | 960–1,119 sqft carpet (as filed) | Jul 2021 |
| Balaji SheltersCompleted · OC 25-07-2019 | SRI BALAJI DEVELOPERS | Apartment | 844 sqft carpet (as filed) | Completed |
| Bavisha GreenwoodsLapsed · completion date passed | Bhavisha Properties | Apartment | 614–643 sqft carpet (as filed) | Mar 2022 |
8 of 67 other projects in RR Nagar, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sunrise Royal Vista in the interactive atlas
Approval or registration
Land use converted
Deputy Commissioner, Bangalore District, Bangalore · Survey 54/3
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 54/3
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Uttarahalli hobli, Bangalore South taluk
Title deed filed with K-RERA, pp. 1, 17 · See it in Documents
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Ad.com/RJH/2430/2022-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/300823/006202
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared |
|---|
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 54/3 | |
|---|---|---|
| Land extent, Sy 54/3 | 13 ½ Guntas | |
| Land area of this registration | 1,396 sq m | |
| Khata | A Khatha · BBMP · 12 Aug 2022 | |
| Sale deed | Dated 21 Aug 2003 | |
| Title deed | Consideration ₹4.0 L |
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 7 Jan 2023 · No. BBMP/Ad.com/RJH/2430/2022-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) (1 of 2) | consent order CTE-121842 · issued 28 Dec 2022 · valid until 21 Dec 2027 | Clear |
| Pollution board (CFE) (2 of 2) | consent order CTE-128379 · issued 21 Aug 2024 · valid until 20 Aug 2029 | Clear |
| Water and sewerage NOC (BWSSB) | issued 24 Feb 2023 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2025 |
| Land conversion | Converted 22 Apr 2022 · Deputy Commissioner, Bangalore District, Bangalore | |
|---|---|---|
| Survey numbers | 54/3 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 3bkh | 24 | 907 |
| Samaya Sunshine | about 1.5 km | Locked | |
|---|---|---|---|
| Sobha Royal Crest | about 3 km | Locked | |
| Sumadhura Pramoda | about 3 km | Locked | |
| Garden Square | about 3 km | Locked | |
| Song Of Wind | about 4 km | Locked | |
| Srivara Vasudha | about 4.5 km | Locked | |
| Jhanavi Trishul Alaska | about 4.5 km | Locked | |
| Mahindra Eden Phase-2 | about 5 km | Locked | |
| Good Earth Ochre | about 5.5 km | Locked | |
| Adarsh Premia | about 5.5 km | Locked | |
| Good Earth Cadence | about 6 km | Locked | |
| Sattva Forest Ridge | about 6.5 km | Locked |
| Sunrise Royal Vista This project | This project is the point the others are measured from | 31 Dec 2025 | – | Not verified yet |
|---|---|---|---|---|
| Samaya Sunshine | about 1.5 km | 31 Dec 2026 | 33% (8 of 24) | Locked |
| Sobha Royal Crest | about 3 km | 31 Dec 2028 | 100% (329 of 329) | Locked |
| Sumadhura Pramoda | about 3 km |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1 km, BEML Layout in RR Nagar |
|---|
| Nearest storm drain | about 0.5 km, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
| Amenities declared | Electricity · Power Backup | |
|---|---|---|
| Covered parking per unit | 1.21 (29 covered spaces for 24 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 10 Dec 2024 |
|---|
| Schedule end | 30 Aug 2025 | |
|---|---|---|
| RERA completion date | 31 Dec 2025 | |
| Work began, as filed | 26 Jun 2023 |
| Structure | RCC framed structure | |
|---|---|---|
| Wall thickness | External walls: 6"; Internal walls: 4" | |
| Building heights, fire NOC | 14.4 m filed |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC windows | |
|---|---|---|
| Flooring | Vitrified tiles | |
| Toilet tiles | Glazed tiles (walls, up to 7') | |
| Wiring | Concealed copper wiring | |
| Power backup | Power backup for lifts, pumps, common area lighting; Power backup in flats: 1 kVA |
| Architect's certificate, registration | Dated 2 Jun 2023 · site inspected 31 May 2023 |
|---|
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹9.00 Cr |
|---|
Sold (8) 33.3%Unsold (16) 66.7%
| Flats sold, at completion | 8 | |
|---|---|---|
| Flats unsold, at completion | 16 | |
| Flats in the phase | 24 |
| Escrow bank | Industrial Development Bank of India · Banasawadi |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 31 Dec 2029 |
| 50% (148 of 297) |
| Locked |
| Garden Square | about 3 km | 30 Jun 2026 | 84% (193 of 230) | Locked |
|---|
| Song Of Wind | about 4 km | 28 Feb 2026 | 63% (10 of 16) | Locked |
|---|
| Srivara Vasudha | about 4.5 km | 30 Nov 2026 | 100% (95 of 95) | Locked |
|---|
| Projects within 4 km, counted | 23 (23 with an approximate location) | |
|---|---|---|
| Flats in them | 3,828 | |
| Booked | 2,520 of 3,828 (66%) | |
| Unsold | 1,308 | |
| Booked a month, pooled | 56 flats | |
| Months to sell, pooled | 23 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, primary drain | |
|---|---|---|
| Metro, operational | about 3 km, Pattanagere | |
| Metro, under construction | about 9.5 km, Hulimavu |
| Kempegowda Airport | 48.5 | 39 |
| MG Road (CBD) | 15.5 | 12.5 |
| Manyata Tech Park | 26 | 19.5 |
| ITPL, Whitefield | 33 | 26 |
| Ecospace, Bellandur ORR | 21.5 | 18 |
| Electronic City Ph 1 | 28 | 19 |
| Landfill or waste transfer station | about 2.5 km to the north-west | |
|---|---|---|
| Sewage treatment plant | about 2.5 km to the north-west, named Mailasandra Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km |