Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Land use converted
Deputy Commissioner · Survey 310/2
K-RERA filing, land schedule
Approvals
| Building plan (Satellite Town Ring Road Planning Authority) | Sanctioned 12 Mar 2025 · No. STRRPA/TP/CC/337/24-25 | |
|---|---|---|
| Power NOC | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 12 Mar 2025 | |
| Escrow bank | STATE BANK OF INDIA · SSI KUMARA PARK |
Data room
117 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 2 | Review |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
| “the Sanctuary”Completed (regulator flag) | Classic Ventures LLP | Plot | – | Completed |
| 42 Queens SquareCompleted (regulator flag) | GRS INFRA | Plot | – | Completed |
| 77 EastLapsed · completion date passed | MODERN SPAACES | Apartment | – | Jan 2023 |
| 77 East Phase 2 By Modern Spaaces VenturesLapsed · completion date passed | MODERN SPAACES | Apartment | 1,010 sqft carpet (as filed) | Dec 2022 |
| 302 WestCompleted · OC 30-08-2023 | MODERN SPAACES VENTURES | Apartment | 735–1,398 sqft carpet (as filed) | Completed |
| 312 WestLapsed · completion date passed | MODERN SPAACES CONSTRUCTIONS | Apartment | 604 sqft carpet (as filed) | Apr 2022 |
| Aban DazzleRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Rowhouse | 2,040 sqft carpet (as filed) | Dec 2028 |
| Abhee Kings CourtCompleted · OC 26-05-2026 | ABHEE VENTURES PVT LTD | Apartment | 836–1,124 sqft carpet (as filed) | Completed |
8 of 191 other projects in Sarjapur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open The Clan in the interactive atlas
Approval or registration
Khata issued
A Khatha · Sarjapura village panchayth · Survey 310/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Satellite Town Ring Road Planning Authority · plan STRRPA/TP/CC/337/24-25
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/091025/008153
K-RERA registration ·
Approval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of 5 of the survey sketch. Filed with K-RERA: Survey Sketch, 5 pages, not in English.
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Matched part of the survey number | 12,834 sq m | |
| The whole survey number on the KGIS map | 26,045 sq m | |
| Extent the filed land schedule names for these survey numbers | 13,262 sq m | |
| Plot area against the filed extent | 0.97 times | |
| Land area filed with K-RERA | 13,304 sq m | |
| Village, hobli and taluk on the KGIS map | Sarjapura, Sarjapura-1 hobli, Anekal taluk | |
| Mutation entry | None open on 1 of 1 filed surveys |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Survey numbers | 310/2 | |
|---|---|---|
| Land extent, Sy 310/2 | 3 ACRE 11.08 GUNTAS | |
| Whole survey numbers on the KGIS map | 26,045 sq m (the project holds a share) | |
| Land area of this registration | 13,304 sq m | |
| Khata | A Khatha · Sarjapura village panchayth · 13 Feb 2025 |
| Survey | Owners as on the RTC, read date / relation / share | Owners on the RTC | RTC extent | Filed extent | Map extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|---|---|
| Sy. No. 310/2 | 1 | 3 acres 12 guntas | 3 acres 11 guntas | 3 acres 7 guntas | Yes | 0 |
| Fire NOC | KSFES/NOC/464/2024 · issued 6 Dec 2024 · building height 29.95 m | Clear |
|---|
| Environmental clearance | SEIAA 193 CON 2024 · EC identification no. EC24C3801KA5277184N | Clear |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2028 |
| Land conversion | Converted 15 Oct 2014 · Deputy Commissioner | |
|---|---|---|
| Survey numbers | 310/2 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
3BHK · avg 88 m² 73.6%2BHK · avg 75 m² 22.5%2.5BHK 3.9%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2.5BHK | 10 | 9,483 |
| 2BHK | 58 | 46,834 |
| 3BHK | 190 | 1,79,919 |
| Sold, Q2 2026-27 | 38 / 258 | |
|---|---|---|
| Unsold, Q2 2026-27 | 220 | |
| Months to sell, derived from filed bookings | 64 months |
Map of 1 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Suyug's Saffron, price locked.
| Sowparnika Olivia Nest | about 0.5 km | Locked | |
|---|---|---|---|
| Royal Nest | about 2 km | Locked | |
| Suyug's Saffron | 2.8 km | Locked | |
| Bilva Phase-II By Bhavisha Homes | about 3.5 km | Locked |
| The Clan This project | This project is the point the others are measured from | 31 Dec 2028 | 15% (38 of 258) | Not verified yet |
|---|---|---|---|---|
| Sowparnika Olivia Nest | about 0.5 km | 30 Sep 2027 | 100% (211 of 211) | Locked |
| Royal Nest | about 2 km | 30 Jun 2028 | 9% (9 of 104) | Locked |
| Suyug's Saffron | 2.8 km |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 220 kV, 90 m from the site | Clear |
| Nearest government-flagged flood location | 9.9 km, Gunjur | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | 2.3 km to the east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 130 m to the north, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Covered parking per unit | 1.11 (286 covered spaces for 258 units) | |
| Power backup | Declared by the promoter |
As the promoter reported itPossession date in the agreement
| Main structure | 25% · planned by 31 Oct 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 30 Nov 2027 | |
| Club house | Not started | |
| Completion | 41% | |
| Completion, accountant | 36% of the estimated cost spent |
| Possession, agreement | 31 Dec 2028 | |
|---|---|---|
| Schedule end | 31 Dec 2027 | |
| RERA completion date | 31 Dec 2028 | |
| Work began, as filed | 4 Jul 2025 |
| Building heights, fire NOC | 29.95 m on the fire NOC · 29.95 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 23.62 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Fire safety | KSFES/NOC/464/2024 · issued 6 Dec 2024 · building height 29.95 m | |
| Environmental clearance | SEIAA 193 CON 2024 · EC identification no. EC24C3801KA5277184N | |
| Architect, quarterly | Form 5 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 23 Jul 2025 | |
| Engineer's certificate, registration | Dated 23 Jul 2025 |
Land · ₹28.88 Cr 19.3%Development · ₹120.44 Cr 80.7%
| Estimated cost, at registration | ₹149.32 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹104.91 Cr | |
| Cost incurred | ₹53.71 Cr (36% of the estimate) | |
| Cost left | ₹95.60 Cr | |
| Receivable, sold flats | ₹21.93 Cr |
Sold (38) 14.7%Unsold (220) 85.3%
| Sold, Q3 2025-26 | 7 / 258 · 251 available | |
|---|---|---|
| Sold, Q4 2025-26 | 12 / 258 · 246 available | |
| Sold, Q1 2026-27 | 18 / 258 · 240 available | |
| Sold, Q2 2026-27 | 38 / 258 · 220 available | |
| Unsold, Q2 2026-27 | 220 | |
| Sold in Q4 2025-26 | 5 | |
| Sold in Q1 2026-27 | 6 | |
| Sold in Q2 2026-27 | 20 |
| Escrow bank | STATE BANK OF INDIA · SSI KUMARA PARK | |
|---|---|---|
| Designated account, collected | ₹6.43 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹5.68 Cr in Q2 2026-27 (88% of that quarter's deposits) | |
| Share of collections the promoter declared for escrow | 70% |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Vasudharini Nest | about 3.5 km | Locked |
|---|
| Leafy Avenue | 4.1 km | Locked |
|---|
| Engrace Vista | about 4 km | Locked |
|---|
| Engrace 4 | 4.4 km | Locked |
|---|
| Engrace 3 | 4.5 km | Locked |
|---|
| Coevolve Florenza | 4.6 km | Locked |
|---|
| Nambiar District 25 Phase 2 | about 5 km | Locked |
|---|
| Leafy Delight | about 6.5 km | Locked |
|---|
| 31 Dec 2028 |
| 8% (9 of 110) |
| Locked |
| Bilva Phase-II By Bhavisha Homes | about 3.5 km | 30 Apr 2027 | 39% (89 of 226) | Locked |
|---|
| Vasudharini Nest | about 3.5 km | 31 Mar 2028 | 31% (26 of 84) | Locked |
|---|
| Leafy Avenue | 4.1 km | 31 Dec 2028 | 11% (8 of 71) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹34,500 /mo · 8 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹28,500 /mo · 11 listings | |
| Rent per sq ft, 3 km | ₹28.5 /mo, as listed · 14 listings with a size |
| Projects within 4 km, counted | 45 (33 with an approximate location) | |
|---|---|---|
| Flats in them | 9,221 | |
| Booked | 4,621 of 9,221 (50%) | |
| Unsold | 4,600 | |
| Booked a month, pooled | 135 flats | |
| Months to sell, pooled | 31 months |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | 10.2 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 2.3 km to the east, tertiary drain | |
|---|---|---|
| Ground level | 881 m above sea level, plus or minus 4 m | |
| Metro, operational | 12.7 km, Bommasandra | |
| Metro, under construction | 14.5 km, Kodibeesanahalli |
| Kempegowda Airport | 56.4 | 57 | 39.1 |
| MG Road (CBD) | 31.2 | 39 | 25.0 |
| Manyata Tech Park | 35.4 | 44 | 28.3 |
| ITPL, Whitefield | 23.2 | 25 | 15.6 |
| Ecospace, Bellandur ORR | 20.0 | 28 | 14.8 |
| Electronic City Ph 1 | 24.6 | 27 | 13.3 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 260 m to the west, named Sarjapur Substation on OpenStreetMap |