Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
We haven't verified this for this project yet.
Sign in first, then it is one click.
Not verified yet: Forfeiture, agreement; Forfeiture, allotment letter; Transfer fee; Maintenance included; Agreement and allotment letter; Payment plan; Agreement for sale.
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Unit mix filed
Location & risks
What is the location like?
Groundwater, taluk average16.9 m below groundBengaluru South taluk, July 2023
Water supply, as filedSelf developmentDeclared by the promoter
Metro, operationalabout 0.5 kmSilk Institute
Construction & progress
How is it being built, and when will it be ready?
Review1 to review · 1 clear
Completion90%As of Q2 2026-27, promoter's return
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Clear2 clear
Receivable, sold flats₹54.42 CrAs of Q4 2025-26
Sold113 / 120✓ClearClear
Sold in Q2 2026-270✓ClearClear
Funding
Estimated cost
Loan & collateral
Can it be financed?
Review1 to review
Conditions
Collateral checks
Records searched to
5 Jun 2018
!Review
Escrow bank
RATNAKAR BANK · Residency Road
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
85 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Disputes & cases and DocumentsUnlock
DOSL Score
59/100
Red flag
41st percentile in Kanakapura RoadHigher than 14 of 35 scored projects
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open The Magic Faraway Tree Phase 2a in the interactive atlas
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate.
No survey sketch is listed on this phase's K-RERA filing
Land record
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Survey plots, KGIS cadastral
Road, stream, tank or settlement (not a plot)
Approximate location: the filed pin, good to the neighbourhood, not the plot
Not verified yet: Title opinion; Charges on the land; Landowner share of sales; How the land reached this project; Court-case search; High Court order; Charges; Schedule in the EC vs KGIS neighbours; Sketch, sanction and mutation vs KGIS map; Area on the KGIS map; The RTC of each filed survey; Share of sales revenue; Joint development agreement.
Filed with the registration
Pollution board (CFE)
Filed with the registration
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
Granted · Approved 29 Aug 2025
RERA completion date
30 Sep 2026
Registration certificates
PRM/KA/RERA/1251/310/PR/181204/002194
EX/PRM/KA/RERA/1251/310/PR/250829/002194
Not verified yet: Building plan, Land conversion, Validity, Conversion order.
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; South Bengaluru, past year; Bengaluru, past year; South Bengaluru since 2022; This project vs South Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields.
Power lines, drains and flood locations around the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Storm drain, primary
Storm drain, smaller
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed)
✓Clear
Fire safety
GBC(1)761/2006
Environmental clearance
SEIAA 16 CON 2017 · issued 18 Apr 2017
Architect, quarterly
Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed)
Not verified yet: Possession, agreement; Structure; Structural safety certificate; Internal roads; Completion, accountant; What the promoter specified · not an inspection; Specification sheet · brands "or equivalent"; Design consultants (Form 6).
Land · ₹3.78 Cr 3.1%Development · ₹117.27 Cr 96.9%
Form 4
Estimated cost, at registration
₹121.05 Cr
Receivable, sold flats
₹54.42 Cr
Sales
Sold vs unsold, Q2 2026-27
Sold (113) 94.2%Unsold (7) 5.8%
Sold per quarter
K-RERA inventory
Sold, Q3 2025-26
113 / 120 · 7 available
Sold, Q4 2025-26
113 / 120 · 7 available
Sold, Q1 2026-27
113 / 120 · 7 available
Sold, Q2 2026-27
113 / 120 · 7 available
Unsold, Q2 2026-27
7
Sold in Q4 2025-26
0
Sold in Q1 2026-27
0
Sold in Q2 2026-27
0
3BHK, sold
113 / 120
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
RATNAKAR BANK · Residency Road
Designated account, collected
₹3.02 Cr in Q2 2026-27
Designated account, withdrawn
₹3.02 Cr in Q2 2026-27 (100% of that quarter's deposits)
Net amount withdrawable, Form 4
₹55,64,76,726
Withdrawn from the escrow account to date
₹1,20,85,98,344
Track record
Average schedule slip
DOSL builder track
K-RERA registrations under this promoter
9
Marked completed
3
Past promised date, not completed
2
Other phases under this promoter name
7
With a filed extension or completion
4 (2 completed, 2 extended)
Average schedule slip
38 months
Not verified yet: Cost left; Cost left vs buyer dues; Cost incurred; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Developer's project loan; Example unit; Calculation; Building plan; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, primary
Storm drain, smaller
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Bengaluru South taluk average, July 2023: 16.9 m below ground
What it means
10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class
Through the year
January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several)
Water supply, as filed
Self development
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot