Overview
The Sanctuary Phase IV
Part ofThe Sanctuary2 phases, 444 plots
Overview
The Sanctuary Phase IV
Part ofThe Sanctuary2 phases, 444 plots
Overview
The Sanctuary Phase IV
Part ofThe Sanctuary2 phases, 444 plots
Overview
Part ofThe Sanctuary2 phases, 444 plots
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (Local Planning Authority) | Sanctioned 26 Aug 2022 · No. LAO/41/2022-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹33.25 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹33.25 Cr, same as the filing |
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 10 Mar 2022 | Review |
| Building plan | Sanctioned 26 Aug 2022 | |
| Escrow bank | ICICI Bank · HSR LAYOUT |
Data room
247 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 4 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 4 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | 1 | – | Review |
| “the Sanctuary”Completed (regulator flag) | Classic Ventures LLP | Plot | – | Completed |
| 42 Queens SquareCompleted (regulator flag) | GRS INFRA | Plot | – | Completed |
| 77 EastLapsed · completion date passed | MODERN SPAACES | Apartment | – | Jan 2023 |
| 77 East Phase 2 By Modern Spaaces VenturesLapsed · completion date passed | MODERN SPAACES | Apartment | 1,010 sqft carpet (as filed) | Dec 2022 |
| 302 WestCompleted · OC 30-08-2023 | MODERN SPAACES VENTURES | Apartment | 735–1,398 sqft carpet (as filed) | Completed |
| 312 WestLapsed · completion date passed | MODERN SPAACES CONSTRUCTIONS | Apartment | 604 sqft carpet (as filed) | Apr 2022 |
| Aban DazzleRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Rowhouse | 2,040 sqft carpet (as filed) | Dec 2028 |
| Abhee Kings CourtCompleted · OC 26-05-2026 | ABHEE VENTURES PVT LTD | Apartment | 836–1,124 sqft carpet (as filed) | Completed |
8 of 191 other projects in Sarjapur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open The Sanctuary Phase IV in the interactive atlas
| Survey | Land converted | Sale deed | Khata | Extent |
|---|
| Survey 28 | ||||
|---|---|---|---|---|
| 28/1 | 14 Jul 2016DEPUTY COMMISSIONER | No sale deed | 17 Nov 2022E Khatha · PANCHAYATH RAJ | 00 ACRE 19 GUNTAS |
| 28/2 | 22 Jul 2016DISTRICT COMMISSIONER | No sale deed | 17 Nov 2022E Khatha · PANCHAYATH RAJ | 33 GUNTAS |
| 28/3 | 25 Oct 2016DISTRICT COMMISSIONER | No sale deed | 17 Nov 2022E Khatha · panchayath raj | 36 GUNTAS |
| 28/4 | 25 Oct 2016DISTRICT COMMISSIONER | No sale deed | 17 Nov 2022E Khatha · PANCHAYATH RAJ | 21 GUNTAS |
| 28/5 | 31 Jul 2015District Commissioenr | No sale deed | 8 Nov 2022E Khatha · Panchayath Raj | 38 Guntas |
| Survey 29 | ||||
|---|---|---|---|---|
| 29/3 | 12 Jan 2015District Commissioner | No sale deed | 15 Nov 2022E Khatha · Panchayath Raj | 36 Guntas |
| 29/1 | 20 Jan 2015District Commissioner | No sale deed | 3 Nov 2022E Khatha · Panchayath Raj | 1 Acre 11 Guntas |
| Survey 31 | ||||
|---|---|---|---|---|
| 31/2 | 12 Jan 2015District commissioner | No sale deed | 2 Nov 2022E Khatha · Panchayath raj | 20 Guntas |
| 31/3 | 12 Jan 2015District Commissioner | No sale deed | 9 Nov 2022E Khatha · Panchayath Raj | 23.08 Guntas |
| Survey 32 | ||||
|---|---|---|---|---|
| 32/4 | 1 Apr 2016District Commissioner | No sale deed | 9 Nov 2022E Khatha · Panchayath Raj | 1 Acre |
| 32/1 | 3 Jan 2015District Commissioner | No sale deed | 10 Nov 2022E Khatha · Panchayath Raj | 2 Acres |
| 32/5 | 12 Jan 2015District Commissioner | No sale deed | 8 Nov 2022E Khatha · Panchayath Raj | 1 Acre 20 Guntas |
K-RERA filing, land schedule
The whole project
Transfer of the land
Title deed executed
Consideration ₹13.5 L · Sy 28/1, Gonighattapura village · 36 guntas
Title deed filed with K-RERA, pp. 1, 5, 15 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹15.0 L · Sy 32, Gonighattapura village, Sarjapura hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 3, 11 · See it in Documents
Transfer of the land
Title deed executed
Sy 32/1
Title deed filed with K-RERA, pp. 1, 37 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹20.0 L
Title deed filed with K-RERA, pp. 1, 7 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹13.5 L · Gonighattapura village, Anekal taluk
Title deed filed with K-RERA, pp. 1, 7, 13 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹35.0 L · Sy 32/5; 32/1, Gonigattapura village, Sarjapura hobli, Anekal taluk · 1 Acre 20 Guntas
Title deed filed with K-RERA, pp. 1, 3, 9 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹3.0 L
Title deed filed with K-RERA, pp. 1, 7 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹21.0 L · Sy 28/1, Sarjapura hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 7, 11 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹1.03 Cr · Sarjapura hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 7, 10 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹72.9 L · Sy 29/3, Sarjapura hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 9, 12 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹1.00 Cr · Sy 31/2, Sarjapura hobli, Anekal taluk · 20 Guntas; Sy 30/3, Sarjapura hobli, Anekal taluk; and 2 more items
Title deed filed with K-RERA, pp. 1, 9, 15, 16 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹1.62 Cr · Sy 32/1, Sarjapura hobli, Anekal taluk · 02 Acres
Title deed filed with K-RERA, pp. 1, 9, 12 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹81.0 L · Sy 32/4 · 01 Acre
Title deed filed with K-RERA, pp. 1, 11, 14 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹66.8 L · Sy 28/2, Sarjapura hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 11, 14 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹1.15 Cr · Sy 28/3; 28/1, Gonighattapura village, Sarjapura hobli, Anekal taluk; Sy 28/4; 28/1, Gonighattapura village, Sarjapura hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 11, 15 · See it in Documents
Approval or registration
Building plan sanctioned
Local Planning Authority · plan LAO/41/2022-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/171023/006327
K-RERA registration ·
Approval or registrationTransfer of the landTitle check
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 10 Mar 2022 |
|---|
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
Page 1
Page 1 of 10 of the survey sketch. Filed with K-RERA: Hissa podi and Survey Sketch copy for all the Sy Nos has been attached, 10 pages, English.
| Filed survey numbers matched to the KGIS map | 4 of 4 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 45,862 sq m | |
| Extent the filed land schedule names for these survey numbers | 46,243 sq m | |
| Plot area against the filed extent | 0.99 times | |
| Village, hobli and taluk on the KGIS map | Gonigattapura, Sarjapura-1 hobli, Anekal taluk | |
| Mutation entry | None open on 12 of 12 filed surveys |
Satellite map with the 4 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 4 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Survey numbers | 28/1, 28/2, 28/3, 28/4, 28/5, 29/3 and 6 more | |
|---|---|---|
| Whole survey numbers on the KGIS map | 45,862 sq m (the project holds a share) | |
| Khata | E Khatha · PANCHAYATH RAJ · 17 Nov 2022; E Khatha · panchayath raj · 17 Nov 2022; E Khatha · Panchayath Raj · 8 Nov 2022; and 5 more | |
| Title deed | Consideration ₹77.0 L · Sy 28/5; 28/2, Sarjapura hobli | |
| Title deed | Consideration ₹77.0 L · Sy 28/5; 28/2, Sarjapura hobli, Anekal taluk | |
| Title deed | Consideration ₹1.22 Cr · Sy 32/5; 32/1, Sarjapura hobli, Anekal taluk · 01 Acre 20 Guntas | |
| Title deed | Consideration ₹16.0 L · Sy 31/3; Gonigattapura village, Sarjapura hobli |
| Sy. No. 28/1 | 1 | 10 guntas | 0 | ||||
| Sy. No. 28/2 | 1 | 2 acres 20 guntas | 0 | ||||
| Sy. No. 28/3 | 1 | 20 guntas |
| Fire department |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 26 Aug 2024 |
| Land conversion | 12 of 12 parcels converted | |
|---|---|---|
| Sy 28/1 | Converted 14 Jul 2016 · DEPUTY COMMISSIONER | |
| Sy 28/2 | Converted 22 Jul 2016 · DISTRICT COMMISSIONER | |
| Sy 28/3, 28/4 | Converted 25 Oct 2016 · DISTRICT COMMISSIONER | |
| Sy 28/5 | Converted 31 Jul 2015 · District Commissioenr | |
| Sy 29/3, 31/2, 31/3, 32/5 | Converted 12 Jan 2015 · District Commissioner | |
| Sy 29/1 | Converted 20 Jan 2015 · District Commissioner | |
| Other parcels | 2 more groups on the filing | |
| Survey numbers | 28/1 · 28/2 · 28/3 · 28/4 · 28/5 · 29/3 · 31/2 · 29/1 · 31/3 · 32/4 · 32/1 · 32/5 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 37 (37 with an approximate location) | |
|---|---|---|
| Plots in them | 9,631 | |
| Booked | 5,485 of 9,631 (57%) | |
| Unsold | 4,146 | |
| Booked a month, pooled | 121 plots | |
| Months to sell, pooled | 22 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 5 km, Varthur police station |
|---|
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
| Possession, agreement | 26 Aug 2024 | |
|---|---|---|
| RERA completion date | 26 Aug 2024 | |
| Work began, as filed | 26 Aug 2022 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Engineer's certificate, registration | Dated 24 Jun 2023 |
|---|
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Escrow bank | ICICI Bank · HSR LAYOUT | |
|---|---|---|
| Share of collections the promoter declared for escrow | 70% |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 0 |
| Sy. No. 28/4 | Not read yet | 0 |
| Sy. No. 28/5 | Not read yet | 0 |
| Sy. No. 29/3 | Not read yet | 0 |
| Sy. No. 29/1 | 3 | 2 acres 30 guntas | 0 |
| Sy. No. 31/2 | 1 | 1 acre 19 guntas | 0 |
| Sy. No. 31/3 | 1 | 3 acres 4 guntas | 0 |
| Sy. No. 32/4 | 1 | 2 guntas | 0 |
| Sy. No. 32/1 | 1 | 2 guntas | 0 |
| Sy. No. 32/5 | 1 | 2 guntas | 0 |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Borewell, Local authority (Nariga Grama Panchayat) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 9 km, Channasandra | |
| Metro, under construction | about 10 km, Kodibeesanahalli |
| Kempegowda Airport | 47 | 33 |
| MG Road (CBD) | 25.5 | 21 |
| Manyata Tech Park | 29.5 | 23.5 |
| ITPL, Whitefield | 13.5 | 10 |
| Ecospace, Bellandur ORR | 14.5 | 11.5 |
| Electronic City Ph 1 | 21.5 | 14 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |