10/10 villa experience. Everything was top notch. Book it!
Overview
Unicon Sugarland
Overview
Unicon Sugarland
Overview
Unicon Sugarland
Overview
Photo: Nirmal G NairTitle & ownership
Approvals
| Building plan (Local Planning Authority) | Sanctioned 26 May 2015 · No. 129/2015-16 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Villa · avg 176 m² 100%
Location & risks
Construction & progress
Developer
Land · ₹2.50 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 26 May 2015 | |
| Escrow bank | Karnataka Bank Ltd. · Kengeri Stellite town, Bengaluru |
Data room
151 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
10/10 villa experience. Everything was top notch. Book it!
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 2 | – | Review |
| Construction & progress | – | 1 | 1 | Review |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Aishwarayam TranquilLapsed · completion date passed | MS AISHWARYAM CONCEPT HOMES | Apartment | 807 sqft carpet (as filed) | Mar 2023 |
| Akruthi Spring WoodsLapsed · completion date passed | DAI DORON INDIA PROPERTIES PVT. LTD. | Plot | – | Apr 2019 |
| Akshaya MeadowsLapsed · completion date passed | M/s Akshaya Meadows | Plot | ~1,080–1,800 sqft (estimate: filed carpet plus 25%) | Apr 2026 |
| AmaryllisLapsed · completion date passed | RAKI DEVELOPERS LLP | Apartment | 780–1,047 sqft carpet (as filed) | Jul 2026 |
| Ambiant - Maangalya AshirvadActive · 22% built | AMBIANT HOUSING & CONSTRUCTION PVT LTD. | Apartment | 896–1,171 sqft carpet (as filed) | Apr 2028 |
| Aqua VistaLapsed · completion date passed | POPPY REALTORS PRIVATE LIMITED | Apartment | 323–5,371 sqft carpet (as filed) | Dec 2024 |
| Arna MeadowsLapsed · completion date passed | ARNASHELTERS | Apartment | 1,584 sqft carpet (as filed) | Dec 2018 |
| Artha Satori Platinum | Artha Group | Villa | 4,780 sqft | – |
8 of 208 other projects in Bannerghatta Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Unicon Sugarland in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| SEIAA | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Mar 2026 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 125/113 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Houses | Carpet per house, average (sq ft) |
|---|---|---|
| Villa | 38 | 1,897 |
| Sold, Q3 2025-26 | 0 / 12 | |
|---|---|---|
| Unsold, Q3 2025-26 | 12 |
| Aiikya Forestscape | about 4 km | Locked | |
|---|---|---|---|
| Ramky One Karnival | about 5.5 km | Locked | |
| Abhee Serenity Springs | about 7.5 km | Locked | |
| Vasuki Vallabha | about 7.5 km | Locked | |
| Aqua Vista | about 8 km | Locked | |
| Azur Phase 2 | about 8 km | Locked | |
| Assetz Canvas & Cove 2.0 - Block A | about 8.5 km | Locked | |
| K&T's Sai Sannidhi | about 8.5 km | Locked | |
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 8.5 km | Locked | |
| Azur Tower D | about 8.5 km | Locked | |
| Shriram Sapphire (Codename Ultimate) | about 8.5 km | Locked | |
| Mahindra NewHaven | about 8.5 km | Locked |
| Unicon Sugarland This project | This project is the point the others are measured from | 31 Mar 2026 | 0% (0 of 12) | Not verified yet |
|---|---|---|---|---|
| Aiikya Forestscape | about 4 km | 30 Sep 2028 | 34% (121 of 360) | Locked |
| Ramky One Karnival | about 5.5 km | 30 Dec 2026 | 77% (389 of 503) | Locked |
| Abhee Serenity Springs |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | 89% Water body, 11% Parks & open space, over the filed survey numbers | Review |
|---|---|---|
| Nearest government-flagged flood location | about 7.5 km, BDA LAYOUT | |
| Government land in the filed surveys | Sy 125: 100% of the parent survey, 3.36 of 3.36 acres | Review |
| Nearest storm drain | about 3 km to the north-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
| Amenities declared | Electricity · Water and Sanitation | |
|---|---|---|
| Electricity, built | 100% | |
| Water and Sanitation, built | 100% | |
| Covered parking per unit | 1.11 (42 covered spaces for 38 units) | |
| Power backup | Not declared |

| Main structure | 100% · planned by 2 May 2023 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 10 Jan 2026 | |
| Completion | 100% |
| Possession, agreement | 31 Mar 2026 | |
|---|---|---|
| Schedule end | 31 Mar 2026 | |
| RERA completion date | 31 Mar 2026 | Review |
| Grace period for possession | 6 months | |
| Work began, as filed | 15 May 2016 |
| Structure | RCC framed structure | |
|---|---|---|
| Building heights, fire NOC | 9.3 m filed, 2 towers |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Toilet tiles | Glazed tiles (walls) | |
|---|---|---|
| Power backup | Not provided |
| Structural engineer, quarterly | Form 6 · Feb 2026 | Clear |
|---|---|---|
| Architect, quarterly | Form 5 · Feb 2026 | |
| Architect's certificate, registration | Dated 15 May 2024 · site inspected 13 May 2024 | |
| Engineer's certificate, registration | Dated 15 May 2024 | |
| Chartered accountant's certificate, registration | Dated 5 Jun 2024 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹30.55 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹27.84 Cr | |
| Receivable, sold houses | ₹0 |
Unsold (12) 100%
| Sold, Q3 2025-26 | 0 / 12 · 12 available | |
|---|---|---|
| Unsold, Q3 2025-26 | 12 | |
| Villa, sold | 0 / 12 |
| Escrow bank | Karnataka Bank Ltd. · Kengeri Stellite town, Bengaluru | |
|---|---|---|
| Designated account, collected | ₹0 in Q3 2025-26 | |
| Designated account, withdrawn | ₹0 in Q3 2025-26 |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 7.5 km |
| 30 Jun 2030 |
| 38% (110 of 288) |
| Locked |
| Vasuki Vallabha | about 7.5 km | 31 Dec 2027 | 31% (10 of 32) | Locked |
|---|
| Aqua Vista | about 8 km | 31 Dec 2024 | 96% (173 of 181) | Locked |
|---|
| Azur Phase 2 | about 8 km | 31 Dec 2030 | 86% (185 of 214) | Locked |
|---|
| Projects within 4 km, counted | 9 (9 with an approximate location) | |
|---|---|---|
| Houses in them | 2,210 | |
| Booked | 821 of 2,210 (37%) | |
| Unsold | 1,389 | |
| Booked a month, pooled | 31 houses | |
| Months to sell, pooled | 45 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Borewell, BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 3 km to the north-east, tertiary drain | |
|---|---|---|
| Metro, operational | about 7.5 km, Hebbagodi | |
| Metro, under construction | about 9 km, Kalena Agrahara |
| Kempegowda Airport | 57 | 45.5 |
| MG Road (CBD) | 24 | 20 |
| Manyata Tech Park | 33 | 27.5 |
| ITPL, Whitefield | 40 | 24.5 |
| Ecospace, Bellandur ORR | 27.5 | 16 |
| Electronic City Ph 1 | 13 | 8 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |