Overview
Vaishnavi Harmony
Overview
Vaishnavi Harmony
Overview
Vaishnavi Harmony
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Transfer of the land
Title deed executed
Approvals
| Building plan (BBMP) | Sanctioned 1 May 2024 · No. BBMP/Addl.Dir/JDNORTH/0014/23-24 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3 96.6%2 · avg 85 m²
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 13 Mar 2025 | |
| Building plan (BBMP) | Sanctioned 1 May 2024 | |
| Escrow bank | Axis Bank · Old Madras Road |
Data room
105 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | 1 | – | Review |
| Loan & collateral | – | – | – | – |
| Adithya Homes GrandCompleted (regulator flag) | ADITHYA HOMES | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Completed |
| Aditi TropicaLapsed · completion date passed | ADITI TROPICA | Apartment | – | Dec 2020 |
| Akshaya Temple TreeLapsed · completion date passed | Akshaya Builders Developers Promoters | Apartment | – | Jan 2023 |
| AlayaCompleted (regulator flag) | Essem18 Developers Private Limited | Apartment | 1,762 sqft carpet (as filed) | Completed |
| Alta MonteCompleted (regulator flag) | B S Nesara | Apartment | 1,133 sqft carpet (as filed) | Completed |
| Century MiraiActive · 11% built | Century Real Estate | Apartment | 742–4,111 sqft | Oct 2030 |
| Innovative PalaciaActive · 90% built | SHUBANKARA DEVELOPERS | Apartment | 789–959 sqft carpet (as filed) | Sep 2027 |
| Jeevan PristineCompleted (regulator flag) | M/s. Jeevan Developers | Apartment | – | Completed |
8 of 32 other projects in Marathahalli, A to Z. Status is taken from each project's own filing.
All 35 projects in Marathahalli → · Affinity Projects's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Vaishnavi Harmony in the interactive atlas
Sy 22/2, K.R.Puram hobli
Title deed filed with K-RERA, pp. 1, 30 · See it in Documents
Approval or registration
Land use converted
BBMP · Survey 22/2
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 22/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDNORTH/0014/23-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/270325/007631
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 13 Mar 2025 |
|---|
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of 3 of the encumbrance certificate. Filed with K-RERA: EC from 1-4-2010 to till date, 3 pages.
Page 1
Page 1 of 9 of the survey sketch. Filed with K-RERA: ADLR Certified survey sketch, 9 pages, not in English.
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 24,406 sq m | |
| Land area filed with K-RERA | 2,124 sq m | |
| Village, hobli and taluk on the KGIS map | K.G.Chinnappanahalli, K R PURA3 hobli, BANGALORE-EAST taluk |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Survey numbers | 22/2 | |
|---|---|---|
| Land extent, Sy 22/2 | 21 (unit to confirm) | |
| Whole survey numbers on the KGIS map | 24,406 sq m (the project holds a share) | |
| Land area of this registration | 2,124 sq m | |
| Khata | A Khatha · BBMP · 1 May 2024 |
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water and sewerage NOC (BWSSB) | issued 22 Sep 2023 |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 1 Dec 2027 |
| Land conversion | Converted 1 May 2024 · BBMP | |
|---|---|---|
| Survey numbers | 22/2 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2 | 38 | 34,563 |
| 3 | 1,090 | 11 |
| Sold, Q2 2026-27 | 22 / 48 | |
|---|---|---|
| Unsold, Q2 2026-27 | 26 | |
| Months to sell, derived from filed bookings | 29 months |
| Adarsh Parkland | about 3 km | Locked | |
|---|---|---|---|
| SOBHA Neopolis | about 3.5 km | Locked | |
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 3.5 km | Locked | |
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 3.5 km | Locked | |
| SOBHA Neopolis Phase 3 - W 1, 2, 10 & 11 | about 3.5 km | Locked | |
| SOBHA Neopolis Phase 4 - 3, 4, 8 & 9 | about 3.5 km | Locked | |
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | about 3.5 km | Locked | |
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 And 22 | about 3.5 km | Locked | |
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58 | about 3.5 km | Locked | |
| Sobha Sentosa Phase 1 Wing 7 | about 3.5 km | Locked | |
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 3.5 km | Locked | |
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 3.5 km | Locked |
| Vaishnavi Harmony This project | This project is the point the others are measured from | 1 Dec 2027 | 46% (22 of 48) | Not verified yet |
|---|---|---|---|---|
| Adarsh Parkland | about 3 km | – | – | Locked |
| SOBHA Neopolis | about 3.5 km | 31 Dec 2028 | 95% (570 of 600) | Locked |
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 3.5 km |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Residential (main), over the filed survey numbers | |
|---|---|---|
| Nearest government-flagged flood location | about 0.5 km, Munnekolalu | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Monnekolala |
| Amenities declared | Electricity | |
|---|---|---|
| Electricity, built | 80% | |
| Covered parking per unit | 1.10 (53 covered spaces for 48 units) | |
| Power backup | Not declared |
As the promoter reported it
| Main structure | 100% · planned by 31 May 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 90% · planned by 31 May 2024 | |
| Completion | 95% | |
| Completion, accountant | 96.8% of the estimated cost spent |
| Schedule end | 29 Jul 2024 | |
|---|---|---|
| RERA completion date | 1 Dec 2027 | |
| Work began, as filed | 1 Feb 2025 |
| Building heights, fire NOC | 14.99 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Not provided |
|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 5 Feb 2025 | |
| Engineer's certificate, registration | Dated 5 Feb 2025 | |
| Chartered accountant's certificate, registration | Dated 5 Feb 2025 | |
| Architect's site inspection for the quarterly progress certificate | 5 Oct 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹6.50 Cr 26.6%Development · ₹17.95 Cr 73.4%
| Estimated cost, at registration | ₹24.44 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹24.44 Cr | |
| Estimated cost, engineer's certificate | ₹16.54 Cr | |
| Cost incurred | ₹23.67 Cr (96.8% of the estimate) |
Sold (22) 45.8%Unsold (26) 54.2%
| Sold, Q3 2025-26 | 14 / 48 · 34 available | |
|---|---|---|
| Sold, Q4 2025-26 | 19 / 48 · 29 available | |
| Sold, Q1 2026-27 | 22 / 48 · 26 available | |
| Sold, Q2 2026-27 | 22 / 48 · 26 available | |
| Unsold, Q2 2026-27 | 26 | |
| Sold in Q4 2025-26 | 5 | |
| Sold in Q1 2026-27 | 3 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | Axis Bank · Old Madras Road | |
|---|---|---|
| Designated account, collected | ₹1.91 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹1.34 Cr in Q2 2026-27 (70% of that quarter's deposits) | |
| Net amount withdrawable, Form 4 | ₹14,12,17,127 | |
| Withdrawn from the escrow account to date | ₹9,54,59,123 |
| K-RERA registrations under this promoter | 7 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 0 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 31 Dec 2030 |
| 98% (220 of 225) |
| Locked |
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 3.5 km | 31 Dec 2031 | 96% (289 of 302) | Locked |
|---|
| SOBHA Neopolis Phase 3 - W 1, 2, 10 & 11 | about 3.5 km | 31 Dec 2029 | 90% (335 of 374) | Locked |
|---|
| SOBHA Neopolis Phase 4 - 3, 4, 8 & 9 | about 3.5 km | 31 Dec 2031 | 85% (319 of 374) | Locked |
|---|
| Projects within 4 km, counted | 56 (56 with an approximate location) | |
|---|---|---|
| Flats in them | 14,713 | |
| Booked | 8,192 of 14,713 (56%) | |
| Unsold | 6,521 | |
| Booked a month, pooled | 201 flats | |
| Months to sell, pooled | 29 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell, BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 2 km, Kundalahalli | |
| Metro, under construction | about 0.5 km, Marathahalli |
| Kempegowda Airport | 41.5 | 26.5 |
| MG Road (CBD) | 14 | 11.5 |
| Manyata Tech Park | 17.5 | 13 |
| ITPL, Whitefield | 10 | 4.5 |
| Ecospace, Bellandur ORR | 6.5 | 5 |
| Electronic City Ph 1 | 21 | 14 |
| Landfill or waste transfer station | about 1 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km, named Kadabeesanahalli Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |