Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (BDA) | Sanctioned 25 Nov 2022 · No. 32/2022-23 | |
|---|---|---|
| Power NOC (BESCOM) |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
138 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| – |
| – |
| – |
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 466 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Vista in the interactive atlas
Approval or registration
Land use converted
DC Office, Bangalore Urban · Survey [number withheld]
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of M S Shelters Pvt Ltd · Survey [number withheld]
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BDA · Survey [number withheld]
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan 32/2022-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/300724/006952
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | [number withheld] | |
|---|---|---|
| Land extent, Sy [number withheld] | 0 Acre, 0 Gunta / 771.75 Sq Mtr | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 855 sq m | |
| Khata | A Khatha · BDA · 16 Aug 2022 | |
| Sale deed | Dated 6 Aug 2022 | |
| Sale deed in favour of | M S Shelters Pvt Ltd | |
| Filed with the registration |
| Fire department | Filed with the registration |
|---|
| SEIAA | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2026 |
| Land conversion | Converted 18 Apr 2012 · DC Office, Bangalore Urban | |
|---|---|---|
| Survey numbers | [number withheld] |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
3BHK · avg 95 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 3BHK | 22 | 1,018 |
| Sold, Q1 2026-27 | 22 / 22 | |
|---|---|---|
| Unsold, Q1 2026-27 | 0 |
| Assetz Ren & Rei | about 0.5 km | Locked | |
|---|---|---|---|
| Assetz Muse & Maison | about 0.5 km | Locked | |
| Birla Evara | about 2 km | Locked | |
| Haven Phase 2 | about 2 km | Locked | |
| 63 Degree East - Tower E | about 2.5 km | Locked |
| Vista This project | This project is the point the others are measured from | 31 Dec 2026 | 100% (22 of 22) | Not verified yet |
|---|---|---|---|---|
| Assetz Ren & Rei | about 0.5 km | 31 Jan 2029 | 73% (159 of 218) | Locked |
| Assetz Muse & Maison | about 0.5 km | 31 Mar 2030 | 9% (12 of 128) | Locked |
| Birla Evara |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 3.5 km, Doddakannelli | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 85% | |
| Water and Sanitation, built | 90% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.82 (18 covered spaces for 22 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Shanthipura Grama Panchayath) | |
| Nearest city water main | Not verified yet | |
As the promoter reported it
| Main structure | 90% · planned by 31 Dec 2026 | |
|---|---|---|
| Electrical and plumbing finishing | 87% · planned by 1 Feb 2026 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 85% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Dec 2026 | |
| RERA completion date | 31 Dec 2026 | |
| Work began, as filed | 1 Jan 2023 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 11.48 m filed | |
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 23.2 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Sep 2026, Sep 2026, Oct 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Sep 2026, Sep 2026, Oct 2026 (3 filed) | |
Land · ₹2.64 Cr 21%Development · ₹9.93 Cr 79%
| Estimated cost | ₹12.57 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (22) 100%
| Sold, Q3 2025-26 | 22 / 22 · 0 available | |
|---|---|---|
| Sold, Q4 2025-26 | 22 / 22 · 0 available | |
| Sold, Q1 2026-27 | 22 / 22 · 0 available | |
| Unsold, Q1 2026-27 | 0 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| 3 BHK, sold | 22 / 22 |
| Escrow bank | Karnataka Bank Ltd. · HSR Layout | |
|---|---|---|
| Designated account, collected | ₹0 in Q1 2026-27 | |
| Designated account, withdrawn | ₹0 in Q1 2026-27 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 25 Nov 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Karnataka Bank Ltd. · HSR Layout | |
| Mana Jardin Neo | about 3.5 km | Locked |
|---|
| Sobha Royal Pavilion Phase 8 - Wing 15 | about 3.5 km | Locked |
|---|
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 3.5 km | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 3.5 km | Locked |
|---|
| Orion Heights | about 4 km | Locked |
|---|
| Sowmya Skyla | about 4 km | Locked |
|---|
| Assetz Mizumi Reserve Tower A1 A2 A4 | about 4.5 km | Locked |
|---|
| about 2 km |
| 25 Dec 2031 |
| 66% (1,060 of 1,594) |
| Locked |
| Haven Phase 2 | about 2 km | 30 Jun 2030 | 11% (16 of 148) | Locked |
|---|
| 63 Degree East - Tower E | about 2.5 km | 31 Dec 2026 | 100% (399 of 399) | Locked |
|---|
| Mana Jardin Neo | about 3.5 km | 30 Dec 2032 | 27% (22 of 82) | Locked |
|---|
| Projects within 4 km, counted | 64 (64 with an approximate location) | |
|---|---|---|
| Flats in them | 18,594 | |
| Booked | 11,245 of 18,594 (60%) | |
| Unsold | 7,349 | |
| Booked a month, pooled | 282 flats | |
| Months to sell, pooled | 26 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 3.5 km, Infosys Foundation Konappana Agrahara | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 37 |
| MG Road (CBD) | 16 |
| Manyata Tech Park | 21.5 |
| ITPL, Whitefield | 14 |
| Ecospace, Bellandur ORR | 7 |
| Electronic City Ph 1 | 3.5 |
| Landfill or waste transfer station | about 2.5 km to the north-west | |
|---|---|---|
| Sewage treatment plant | about 1 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the south-west, named Tata P.P. Solar on OpenStreetMap |