Photo: YUVA SUNRISE APARTMENTTitle & ownership
Approvals
| Building plan (Local Planning Authority) | Sanctioned 15 Sep 2022 · No. STRRPA/TP/CC/145/2022-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹3.06 Cr 17.7%Development · ₹14.20 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 15 Sep 2022 | |
| Escrow bank | HDFC · CHANDAPURA |
Data room
130 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched, 1 plot has no filed extent to check against.
It's spacious rooms and nice climate surrounded by this apartment and very near to new outer bypass in Bangalore hardly 500meters and Near to Hosur Highway hardly 200meters.Thanks for this nice view apartment
The rooms are very spacious and well-designed, with good quality construction throughout the building. The layout allows proper ventilation and natural light, which keeps the place naturally cool. The surroundings are peaceful and quiet,…
YUVA SUNRISE has been a wonderful experience for us. The project stands out for its excellent location, thoughtful planning, and quality construction. The apartments are well-designed with good ventilation, natural light, and optimal space…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 1 | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| “smilee Celestial”Lapsed · completion date passed | Blue Valley Properties Pvt Ltd | Plot | – | Aug 2019 |
| 1 Lakhmulti Storey Housing DoddanagamangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 1 Lakhmulti Storey Housing GoolimangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation Pvt Ltd | Apartment | 323–484 sqft carpet (as filed) | Mar 2024 |
| A B AnanthaActive · 84% built | Amaravathi Builders | Apartment | 753–972 sqft carpet (as filed) | Jan 2027 |
| Abhee NandikaCompleted · OC 22-04-2022 | ABHEE DEVELOPERS | Apartment | 786 sqft carpet (as filed) | Completed |
| Abhee Prakruthi Villa PlotsCompleted (regulator flag) | M/s.Abhee Developers | Plot | – | Completed |
| Abhee PrideCompleted · OC 18-04-2026 | ABHEE VENTURES PRIVATE LIMITED | Apartment | 688–842 sqft carpet (as filed) | Completed |
| Abhee Serenity SpringsActive · 35% built | Abhee Ventures | Apartment | 1,000–1,575 sqft | Jun 2030 |
8 of 270 other projects in Electronic City, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Yuva Sunrise in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 1 Apr 2025 |
| Land conversion | Converted 4 Feb 2005 · DC-Bangalore District | |
|---|---|---|
| Survey numbers | 159 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Flats- 2BHK · avg 57 m² 76.5%Flats- 3BHK 17.6%Flats- 1BHK 5.9%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| Flats- 1BHK | 4 | 1,345 |
| Flats- 2BHK | 52 | 31,861 |
| Flats- 3BHK | 12 | 8,654 |
Map of 1 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: SOBHA Townpark, price locked.
| Shriram 107southeast - Phase 3 | about 1 km | Locked | |
|---|---|---|---|
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | about 1.5 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 3, W5 | about 1.5 km | Locked |
| Yuva Sunrise This project | This project is the point the others are measured from | 1 Apr 2025 | – | Not verified yet |
|---|---|---|---|---|
| Shriram 107southeast - Phase 3 | about 1 km | 7 Jan 2027 | 100% (1,055 of 1,055) | Locked |
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | about 1.5 km | 31 Dec 2027 | 100% (99 of 99) | Locked |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest government-flagged flood location | 14.5 km, G K LAYOUT | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 250 m to the south, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup | |
|---|---|---|
| Covered parking per unit | 1.00 (68 covered spaces for 68 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 22 Nov 2024 |
|---|
| Possession, agreement | 1 Apr 2025 | |
|---|---|---|
| Schedule end | 1 Apr 2025 | |
| RERA completion date | 1 Apr 2025 | |
| Work began, as filed | 1 Nov 2022 |
| Building heights, fire NOC | 14.95 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 7 sq m |
|---|
| Architect's certificate, registration | Dated 19 Nov 2022 |
|---|
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹17.26 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹14.20 Cr |
Sold (17) 25%Unsold (51) 75%
| Flats sold, at completion | 17 | |
|---|---|---|
| Flats unsold, at completion | 51 | |
| Flats in the phase | 68 |
| Escrow bank | HDFC · CHANDAPURA |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Sobha Brooklyn Towers - Town Park Phase 4, W4 | about 1.5 km | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | about 1.5 km | Locked |
|---|
| SOBHA Townpark | 1.3 km | Locked |
|---|
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 | about 1.5 km | Locked |
|---|
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 | about 1.5 km | Locked |
|---|
| Columbia Aaltius | about 2 km, to a locality centre | Locked |
|---|
| Sobha Hamptons -Townpark Phase 1 W4 To 6 | about 2 km | Locked |
|---|
| Sobha Madison Heights-Townpark Phase 1 W5 To 7 | about 2 km | Locked |
|---|
| Sobha Madison Heights-Townpark Phase 2 W1 To 4 | about 2 km | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 3, W5 | about 1.5 km | 30 Jun 2029 | 100% (99 of 99) | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 4, W4 | about 1.5 km | 30 Jun 2029 | 100% (99 of 99) | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | about 1.5 km | 30 Jun 2028 | 100% (261 of 261) | Locked |
|---|
| SOBHA Townpark | 1.3 km | 30 Jun 2033 | 51% (250 of 492) | Locked |
|---|
| Rent, 2BHK, 3 km | ₹23,000 /mo · 5 listings | |
|---|---|---|
| Rent per sq ft, 3 km | ₹23.8 /mo, as listed · 6 listings with a size |
| Projects within 4 km, counted | 23 (16 with an approximate location) | |
|---|---|---|
| Flats in them | 7,919 | |
| Booked | 5,198 of 7,919 (66%) | |
| Unsold | 2,721 | |
| Booked a month, pooled | 105 flats | |
| Months to sell, pooled | 20 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Local authority (Anekal) | |
| Nearest city water main | 10.6 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | None within 3 km | |
|---|---|---|
| Ground level | 896 m above sea level, plus or minus 4 m | |
| Metro, operational | 8.2 km, Bommasandra | |
| Metro, under construction | 18.3 km, Bellandur |
| Kempegowda Airport | 63.4 | 68 | 47.2 |
| MG Road (CBD) | 29.1 | 36 | 27.4 |
| Manyata Tech Park | 39.7 | 46 | 33.0 |
| ITPL, Whitefield | 32.9 | 36 | 23.3 |
| Ecospace, Bellandur ORR | 27.1 | 33 | 18.2 |
| Electronic City Ph 1 | 11.4 | 14 | 10.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.6 km to the north | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 680 m to the north-west, named Attibele on OpenStreetMap |