3,045 projects are registered with the real estate regulator in Rajasthan. 2,707 of them have enough filed detail for a full report here: who is building it, when it is due, and any court cases or complaints filed against it.
1,132 of the 2,707 are still filed as under construction, and 159 are already past the completion date their promoter filed.
Projects 301 to 400 of 2,707
| AVALON RIDGEVIEW (Phase-II)RAJ/P/2017/172 | AVALON PROJECTS a unit of GRJ DISTRIBUTORS AND DEVELOPERS PVT LTD | AlwarNeemrana | Apartments | Lapsed | May 2022 | 270 |
| AVALON ROYAL PARKRAJ/P/2017/068 | AVALON PROJECTS a unit of GRJ DISTRIBUTORS AND DEVELOPERS PVT LTD | AlwarAlwar Bypass Road, | Apartments | Lapsed | Dec 2020 | 1,396 |
| AVANI GREENS (B BLOCK)RAJ/P/2018/697 | Hemant Kumar Saiwalia | AlwarShahbad | Plots | Completed | Mar 2020 | 0 |
| Avenue OneRAJ/P/2023/2628 | Merwara Realty Developers Private Limited | AjmerNear Janana Hospital | Plots | Lapsed | May 2025 | 58 |
| AVINS AVENUE 7RAJ/P/2025/4468 | Avins Industries Private Limited | Udaipur. | Apartments | Under construction | Apr 2028 | 23 |
| Ayodhiya RajRAJ/P/2017/573 | D S Developers | JodhpurPWD Road | Apartments | Lapsed | Mar 2018 | 80 |
| AYODHYA ENCLAVERAJ/P/2022/2116 | Goldendunes Realestate Pvt. Ltd. | BarmerBehind Circuit House , Barmer | Plots | Completed | Dec 2022 | 236 |
| AYODHYA ENCLAVERAJ/P/2025/4533 | Trehan Apna Ghar Private Limited | Alwar. | Plots | Under construction | Jul 2027 | 40 |
| AYODHYA GREENSRAJ/P/2026/4735 | Tirupati Fibres And Industries Ltd | SirohiSantpur | Plots | Under construction | Jul 2027 | 126 |
| AYODHYA HEIGHTSRAJ/P/2026/4988 | Meenkamal Enterprises Private Limited | UdaipurSector-11 | Apartments | Under construction | Jul 2030 | 87 |
| AYODHYA NAGARRAJ/P/2025/4287 | Kamal Choudhary | BhilwaraPur | Plots | Completed | Jan 2027 | 76 |
| Ayodhya Puram 1ARAJ/P/2026/4781 | Tarachand | JodhpurJhalamand | Plots | Under construction | Nov 2026 | 16 |
| AYODHYA RESIDENCYRAJ/P/2026/5370 | Jaideep Kabli | PaliPali Chak 1st | Plots | Under construction | Jun 2030 | 69 |
| AYODHYA RESIDENCY BLOCK BRAJ/P/2024/3346 | Sharad Choudhary | KotaNear Poonam Colony, Sogariya Road | Plots | Completed | Oct 2025 | 73 |
| AYODHYAPURAMRAJ/P/2018/740 | Rambhadeep Buildcon Private Limited | JodhpurNear Central Acadmy School | Apartments | Completed | Mar 2021 | 67 |
| AYODHYAPURAM SHEOGANJRAJ/P/2020/1236 | Rambhadeep Buildcon Private Limited | SirohiErinpura, Kesarpura | Apartments | Completed | Dec 2022 | 55 |
| AYUSHI AANGANRAJ/P/2018/733 | AyushiBuilders and Devloper | JodhpurNear Pal Bala ji Temple | Apartments | Lapsed | Feb 2020 | 51 |
| AYUSHI ARUSHA SECTOR ARAJ/P/2026/4688 | Ayushi Buildcon Private Limited | JodhpurJhanwar Road | Plots | Under construction | Oct 2027 | 125 |
| AYUSHI ARUSHA SECTOR BRAJ/P/2025/4320 | Ayushi Buildcon Private Limited | JodhpurJhanwar Road | Plots | Under construction | Nov 2026 | 114 |
| AYUSHI SAROVER SECTOR-ARAJ/P/2025/4267 | Ayushi Buildcon Private Limited | Jodhpuron main Narnadi- Doli Link Road | Plots | Lapsed | Jul 2026 | 102 |
| AYUSHI SMART CITY SECTOR-ARAJ/P/2026/4749 | Ayushi Buildcon Private Limited | JodhpurNarnadi, boranada jhanwar road | Plots | Under construction | Nov 2027 | 27 |
| AYUSHI SMART CITY SECTOR-BRAJ/P/2026/4750 | Ayushi Buildcon Private Limited | JodhpurNarnadi, boranada jhanwar road | Plots | Under construction | Sep 2027 | 97 |
| AYUSHI SMART CITY SECTOR-CRAJ/P/2026/4878 | Ayushi Buildcon Private Limited | JodhpurNarnadi, boranada jhanwar road | Plots | Under construction | Jan 2028 | 101 |
| B D SWAMI MARKETRAJ/P/2026/4992 | Lalchand | Hanumangarh | Plots | Completed | Jul 2026 | 54 |
| B HANUMAN VATIKARAJ/P/2023/2817 | Jhumma Chittar | AjmerJanana Hospital To Makarwali | Plots | Under construction | Nov 2026 | 66 |
| B RAJ ENCLAVERAJ/P/2026/5430 | Kailash Chander | Sri GanganagarRaisinghnagar | Plots | Under construction | Aug 2030 | 32 |
| Baam EnclaveRAJ/P/2026/4841 | Sahil Sigchi | Sri GanganagarPadampur | Plots | Under construction | May 2027 | 35 |
| Baba Ramdev WarehouseRAJ/P/2026/4754 | Bija Ram Meghwal | Jodhpursalawas railway station | Plots | Under construction | Mar 2027 | 35 |
| BAHETI IKONRAJ/P/2026/5139 | Vijendra Kumar Baheti | BhilwaraNear Sitaram Ji Ki Bawdi | Plots | Under construction | Jun 2030 | 17 |
| BAJRANG VIHAR AAWASIYA YOJNARAJ/P/2022/2305 | Bajarng Singh | SikarInside Nawalgarh Road,near Mayur Garden | Plots | Completed | Dec 2025 | 16 |
| BAKLIWAL TOWERRAJ/P/2020/1343 | Bakliwal Tower | SikarTabela Road | Commercial | Lapsed | Sep 2022 | 36 |
| Bala Ji NagarRAJ/P/2026/4901 | Sukharam | JodhpurDaijar | Plots | Completed | Feb 2026 | 41 |
| Balaji Cloth MarketRAJ/P/2022/2167 | Fairdeal Complex Private Limited | Sri GanganagarSquare No. 50 Chak 1 A Chhoti | Plots | Lapsed | Mar 2025 | 87 |
| Balaji Golden Estate E BlockRAJ/P/2026/5441 | Vidhya Devi | Sri GanganagarChak 2 E Chotti | Plots | Lapsed | Jun 2026 | 56 |
| Balaji Golden-EstateRAJ/P/2023/2789 | Sahil Bhambhu | Sri Ganganagar | Plots | Completed | Sep 2024 | 89 |
| BALAJI HEIGHTS TOWER-ARAJ/P/2023/2736 | Balaji Buildcon | SikarShyampura Road | Apartments | Under construction | Dec 2026 | 84 |
| BALAJI HEIGHTS TOWER-BRAJ/P/2024/3201 | Balaji Buildcon | Sikar(Manoharlal Bhagirathmal Dada Aawasiy Colony) Khasra No.-905, Shyampura Road | Apartments | Under construction | Jul 2027 | 90 |
| BALAJI PURAMRAJ/P/2026/5204 | Happy Realearth Llp | AjmerChandiyawas | Plots | Under construction | Nov 2032 | 573 |
| BALAJI RESIDENCYRAJ/P/2019/1129 | Shree Balaji Group | JalorBehind Shnai Dham | Apartments | Lapsed | Dec 2023 | 468 |
| BALAJI TOWERRAJ/P/2021/1527 | Shri Balaji Developers | SikarTabela Market Khatuo Ka Mohalla | Commercial | Under constructionpast its filed completion date | Jun 2023 | 41 |
| BALAJI TRADE PARKRAJ/P/2020/1176 | Samdani Builders Private Limited | BhilwaraSuzuki Enclave Chittor Road | Plots | Completed | Sep 2022 | 87 |
| BALAJI VIHARRAJ/P/2026/5404 | Amararam Aaglecha | PaliKharchi | Plots | Under construction | Aug 2030 | 52 |
| Balaji Vihar Residential SchemeRAJ/P/2025/3478 | Naru Ram | SikarNear Ashirwad Residency | Plots | Lapsed | Sep 2026 | 23 |
| Bapna HouseRAJ/P/2017/577 | Neo Constructions Private Limited | UdaipurBapna House, Sethiyon Ki Bari Hospital Road | Apartments | Revoked | Jul 2020 | 21 |
| BARSANA RESIDENCYRAJ/P/2017/579 | Sanwaria Developers | SikarShekpura Maohalla | Apartments | Lapsed | Feb 2018 | 20 |
| Basant ViharRAJ/P/2019/882 | Gopal Bheel | JhalawarBasant Vihar | Plots | Completed | Aug 2021 | 88 |
| BCM AASHIYANARAJ/P/2018/602 | Shree Mahaveer Infraestate Llp | PaliBhambolayi Road Village Pali-Ii At Pali | Apartments | Lapsed | Dec 2020 | 334 |
| BCM ASHIYANA (Phase 1)RAJ/P/2022/2181 | Bcm Builders Llp | PaliBhithora Khurd, Chawadiya | Apartments | Lapsed | Nov 2024 | 207 |
| BDI Ambbaram (Phase-3)RAJ/P/2020/1311 | Berry Developers And Infrastructure Private Limited | AlwarMain Bhiwadi Alwar Road Post | Apartments | Under construction | Apr 2027 | 70 |
| BDI Ambbaram (Tower A-3)RAJ/P/2018/839 | Berry Developers And Infrastructure Private Limited | AlwarMain Bhiwadi Alwar Road | Apartments | Under constructionpast its filed completion date | Sep 2023 | 104 |
| BDI AranyaRAJ/P/2024/3151 | Bdi Homes Private Limited | AlwarAlwar Highway, Matila | Plots | Completed | Oct 2026 | 116 |
| Benchmark CityRAJ/P/2019/1142 | Benchmarkcity Infraprojects | KotaNayakhera, Khunadi | Plots | Completed | Feb 2022 | 0 |
| Benchmark City Block RRAJ/P/2023/2575 | Narendra Khandelwal | KotaKunhari | Plots | Completed | Apr 2025 | 72 |
| Bhagvati Vihar ColonyRAJ/P/2026/4827 | Sheelu Bishnoi | NagaurVillage – Gogelao | Plots | Under construction | May 2028 | 40 |
| BHAGWATI GREENRAJ/P/2019/954 | Muwal Construction Private Limited | BarmerMain Township Road, Behind Sadar Thana, Barmer | Apartments | Lapsed | Dec 2021 | 354 |
| BHAGWATI GREEN SECONDRAJ/P/2023/2453 | Bhagwati Green Private Limited | BarmerBehind Sadar Thana | Apartments | Under construction | Jun 2028 | 250 |
| BHAGYASHREE ASHIYANARAJ/P/2026/5255 | Pabu Ram | JodhpurUchiarada | Plots | Under construction | Oct 2030 | 76 |
| BHAGYASHREE CITYRAJ/P/2026/5157 | Pukhraj Bhati | JodhpurPal | Plots | Under construction | Sep 2030 | 44 |
| Bhanu Kumar Shastri EnclaveRAJ/P/2019/956 | Udaipur Development Authority | UdaipurSouth Extension, Pannadhay Nagar | Apartments | Completed | Sep 2020 | 576 |
| Bharat NagarRAJ/P/2026/5024 | Moh Husen | HanumangarhChak 8 KWD | Plots | Under construction | Aug 2028 | 30 |
| BHAVYA ENCLAVE IIIRAJ/P/2026/4745 | Shree Khatu Shyam Colonizers Private Limited | SikarVillage Khatu | Plots | Under construction | Jul 2027 | 87 |
| Bhiwadi City CenterRAJ/P/2026/5206 | Shree Balaji Developers | AlwarSaidpur | Plots | Completed | Dec 2025 | 28 |
| BHOLE SHANKAR-NAGARRAJ/P/2025/4600 | Vikram Singh | JodhpurSurpura, Jajiwal | Plots | Under construction | Oct 2027 | 95 |
| BLACK PEARL APARTMENTRAJ/P/2026/4891 | Black Pearl Construction | UdaipurPulla | Mixed | Under construction | Sep 2030 | 216 |
| BLOCK S B SECTOR 9 EAST OF NAGNECHI TEMPLE BIKANERRAJ/P/2026/5361 | Babu Lal | BikanerBlock S.B. Sector 09, Vallabh Garden | Plots | Under construction | Sep 2028 | 133 |
| Blue Pearl ResidencyRAJ/P/2026/4896 | Shiv Shanker Buildcon | JodhpurLight Industrial Area, Back Side of Police Station Shastri Nagar, Near Kalji ki Pyau, | Apartments | Under construction | Feb 2033 | 36 |
| BNKRAJ/P/2025/3972 | Kulvinder Singh | HanumangarhHanumangarh JN. | Plots | Completed | Feb 2024 | 91 |
| BONAFIDE GREENSRAJ/P/2026/5213 | Bonafide Builders Llp | Jodhpur. | Plots | Under construction | Sep 2030 | 22 |
| BRAHMA ENCALVE KANASRAJ/P/2025/4229 | Ajmer Development Authority | AjmerKanas | Plots | Under construction | Jan 2029 | 149 |
| Breeze Homes Phase 1RAJ/P/2017/070 | Fairwealth Housing Pvt Ltd | AlwarBhiwadi | Apartments | Lapsed | Dec 2020 | 430 |
| Brindavan Enc Ph III East ExtensionRAJ/P/2026/5412 | Amar Pratap Developers Private Limited | BikanerUdasar | Plots | Under construction | Sep 2028 | 105 |
| BRINDAVAN ENCLAVE GREENRAJ/P/2026/5224 | Balram | BikanerUdasar | Plots | Under construction | Mar 2033 | 1,569 |
| BRINDAVAN ENCLAVE PHASE IIIRAJ/P/2017/530 | Amar Pratap Developers Private Limited | BikanerNh 11, Jaipur Road, Bikaner | Plots | Lapsed | Dec 2021 | 0 |
| Brindavan Krishna Mohan EnclaveRAJ/P/2025/4434 | Anuj Baweja | BikanerUdasar | Plots | Under construction | Aug 2028 | 125 |
| BRINDAVAN VIHAR PHASE - I (PLOTTED)RAJ/P/2023/2336 | Shree Ganesh | BikanerMurlidhar Vyas Colony | Plots | Completed | Mar 2025 | 218 |
| BRINDAVAN VIHAR PHASE - I (RESIDENTIAL UNIT)RAJ/P/2023/2340 | Shree Ganesh | BikanerMurlidhar Vyas Colony | Apartments | Completed | Mar 2025 | 46 |
| BURHANI PARK EXTRAJ/P/2026/4931 | Safder Hussain | KotaGram | Plots | Under construction | Jun 2027 | 23 |
| Bus Terminal And Transport Hub at Vivek Vihar SchemeRAJ/P/2025/4000 | Jodhpur Development Authority | JodhpurSector-A, Vivek Vihar, Awasiya Yojana, Near Shatabdi Circle, Dangiyawas Bypass | Commercial | Under construction | Dec 2028 | 98 |
| C.M. JAN AWAS YOJANA-2015 KISHANGARHRAJ/P/2019/1106 | Municipal Council Kishangarh | AjmerVillage Madanganj | Apartments | Lapsed | Jan 2021 | 1,202 |
| C.R. CITYRAJ/P/2025/4456 | Jagdish Sai | HanumangarhChak 14 HMH | Plots | Lapsed | Nov 2021 | 72 |
| C.R. City Colony TritayRAJ/P/2026/4775 | Jagnandan Singh | HanumangarhChak 14 HMH | Plots | Completed | Feb 2024 | 77 |
| C.R. CITY IIRAJ/P/2025/4479 | Jagdish Sai | HanumangarhChak 14 HMH | Plots | Lapsed | Feb 2023 | 98 |
| CAPITAL ARCADIA (BHIWADI)RAJ/P/2018/701 | R-Tech Infrastructure Private Limited | AlwarBhiwadi-Alwar Byepass | Commercial | Lapsed | Aug 2023 | 637 |
| Capital Galleria (Bhilwara)RAJ/P/2022/2186 | R-Tech Properties Private Limited | BhilwaraRam Dham Circle | Commercial | Under construction | Feb 2028 | 679 |
| CAPITAL GALLERIA (NEEMRANA)RAJ/P/2017/074 | R-Tech Projects Neemrana Llp | AlwarNeemrana, Alwar | Commercial | Lapsed | Jun 2021 | 842 |
| CAPITAL GREENS- PHASE-1RAJ/P/2017/075 | Rtech Housing Private Limited | AlwarUrban Area Bhiwadi | Apartments | Lapsed | Oct 2018 | 789 |
| CAPITAL HIGHSTREET (BEAWAR)RAJ/P/2018/803 | R-Tech Capital Highstreet Beawar Llp | AjmerContonment Area, Beawar | Commercial | Lapsed | Jan 2023 | 459 |
| CAPITAL HIGHSTREET (BIKANER)RAJ/P/2018/612 | R-Tech Capital Highstreet (Bikaner) Llp | BikanerRidmalsar Purohitan, Bikaner | Commercial | Lapsed | May 2022 | 402 |
| Capital Highstreet (Kota)RAJ/P/2019/992 | Aar Tech Capital Highstreet Kota Llp | KotaBalaji Market, Kota | Commercial | Revoked | Dec 2024 | 292 |
| CAPITAL HOMESRAJ/P/2018/616 | R-Tech Buildtech Llp | AjmerVillage Fatehpuriya-Ii Beawar | Apartments | Lapsed | Jan 2021 | 509 |
| Capital Plaza, BeawarRAJ/P/2023/2800 | R-Tech Infrastructure Private Limited | AjmerStation Road, Rupbani Cinema Marg, Beawar | Commercial | Under construction | Apr 2027 | 214 |
| CASA HERITAGERAJ/P/2024/3140 | Sai Laxmi Narayan Infracon LLP | JalorFront Bike Showroom Jalore-Leta Road | Apartments | Under construction | May 2027 | 81 |
| CENTRAL AVENUERAJ/P/2021/1556 | Rajasthan Cable Industries Limited | KotaLarge Scale Industrial Area, DCM Road | Plots | Revoked | Mar 2024 | 473 |
| CENTRAL AVENUERAJ/P/2025/4201 | Rajasthan Cable Industries Limited | Kotatest | Plots | Under construction | Apr 2028 | 56 |
| CENTRAL CITY MARKETRAJ/P/2026/5406 | Ravinder Mohan Singh | Sri GanganagarPadampur | Plots | Completed | Aug 2025 | 343 |
| CENTRAL CITY MARKET DEVELOPERS HANUMANGARHRAJ/P/2026/4640 | Rajeev Kumar Aggarwal | HanumangarhHanumangarh Jn. | Plots | Completed | Dec 2025 | 47 |
| CENTRAL CITY MARKET PADAMPURRAJ/P/2026/5253 | Rajkaran Singh Gill | Sri GanganagarPadampur | Plots | Completed | Jan 2025 | 119 |
| CHACHAN RESIDENCYRAJ/P/2026/4957 | Chachan Brothers Cotton Ginning Pressing Rice & Oil Mills | HanumangarhNear Railway station | Plots | Under construction | Feb 2027 | 25 |
| CHAITANYARAJ/P/2018/598 | Abhilasha Developers | BanswaraShyampura, Banswara-Udaipur Main Road | Mixed | Completed | Jun 2020 | 12 |
| CHAK 5 E CHOTTI MURBA NO 34 KILLA NO 20,21 SNGRRAJ/P/2019/1014 | Ramesh Kumar Malpani | Sri GanganagarChak 5 E Chotti , Killa No 20 , 21 | Plots | Completed | Mar 2020 | 24 |