Overview
Allure Avani Phase 2
Part ofAllure Avani2 phases, 217 flats
Overview
Allure Avani Phase 2
Part ofAllure Avani2 phases, 217 flats
Overview
Allure Avani Phase 2
Part ofAllure Avani2 phases, 217 flats
Overview
Part ofAllure Avani2 phases, 217 flats
Title & ownership
Approvals
| Building plan (Local Planning Authority) | Sanctioned 14 Nov 2025 · No. CC/451/2025-26 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | State Bank of India · ₹75.00 Cr disbursed | |
|---|---|---|
| Building plan | Sanctioned 14 Nov 2025 | |
| Escrow bank | STATE BANK OF INDIA · Avenue Road, Bangalore |
Data room
166 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Allure Avani Phase 2 in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Environmental clearance | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2029 |
| Land conversion | Converted 31 Dec 2021 · Town Planning Authority | |
|---|---|---|
| Survey numbers | 77 · 78 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Type X of 4 BHK · avg 263 m² 8.9%Type Y of 4 BHK · avg 263 m² 8.9%Type U of 4 BHK · avg 266 m² 8.9%Type V of 4 BHK · avg 266 m² 8.9%8 other types 64.6%
| Type AA of 4 BHK | 7 | 20,032 |
| Type P of 4 BHK | 2 | 5,586 |
| Type Q of 4 BHK | 7 | 22,906 |
| Type R of 4 BHK | 7 | 22,916 |
| Type S of 4 BHK | 7 | 23,121 |
| Type T of 4 BHK | 7 | 23,121 |
| Type U of 4 BHK | 7 | 20,010 |
| Type V of 4 BHK | 7 | 20,010 |
| Type W of 4 BHK | 7 | 19,838 |
| Type X of 4 BHK | 7 | 19,795 |
| Type Y of 4 BHK | 7 | 19,795 |
| Type Z of 4 BHK | 7 | 19,838 |
| Sold, Q2 2026-27 | 0 / 79 | |
|---|---|---|
| Unsold, Q2 2026-27 | 79 |
| Chaithanya Sankhya | about 3.5 km | Locked | |
|---|---|---|---|
| Definer Upper Deck | about 4 km | Locked | |
| Radiance Floresta | about 4.5 km | Locked | |
| Neighbourhood Tree Park | about 4.5 km | Locked | |
| Adarsh Pinecourt | about 4.5 km | Locked | |
| The Pearl Paradise | about 5 km | Locked | |
| Nava Skanda Bellavita | about 5 km | Locked | |
| SOBHA Victoria Park Phase 1 | about 5.5 km | Locked | |
| Sattva Songbird | about 5.5 km | Locked | |
| Godrej Woodscapes | about 6 km | Locked | |
| Assetz Sun & Sanctum - Phase 2 | about 6 km | Locked | |
| Sattva La Vita | about 6.5 km | Locked |
| Allure Avani Phase 2 This project | This project is the point the others are measured from | 31 Dec 2029 | 0% (0 of 79) | Not verified yet |
|---|---|---|---|---|
| Chaithanya Sankhya | about 3.5 km | 30 Nov 2028 | 66% (29 of 44) | Locked |
| Definer Upper Deck | about 4 km | 31 Dec 2025 | 71% (78 of 110) | Locked |
| Radiance Floresta |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 5 km, Richi's Garden | |
|---|---|---|
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
| Amenities declared | Electricity · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Parks, built | 0% | |
| Covered parking per unit | 2.23 (176 covered spaces for 79 units) | |
| Power backup | Not declared |
As the promoter reported it
| Main structure | Not started · planned by 28 May 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 11 Oct 2029 | |
| Completion | 0% | |
| Completion, accountant | 5.8% of the estimated cost spent |
| Schedule end | 30 Nov 2029 | |
|---|---|---|
| RERA completion date | 31 Dec 2029 | |
| Work began, as filed | 1 Jun 2026 |
| Building heights, fire NOC | 10.65 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Not provided |
|---|
| Structural engineer, quarterly | Form 6 · Jul 2026, Oct 2026 (2 filed) | Clear |
|---|---|---|
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Jul 2026, Oct 2026 (2 filed) | |
| Engineer's certificate, registration | Dated 24 Mar 2026 | |
| Chartered accountant's certificate, registration | Dated 23 Apr 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹12.59 Cr 6.6%Development · ₹178.30 Cr 93.4%
| Estimated cost, at registration | ₹190.89 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹162.09 Cr | |
| Cost incurred | ₹11.13 Cr (5.8% of the estimate) | |
| Cost left | ₹179.76 Cr |
Unsold (79) 100%
| Sold, Q1 2026-27 | 0 / 79 · 79 available | |
|---|---|---|
| Sold, Q2 2026-27 | 0 / 79 · 79 available | |
| Unsold, Q2 2026-27 | 79 | |
| Sold in Q2 2026-27 | 0 | |
| 4 BHK, sold | 0 / 79 |
| Escrow bank | STATE BANK OF INDIA · Avenue Road, Bangalore | |
|---|---|---|
| Designated account, collected | ₹12.6 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹12.0 L in Q2 2026-27 (95% of that quarter's deposits) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 4.5 km |
| 31 May 2028 |
| 100% (65 of 65) |
| Locked |
| Neighbourhood Tree Park | about 4.5 km | 31 Dec 2028 | 27% (25 of 93) | Locked |
|---|
| Adarsh Pinecourt | about 4.5 km | 6 Mar 2026 | 71% (142 of 201) | Locked |
|---|
| The Pearl Paradise | about 5 km | 31 Dec 2026 | 72% (23 of 32) | Locked |
|---|
| Projects within 4 km, counted | 12 (12 with an approximate location) | |
|---|---|---|
| Villas in them | 3,309 | |
| Booked | 1,748 of 3,309 (53%) | |
| Unsold | 1,561 | |
| Booked a month, pooled | 70 villas | |
| Months to sell, pooled | 22 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 9 km, Mahadevapura | |
| Metro, under construction | about 8 km, Horamavu |
| Kempegowda Airport | 23.5 | 13.5 |
| MG Road (CBD) | 19.5 | 16 |
| Manyata Tech Park | 14.5 | 10 |
| ITPL, Whitefield | 17.5 | 10.5 |
| Ecospace, Bellandur ORR | 24 | 17 |
| Electronic City Ph 1 | 39 | 26.5 |
| Landfill or waste transfer station | about 1.5 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 1.5 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |