Photo: Raghunandan PaiTitle & ownership
Approvals
| Building plan (BBMP) | Sanctioned 4 Jun 2025 · No. BBMP/Addl.Dir/JDNORTH/0094/24-25 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 4 Jun 2025 | |
| Escrow bank | KOTAK MAHINDRA BANK · Lavelle Road |
Data room
343 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Be very careful before booking in this apartment. Do a lot of due diligence, as once you do the booking and then cancel, even God wont help you get the refund easily.
Buyer Beware: Before purchasing a flat in Brigade Lakecrest, please do your own due diligence. There is an ongoing land-related court dispute involving Brigade Lakecrest and Pashmina Waterfront. Prospective buyers should independently…
"Brigade Building is a wonderful place to stay. Everything you need is conveniently available nearby. The community is friendly and well-managed, ensuring a pleasant experience for everyone involved in the project. I highly recommend it for…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 3 | – | Review |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| 10x ELapsed · completion date passed | MAZ RD Builders and Developers Private Limited | Apartment | 478 sqft carpet (as filed) | Dec 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
| Adarsh ParadiseActive · 93% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
8 of 328 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
All 345 projects in Old Madras Road → · Brigade Group's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Brigade Lakecrest in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Fire NOC |
|---|
| KSFES/NOC/321/2024 · issued 5 Nov 2024 · building height 65.85 m (Wing A, Wing B, Wing C), 68.83 m (Wing D) | Clear |
| Environmental clearance | SEIAA 202 CON 2014 · issued 13 Oct 2015 | Clear |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Mar 2030 |
| Land conversion | 30 of 30 parcels converted | |
|---|---|---|
| Sy 5/1, 5/2, 6/1, 7/5, 7/6, 8/1, 9/2… | Converted 30 Oct 2008 · Special Deputy Commissioner | |
| Sy 4, 7/1, 7/3, 8/3, 12/2 | Converted 22 Oct 2008 · Special Deputy Commissioner | |
| Sy 6/2, 6/4, 8/4, 10/4 | Converted 10 Nov 2008 · Special Deputy Commissioner | |
| Sy 6/3, 9/4, 10/2 | Converted 11 Nov 2008 · Special Deputy Commissioner | |
| Sy 7/2, 7/4 | Converted 31 Oct 2008 · Special Deputy Commissioner | |
| Sy 9/3 | Converted 12 Mar 2009 · Special Deputy Commissioner | |
| Survey numbers | 5/1 · 5/2 · 4 · 6/1 · 6/2 · 6/3 · 6/4 · 7/1 · 7/2 · 7/3 · 7/4 · 7/5 · 7/6 · 8/1 · 8/3 · 8/4 · 9/2 · 9/3 · 9/4 · 9/5 · 10/1 · 10/2 · 10/3 · 10/4 · 12/2 · 16/1 and 4 more parcels |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
3 bedroom + 3 toilet · 113 m² 14.1%3 bedroom + 3 toilet + maids room / home… 6.8%3 bedroom + 3 toilet · 114 m² 3.6%1 bedroom + 1 toilet · 48 m² 3.6%23 other types 71.9%
| 1 bedroom + 1 toilet | 20 | 495 |
| 1 bedroom + 1 toilet | 22 | 517 |
| 2 bedroom + 2 toilet | 21 | 990 |
| 2 bedroom + 2 toilet | 22 | 850 |
| 2 bedroom + 2 toilet | 17 | 872 |
| 2 bedroom + 2 toilet | 22 | 904 |
| 2 bedroom + 2 toilet | 22 | 829 |
| 2 bedroom + 2 toilet | 20 | 850 |
| 2 bedroom + 2 toilet | 22 | 915 |
| 2 bedroom + 2 toilet | 1 | 883 |
| 2 bedroom + 2 toilet | 17 | 969 |
| 2 bedroom + 2 toilet + study | 22 | 1,023 |
| 2 bedroom + 2 toilet + study | 20 | 1,001 |
| 3 bedroom + 3 toilet | 85 | 1,216 |
| 3 bedroom + 3 toilet | 22 | 1,227 |
| 3 bedroom + 3 toilet | 1 | 1,302 |
| 3 bedroom + 3 toilet | 21 | 1,098 |
| 3 bedroom + 3 toilet | 22 | 1,055 |
| 3 bedroom + 3 toilet | 22 | 1,152 |
| 3 bedroom + 3 toilet | 17 | 1,195 |
| 3 bedroom + 3 toilet | 22 | 1,238 |
| 3 bedroom + 3 toilet + maids room / home office | 21 | 1,421 |
| 3 bedroom + 3 toilet + maids room / home office | 22 | 1,399 |
| 3 bedroom + 3 toilet + maids room / home office | 41 | 1,410 |
| Studio | 20 | 334 |
| Studio | 20 | 334 |
| Studio | 20 | 334 |
| Sold, Q2 2026-27 | 418 / 604 | |
|---|---|---|
| Unsold, Q2 2026-27 | 186 | |
| Months to sell, derived from filed bookings | 15 months |
Map of 3 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: 2g Tula, price locked; Garuda Grand, price locked; Assetz Bloom & Dell - Phase 2, price locked.
| Assetz Sun & Sanctum - Phase 2 | about 1 km | Locked | |
|---|---|---|---|
| 2g Tula | 2.9 km | Locked | |
| Garuda Grand | 3.0 km | Locked | |
| Assetz Bloom & Dell - Phase 2 | 3.7 km | Locked |
| Brigade Lakecrest This project | This project is the point the others are measured from | 31 Mar 2030 | 69% (418 of 604) | Not verified yet |
|---|---|---|---|---|
| Assetz Sun & Sanctum - Phase 2 | about 1 km | 31 Jul 2026 | 100% (70 of 70) | Locked |
| 2g Tula | 2.9 km | 27 Dec 2027 | 68% (173 of 256) | Locked |
| Garuda Grand | 3.0 km |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | 75% Residential (main), 25% Valley / drain buffer | Review |
|---|---|---|
| Nearest high-tension line | A 400 kV line's corridor covers about 45% of the site (about 14,080 m²), with 5 transmission towers standing inside the outline | Review |
| Nearest government-flagged flood location | 960 m, TRIVENI NAGAR NEAR KR PURAM |
| Nearest storm drain | 60 m to the south, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 110 m to the north-west, Bhattarahalli Lake |
| Amenities declared | Electricity · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Power Backup, built | 0% | |
| Covered parking per unit | 1.12 (674 covered spaces for 604 units) | |
| Power backup | Declared by the promoter |
As the promoter reported it

| Main structure | 3% · planned by 31 Mar 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 30 Jun 2029 | |
| Completion | 20% | |
| Completion, accountant | 20.4% of the estimated cost spent |
| Schedule end | 31 Mar 2030 | |
|---|---|---|
| RERA completion date | 31 Mar 2030 | |
| Work began, as filed | 1 Jul 2025 |
| Building heights, fire NOC | 65.85 m (Wing A, Wing B, Wing C), 68.83 m (Wing D) on the fire NOC · filed: Wing A 65.85 m, Wing B 65.85 m, Wing C 65.85 m, Wing D 68.83 m |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 422.42 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Fire safety | KSFES/NOC/321/2024 · issued 5 Nov 2024 · building height 65.85 m (Wing A, Wing B, Wing C), 68.83 m (Wing D) | |
| Environmental clearance | SEIAA 202 CON 2014 · issued 13 Oct 2015 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 12 Jun 2025 · site inspected 12 Jun 2025 | |
| Engineer's certificate, registration | Dated 12 Jun 2025 | |
| Chartered accountant, Form 4 | Dated 10 Oct 2026 | |
| Architect's quarterly progress certificate dated | 30 Sep 2026 | |
| Architect's site inspection for the quarterly progress certificate | 30 Sep 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹266.05 Cr 39.5%Development · ₹406.93 Cr 60.5%
| Estimated cost, at registration | ₹672.98 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹406.93 Cr | |
| Estimated cost, Form 4 Q2 2026-27 | ₹680.51 Cr | |
| Cost incurred | ₹138.89 Cr (20.4% of the Form 4 Q2 2026-27 estimate) |
Sold (418) 69.2%Unsold (186) 30.8%
| Sold, Q3 2025-26 | 304 / 604 · 300 available | |
|---|---|---|
| Sold, Q4 2025-26 | 342 / 604 · 262 available | |
| Sold, Q1 2026-27 | 352 / 604 · 252 available | |
| Sold, Q2 2026-27 | 418 / 604 · 186 available | |
| Unsold, Q2 2026-27 | 186 | |
| Sold in Q4 2025-26 | 38 | |
| Sold in Q1 2026-27 | 10 | |
| Sold in Q2 2026-27 | 66 | |
| Flats booked, Form 4 Q1 2026-27 | 342 |
| Escrow bank | KOTAK MAHINDRA BANK · Lavelle Road | |
|---|---|---|
| Designated account, collected | ₹109.01 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹50.55 Cr in Q2 2026-27 (46% of that quarter's deposits) |
| K-RERA registrations under this promoter | 60 | |
|---|---|---|
| Marked completed | 20 | |
| Past promised date, not completed | 15 | |
| Revoked or withdrawn | 1 | |
| Other phases under this promoter name | 31 | |
| With a filed extension or completion | 13 (11 completed, 2 extended) | |
| Average schedule slip | 19 months |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Godrej Splendour Phase II | about 4 km | Locked |
|---|
| Godrej Splendour | 4.2 km | Locked |
|---|
| Sattva Songbird | 4.9 km | Locked |
|---|
| Godrej Woodscapes | about 5 km | Locked |
|---|
| Legacy Saviero | about 5.5 km | Locked |
|---|
| Chaithanya Sankhya | about 5.5 km | Locked |
|---|
| Nirmaanika Aria | about 5.5 km | Locked |
|---|
| Vaswani Starlight | about 5.5 km | Locked |
|---|
| 31 Mar 2028 |
| 41% (56 of 136) |
| Locked |
| Assetz Bloom & Dell - Phase 2 | 3.7 km | 31 Oct 2027 | 100% (238 of 238) | Locked |
|---|
| Godrej Splendour Phase II | about 4 km | 14 Jan 2028 | 88% (782 of 891) | Locked |
|---|
| Godrej Splendour | 4.2 km | 20 Mar 2027 | 98% (1,135 of 1,161) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹45,375 /mo · 34 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹24,000 /mo · 57 listings | |
| Rent, 1BHK, 3 km | ₹12,000 /mo · 28 listings | |
| Rent per sq ft, 3 km | ₹24.8 /mo, as listed · 76 listings with a size |
| Projects within 4 km, counted | 37 (22 with an approximate location) | |
|---|---|---|
| Flats in them | 9,426 | |
| Booked | 4,194 of 9,426 (44%) | |
| Unsold | 5,232 | |
| Booked a month, pooled | 57 flats | |
| Months to sell, pooled | 77 months |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Other | |
| Nearest city water main | 1.0 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 60 m to the south, tertiary drain | |
|---|---|---|
| Ground level | 875 m above sea level, plus or minus 4 m | |
| Metro, operational | 3.5 km, Garudacharpalya | |
| Metro, under construction | 4.4 km, Saraswathi Nagar |
| Kempegowda Airport | 31.6 | 31 | 19.4 |
| MG Road (CBD) | 16.3 | 17 | 13.1 |
| Manyata Tech Park | 13.5 | 18 | 10.1 |
| ITPL, Whitefield | 9.6 | 12 | 5.1 |
| Ecospace, Bellandur ORR | 15.9 | 23 | 11.5 |
| Electronic City Ph 1 | 31.1 | 35 | 20.9 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 900 m to the south, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 2.9 km to the south, named Hoodi Substation on OpenStreetMap |