| Title report dated | 21 Oct 2011 |
|---|
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate.
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire NOC | GBC(1)522/2012 | Clear |
| Environmental clearance | issued 16 Sep 2011 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹10.92 Cr 6.8%
Loan & collateral
| Escrow bank | STATE BANK OF INDIA · Industrial Finance Branch |
|---|
Data room
50 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Community living Very safe for families But the house walls are too hollow i.e. a sneeze by your neighbour is evident even in your house
Ample area for functions, gym and games. Yes the terrace is used for yoga. The Apparent office is also on the ground floor. Ambience is at top with the swimming pool and garden surrounding the club house.
I love the place but maintenance can be even better. Cleanliness is not up to the mark, most of the places has plastic covers n papers. But the greenery is good.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 2 | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| 1410 The ResidencesCompleted (regulator flag) | Hitin Property Developments | Apartment | 1,550 sqft carpet (as filed) | Completed |
| A.N. ComfortsCompleted · OC 30-12-2019 | D. Anand Naidu | Apartment | – | Completed |
| Aarohana AlterraActive · 2% built | AAROHANA PROJECTS | Apartment | 1,133–1,936 sqft carpet (as filed) | Aug 2033 |
| AayodhyaLapsed · completion date passed | UTOCORP | Apartment | 285 sqft carpet (as filed) | Jun 2024 |
| AiekyaCompleted · OC 18-08-2025 | Avaneesh Ventures | Apartment | 1,129 sqft carpet (as filed) | Completed |
| Aikyam Emerald GroveCompleted (regulator flag) | AIKYAM VENTURES | Plot | – | Completed |
| Amberstone ElanzaActive · 63% built | SRIVARI VENTURES | Apartment | 804–1,161 sqft carpet (as filed) | Dec 2028 |
All 180 projects in Kanakapura Road → · Brigade Group's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Brigade Meadows in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 15,866 sq m |
|---|
| Filed with the registration |
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Jul 2018 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Harivishram | about 0.5 km | Locked |
|---|
| Sattva Springs | about 1 km | Locked |
|---|
| Axis Amarissa | about 2 km | Locked |
|---|
| Jhanavi Trishul Alaska | 6.2 km | Locked |
|---|
| Mahindra Eden Phase-2 | about 7.5 km | Locked |
|---|
| Sattva Forest Ridge | 7.8 km | Locked |
|---|
| Srivara Vasudha | about 8 km | Locked |
|---|
| Platinum Landmark | about 8.5 km | Locked |
|---|
| Good Earth Cadence | 9.1 km | Locked |
|---|
| Good Earth Ochre | 9.4 km | Locked |
|---|
| Samaya Sunshine | about 10.5 km | Locked |
|---|
| Garden Square | 10.4 km | Locked |
|---|
| Brigade Meadows This project | This project is the point the others are measured from | 31 Jul 2018 | – | Not verified yet |
|---|---|---|---|---|
| Harivishram | about 0.5 km | 31 Mar 2027 | 100% (152 of 152) | Locked |
| Sattva Springs | about 1 km | 18 Sep 2027 | 38% (25 of 66) | Locked |
| Axis Amarissa | about 2 km | 31 Dec 2029 | 30% (24 of 81) | Locked |
| Jhanavi Trishul Alaska | 6.2 km | 30 Sep 2028 | 32% (47 of 148) | Locked |
| Mahindra Eden Phase-2 | about 7.5 km | 30 Jul 2027 | 100% (250 of 250) | Locked |
| Sattva Forest Ridge | 7.8 km | 31 Dec 2029 | 75% (304 of 407) | Locked |
| Projects within 4 km, counted | 11 (10 with an approximate location) | |
|---|---|---|
| Flats in them | 2,146 | |
| Booked | 617 of 2,146 (29%) | |
| Unsold | 1,529 | |
| Booked a month, pooled | 15 flats | |
| Months to sell, pooled | 60 months |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 66 kV, 90 m from the site | Clear |
| Nearest government-flagged flood location | 6.7 km, Mantri Lake view Appartment Next to Talagattapura Lake |
| Nearest storm drain | 770 m to the east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 420 m to the north, an unnamed tank |
| Completion |
|---|
| Completed, occupancy certificate filed with K-RERA |
| Schedule end | 15 Feb 2019 | |
|---|---|---|
| RERA completion date | 31 Jul 2018 | |
| Work began, as filed | 25 Jan 2014 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety | GBC(1)522/2012 | |
|---|---|---|
| Environmental clearance | issued 16 Sep 2011 |
| Estimated cost, at registration | ₹161.42 Cr |
|---|
| Escrow bank | STATE BANK OF INDIA · Industrial Finance Branch |
|---|
| K-RERA registrations under this promoter | 60 | |
|---|---|---|
| Marked completed | 20 | |
| Past promised date, not completed | 15 | |
| Revoked or withdrawn | 1 | |
| Other phases under this promoter name | 31 | |
| With a filed extension or completion | 12 (10 completed, 2 extended) | |
| Average schedule slip | 21 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Amberstone IlluminaActive · 54% built | SRIVARI DWELLINGS | Apartment | 793–1,071 sqft carpet (as filed) | Dec 2028 |
8 of 170 other projects in Kanakapura Road, A to Z. Status is taken from each project's own filing.
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Self development | |
| Nearest city water main | 6.9 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 770 m to the east, tertiary drain | |
|---|---|---|
| Ground level | 753 m above sea level, plus or minus 4 m | |
| Metro, operational | 5.9 km, Silk Institute | |
| Metro, under construction | 11.4 km, Kalena Agrahara |
| Kempegowda Airport | 57.5 | 60 | 48.0 |
| MG Road (CBD) | 24.5 | 27 | 20.8 |
| Manyata Tech Park | 33.0 | 38 | 28.6 |
| ITPL, Whitefield | 41.7 | 45 | 31.4 |
| Ecospace, Bellandur ORR | 29.4 | 34 | 22.5 |
| Electronic City Ph 1 | 26.2 | 25 | 18.6 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 210 m to the east |