Building plan (Local Planning Authority)Sanctioned 12 Jul 2024No. APA/CC/57/2024-25 and APA/CC/279/2024-25
RERA extensionsNone on the filingFiling read 31 Oct 2026
Land conversionConverted, 19 of 19 parcelsDates and authorities below
Permits
Validity
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
We haven't verified this for this project yet.
Sign in first, then it is one click.
Not verified yet: Forfeiture, agreement; Forfeiture, allotment letter; Transfer fee; Maintenance included; Agreement and allotment letter; Payment plan; Agreement for sale.
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Unit mix filed
Location & risks
What is the location like?
Review2 to review
Groundwater, taluk average21.3 m below groundAnekal taluk, July 2023
Water supply, as filedOtherDeclared by the promoter
Metro, operational
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion46%As of Q2 2026-27, promoter's return
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Review1 to review
Sold727 / 1,016As of Q2 2026-27
Sold in Q2 2026-275!ReviewReview
Funding
Estimated cost
Loan & collateral
Can it be financed?
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Building plan
Sanctioned 12 Jul 2024
Escrow bank
KOTAK MAHINDRA BANK · MG Road, Branch
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
345 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Title & ownership, Disputes & cases and DocumentsUnlock
DOSL Score
54/100
Red flag
23rd percentile in BengaluruHigher than 194 of 844 scored projects
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
3 bedroom + 3 toilet · 105 m² 25.2%2 bedroom + 2 toilet + study · 73 m² 14.1%4 bedroom + 3 toilet + maids room · 154 m² 7.2%1 bedroom + 1 toilet + study · 40 m² 7.2%9 other types 46.3%
Unit types
1 bedroom + 1 toilet
28
409
1 bedroom + 1 toilet + study
56
431
2 bedroom + 2 toilet
55
753
2 bedroom + 2 toilet
56
764
2 bedroom + 2 toilet + study
110
786
2 bedroom + 2 toilet + study
28
850
3 bedroom + 2 toilet
55
980
3 bedroom + 2 toilet
56
1,001
3 bedroom + 3 toilet
27
1,098
3 bedroom + 3 toilet
196
1,130
4 bedroom + 3 toilet + maids room
28
1,636
4 bedroom + 3 toilet + maids room
28
1,679
4 bedroom + 3 toilet + maids room
56
1,658
Floor plans, brochure
No floor plans on file
Unsold stock
K-RERA inventory
Sold, Q2 2026-27
727 / 1,016
Unsold, Q2 2026-27
289
Months to sell, derived from filed bookings
90 months
The area
Comparable projects
Filed prices nearby
Basemap: Esri, OpenStreetMap contributors
Map of 3 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Abhee Serenity Springs, price locked; Shriram Sapphire (Codename Ultimate), price locked; Vasuki Vallabha, price locked.
This project
Padlock: that project's price is part of its own report
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; South Bengaluru, past year; Bengaluru, past year; South Bengaluru since 2022; This project vs South Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Bengaluru median yield.
2.1 kmBommasandra
The site
Zoning & hazards
Power lines and drains
Basemap: Esri, OpenStreetMap contributors
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
Not verified yet: Possession, agreement; Structure; Structural safety certificate; Internal roads; Club house; Foundation; Wall material; Wall thickness; Concrete / steel grade; Windows; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Sewage plant; Design consultants (Form 6).
Land · ₹398.42 Cr 34.2%Development · ₹767.04 Cr 65.8%
Form 4
Estimated cost, at registration
₹1165.46 Cr
Estimated cost, engineer's certificate
₹767.04 Cr
Estimated cost, Form 4 Q2 2026-27
₹1165.46 Cr
Cost incurred
₹534.38 Cr (45.9% of the Form 4 Q2 2026-27 estimate)
Sales
Sold vs unsold, Q2 2026-27
Sold (727) 71.6%Unsold (289) 28.4%
Sold per quarter
K-RERA inventory
Sold, Q3 2025-26
698 / 1,016 · 318 available
Sold, Q4 2025-26
714 / 1,016 · 302 available
Sold, Q1 2026-27
722 / 1,016 · 294 available
Sold, Q2 2026-27
727 / 1,016 · 289 available
Unsold, Q2 2026-27
289
Sold in Q4 2025-26
16
Sold in Q1 2026-27
8
Sold in Q2 2026-27
5
Flats booked, Form 4 Q1 2026-27
714
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
KOTAK MAHINDRA BANK · MG Road, Branch
Designated account, collected
₹128.37 Cr in Q2 2026-27
Designated account, withdrawn
₹61.43 Cr in Q2 2026-27 (48% of that quarter's deposits)
Sale proceeds realised, Q2 2026-27
₹67,33,00,000
Track record
Average schedule slip
DOSL builder track
K-RERA registrations under this promoter
36
Marked completed
13
Past promised date, not completed
8
Revoked or withdrawn
1
Other phases under this promoter name
31
With a filed extension or completion
13 (11 completed, 2 extended)
Average schedule slip
19 months
Not verified yet: Receivable, sold flats; Cost left; Cost left vs buyer dues; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Anekal taluk average, July 2023: 21.3 m below ground
What it means
20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class
Through the year
January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several)
Water supply, as filed
Other
Nearest city water main
4.9 km
!Review
Distances
Within 3 km
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.