Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Survey | Land converted | Sale deed | Khata |
|---|
Approvals
| Building plan (BIAPPA) | Sanctioned 22 May 2023 · No. BIAAPA/TP/LAO/136/2022-23/23-24 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Forfeiture, agreement | The booking amount |
|---|
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹5.30 Cr 19.7%Development · ₹21.66 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 3 Apr 2023 | Review |
| Building plan (BIAPPA) | Sanctioned 22 May 2023 | |
| Escrow bank | HDFC · Richmond Road, Bangalore |
Data room
221 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 4 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 4 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 2 | – | Review |
| Construction & progress | – | 1 | – | Review |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | 1 | – | Review |
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| AamayaActive · 7% built | SRK INFRA PROJECTS PRIVATE LIMITED | Plot | ~7,780–16,060 sqft (estimate: filed carpet plus 25%) | Jan 2029 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Abhi HomesExtended to 30-12-2026 | ABHI DEVELOPERS | Apartment | – | Dec 2026 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Adarsh Savana Phase 2Registered · no quarterly update yet | ALEKHYA PROPERTY DEVELOPMENTS PVT LTD. | Plot | ~1,200–3,190 sqft (estimate: filed carpet plus 25%) | Jun 2029 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
8 of 293 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open By The Lake in the interactive atlas
| Extent |
|---|
| Survey 44 | ||||
|---|---|---|---|---|
| 44/1 (part) | 12 Oct 2004Assistant Commissioner, Doddaballapura Sub-Division | 20 Nov 2004in favour of M/s Nam Estates Private Limited | 15 Jun 2023E Khatha | 3 Acres 21 Guntas |
| 44/2 (part), 44/3 (part) | 25 Mar 2004Assistant Commissioner, Doddaballapura Sub-Division | 29 Jun 2004in favour of M/s Nam Estates Private Limited | 15 Jun 2023E Khatha | 5 Acres 37 Guntas + 5 Acres 38 Guntas |
| 45/2 (part) | 25 Mar 2004Assistant Commissioner, Doddaballapura Sub-Division | 29 Jun 2004in favour of M/s Nam Estates Private Limited | 15 Jun 2023E Khatha | 3 Acres 02 Guntas |
|---|
| 57/3 (part), 57/4 (part) | 8 Aug 2012Assistant Commissioner, Doddaballapura Sub-Division | 14 Sep 2012in favour of M/s Nam Estates Private Limited | 15 Jun 2023E Khatha | 2 Acres 09 ½ Guntas + 1 Acre |
|---|
| Survey 58 | ||||
|---|---|---|---|---|
| 58/1 (part) | 8 Aug 2012Assistant Commissioner, Doddaballapura Sub-Division | 26 Apr 2005in favour of M/s Nam Estates Private Limited | 16 Jun 2023E Khatha | 1 Acre |
| 58/2 (part) | 8 Aug 2012Deputy Commissioner, Bangalore Rural District. | 14 Sep 2012in favour of M/s Nam Estates Private Limited | 16 Jun 2023E Khatha | 1 Acre |
| 58/3 (part) | 20 Oct 2015Deputy Commissioner, Bangalore Rural District. | 4 Dec 2015in favour of M/s Nam Estates Private Limited | 16 Jun 2023E Khatha | 1 Acre |
K-RERA filing, land schedule
Deeds read, and the whole project
Transfer of the land
Title deed executed
Sy 44/2; 44/3; 45/1; 45/2, Kundana hobli, Devanahalli taluk
Title deed filed with K-RERA, pp. 1, 9 · See it in Documents
Transfer of the land
Title deed executed
Sy 44/2; 44/3; 45/1; 45/2, Kundana hobli, Devanahalli taluk
Title deed filed with K-RERA, pp. 1, 9 · See it in Documents
Transfer of the land
Title deed executed
Sy 44/2; 44/3; 45/1; 45/2, Kundana hobli, Devanahalli taluk
Title deed filed with K-RERA, pp. 1, 9 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹13.4 L · Sy 57/4; 57/1, Kundana hobli, Devanahalli taluk · 1 Acre
Title deed filed with K-RERA, pp. 1, 7, 10 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹47.5 L · Sy 57/3; 57/1, Hegganahalli village, Devanahalli taluk
Title deed filed with K-RERA, pp. 1, 8, 11 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹12.3 L · Sy 58/2, Hegganahalli village, Devanahalli taluk · 1 Acre
Title deed filed with K-RERA, pp. 1, 7, 10 · See it in Documents
Approval or registration
Building plan sanctioned
BIAPPA · plan BIAAPA/TP/LAO/136/2022-23/23-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/303/PR/270723/006101
K-RERA registration
Approval or registrationTransfer of the landTitle check
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 3 Apr 2023 |
|---|
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of 20 of the encumbrance certificate. Filed with K-RERA: SEIIAA_Springs modified EC 2022, 20 pages, English.
| Filed survey numbers matched to the KGIS map | 4 of 4 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 1,30,390 sq m | |
| Extent the filed land schedule names for these survey numbers | 74,664 sq m | |
| Plot area against the filed extent | 1.75 times | |
| Village, hobli and taluk on the KGIS map | J.I. Hegganahalli, Kundana hobli, Devanahalli taluk | |
| Sy. 45/2(P): filed extent, KGIS plot | 12,343 sq m, 22,565 sq m |
Satellite map with the 4 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 4 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Survey numbers | 44/1(P), 44/2(P), 44/3(P), 45/2(P), 57/3(P), 57/4(P) and 3 more | |
|---|---|---|
| Whole survey numbers on the KGIS map | 1,30,390 sq m (the project holds a share) | |
| Khata | E Khatha · 15 Jun 2023; E Khatha · 16 Jun 2023 | |
| Sale deed | Dated 29 Jun 2004, 20 Nov 2004, 26 Apr 2005 and 2 more | |
| Sale deed in favour of | M/s Nam Estates Private Limited | |
| Title deed | Consideration ₹22.0 L | |
| Title deed | Consideration ₹4.5 L · Sy 58 · 1 Acre |
| Fire department |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2024 |
| Land conversion | 9 of 9 parcels converted | |
|---|---|---|
| Sy 44/1(P) | Converted 12 Oct 2004 · Assistant Commissioner, Doddaballapura Sub-Division | |
| Sy 44/2(P), 44/3(P), 45/2(P) | Converted 25 Mar 2004 · Assistant Commissioner, Doddaballapura Sub-Division | |
| Sy 57/3(P), 57/4(P), 58/1(P) | Converted 8 Aug 2012 · Assistant Commissioner, Doddaballapura Sub-Division | |
| Sy 58/2(P) | Converted 8 Aug 2012 · Deputy Commissioner, Bangalore Rural District. | |
| Sy 58/3(P) | Converted 20 Oct 2015 · Deputy Commissioner, Bangalore Rural District. | |
| Survey numbers | 44/1(P) · 44/2(P) · 44/3(P) · 45/2(P) · 57/3(P) · 57/4(P) · 58/1(P) · 58/2(P) · 58/3(P) |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Defect liability | 5 years |
|---|
| Fortius Good Earth | about 1 km | Locked |
|---|
| Vaishnavi At-One Life IV | about 2 km | Locked |
|---|
| Earth Aroma Phase-2 | about 2 km | Locked |
|---|
| Earth Aroma | about 2.5 km | Locked |
|---|
| Ekta Elements | about 6 km | Locked |
|---|
| By The Lake This project | This project is the point the others are measured from | 31 Dec 2024 | – | Not verified yet |
|---|---|---|---|---|
| Fortius Good Earth | about 1 km | 31 Dec 2027 | – | Locked |
| Vaishnavi At-One Life IV | about 2 km | 18 Dec 2027 | – | Locked |
| Earth Aroma Phase-2 | about 2 km | 31 Dec 2025 | – | Locked |
| Earth Aroma | about 2.5 km | 31 Dec 2024 | – | Locked |
| Ekta Elements | about 6 km | 31 Dec 2027 | – | Locked |
| Projects within 4 km, counted | 18 (18 with an approximate location) | |
|---|---|---|
| Plots in them | 9,257 | |
| Booked | 6,816 of 9,257 (74%) | |
| Unsold | 2,441 | |
| Booked a month, pooled | 234 plots | |
| Months to sell, pooled | 7 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Agriculture, over the filed survey numbers | Review |
|---|---|---|
| Nearest government-flagged flood location | about 11.5 km, Kondappa layout | |
| Government land in the filed surveys | Sy 57: 2% of the parent survey, 0.12 of 5.68 acres | Review |
| Nearest storm drain | about 2 km to the south, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
| Possession, agreement | 31 Dec 2024 | |
|---|---|---|
| RERA completion date | 31 Dec 2024 | Review |
| Work began, as filed | 15 Jul 2023 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Architect's certificate, registration | Dated 6 Jun 2023 · site inspected 6 Jun 2023 | |
|---|---|---|
| Engineer's certificate, registration | Dated 6 Jun 2023 | |
| Chartered accountant's certificate, registration | Dated 12 Jun 2023 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹26.96 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹15.00 Cr |
| Escrow bank | HDFC · Richmond Road, Bangalore |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class | |
| Through the year | January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several) | |
| Water supply, as filed | Local authority (Panchayath) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 2 km to the south, tertiary drain | |
|---|---|---|
| Metro, operational | about 21.5 km, Jalahalli | |
| Metro, under construction | about 4 km, Doddajala |
| Kempegowda Airport | 14 | 10 |
| MG Road (CBD) | 32 | 26 |
| Manyata Tech Park | 27.5 | 18.5 |
| ITPL, Whitefield | 44 | 28.5 |
| Ecospace, Bellandur ORR | 47.5 | 32.5 |
| Electronic City Ph 1 | 52 | 42 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 2.5 km to the south-east | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |