Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate.
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 18 Nov 2020 |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹19.38 Cr |
|---|
Loan & collateral
| Escrow bank | Canara Bank · BANGALORE SPLSD GOVT BUSINES BRANCHS |
|---|
Data room
62 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | 1 | – | Review |
| Loan & collateral | – | – | – | – |
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh PinecourtLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | 382–1,141 sqft carpet (as filed) | Mar 2026 |
| Adarsh PinecourtWithdrawn | Nusrath Unisa | Apartment | – | Nov 2023 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
| Amigo PalacioActive · 40% built | AMIGO SHELTERS PVT LTD | Apartment | 1,044–1,480 sqft carpet (as filed) | Mar 2028 |
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
8 of 185 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
All 195 projects in Hennur Road → · Rajiv Gandhi Housing Corporation Limited's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Cm 1 Lakh Multi Storey Bengaluru Housing Prg in the interactive atlas
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Land area of this registration | 7,619 sq m |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 7 Mar 2024 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Vkk Grand | about 1 km | Locked |
|---|
| Legacy Saviero | about 2 km | Locked |
|---|
| SOBHA Victoria Park Phase 1 | about 3 km | Locked |
|---|
| Lodha Mirabelle | about 3 km | Locked |
|---|
| Brr North Excellency Phase I | about 3 km | Locked |
|---|
| Mirabelle Phase 2 | about 3 km | Locked |
|---|
| Nava Skanda Bellavita | about 3.5 km | Locked |
|---|
| Sumadhura Solea | about 4 km | Locked |
|---|
| Sumadhura Epitome | about 4 km | Locked |
|---|
| The Pearl Paradise | about 4.5 km | Locked |
|---|
| Sattva La Vita | about 4.5 km | Locked |
|---|
| Sobha City Athena | about 5 km | Locked |
|---|
| Cm 1 Lakh Multi Storey Bengaluru Housing Prg This project | This project is the point the others are measured from | 7 Mar 2024 | – | Not verified yet |
|---|---|---|---|---|
| Vkk Grand | about 1 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
| Legacy Saviero | about 2 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
| SOBHA Victoria Park Phase 1 | about 3 km | 31 Dec 2027 | 93% (280 of 300) | Locked |
| Lodha Mirabelle | about 3 km | 30 Jun 2028 | 96% (418 of 437) | Locked |
| Brr North Excellency Phase I | about 3 km | 31 Dec 2029 | 33% (34 of 104) | Locked |
| Mirabelle Phase 2 | about 3 km | 31 May 2030 | 61% (173 of 284) | Locked |
| Projects within 4 km, counted | 33 (33 with an approximate location) | |
|---|---|---|
| Flats in them | 5,004 | |
| Booked | 2,686 of 5,004 (54%) | |
| Unsold | 2,318 | |
| Booked a month, pooled | 41 flats | |
| Months to sell, pooled | 56 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 0.5 km, Vaddara palya, Near Hennur Bande |
|---|
| Nearest storm drain | about 0.5 km, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Local authority |
| RERA completion date | 7 Mar 2024 | Red flag |
|---|---|---|
| Work began, as filed | 7 Mar 2019 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Escrow bank | Canara Bank · BANGALORE SPLSD GOVT BUSINES BRANCHS |
|---|
| K-RERA registrations under this promoter | 23 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 23 | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, primary drain | |
|---|---|---|
| Metro, operational | about 5 km, Benniganahalli | |
| Metro, under construction | about 1.5 km, Kalyan Nagar |
| Kempegowda Airport | 25.5 | 19.5 |
| MG Road (CBD) | 11 | 8 |
| Manyata Tech Park | 5.5 | 3 |
| ITPL, Whitefield | 15 | 11 |
| Ecospace, Bellandur ORR | 20.5 | 12.5 |
| Electronic City Ph 1 | 28 | 22 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km |