Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
130 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adarsh ParadiseActive · 87% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
| Adithya RicaCompleted · OC 28-12-2023 | ADITHYA CONSTRUCTIONS | Apartment | 769 sqft carpet (as filed) | Completed |
8 of 274 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Ds Max Skysampurn in the interactive atlas
Transfer of the land
Sale deed
Survey 41/1, 41/3
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 41/1, 41/3
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 41/2, 41/4
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 41/2, 41/4
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office, Bangalore Rural · Survey 41/1, 41/2
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office, Bangalore Rural · Survey 41/1, 41/2
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office, Bangalore Rural · Survey 41/3, 41/4
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office, Bangalore Rural · Survey 41/3, 41/4
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Rural Development and Panchayath Raj Dep · Survey 41/1, 41/2, 41/3, 41/4
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Rural Development and Panchayath Raj Dep · Survey 41/1, 41/2, 41/3, 41/4
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Rural Development and Panchayath Raj Dep · Survey 41/1, 41/2, 41/3, 41/4
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Rural Development and Panchayath Raj Dep · Survey 41/1, 41/2, 41/3, 41/4
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Hoskote Planning Authority · plan CC/625/2025-26
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/304/PR/270726/008848
K-RERA registration
Transfer of the landApproval or registrationThe parcels join the project
Described in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 41/1, 41/2, 41/3, 41/4 | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 18,717 sq m | |
| Khata | E Khatha · Rural Development and Panchayath Raj Dep · 5 Mar 2026 | |
| Sale deed | Dated 6 Oct 1975, 14 Dec 2011 | |
| Building plan (Hoskote Planning Authority) | Sanctioned 17 Apr 2026 · No. CC/625/2025-26 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Jun 2031 |
| Land conversion | 4 of 4 parcels converted | |
|---|---|---|
| Sy 41/1, 41/2 | Converted 28 Apr 2025 · DC Office, Bangalore Rural | |
| Sy 41/3, 41/4 | Converted 22 Sep 2025 · DC Office, Bangalore Rural | |
| Survey numbers | 41/1 · 41/2 · 41/3 · 41/4 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
3BHK · avg 91 m² 55.8%2BHK · avg 66 m² 44.2%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 272 | 712 |
| 3BHK | 343 | 983 |
| Sold, Q2 2026-27 | 34 / 615 | |
|---|---|---|
| Unsold, Q2 2026-27 | 581 |
| Jeevan's Allure | about 2.5 km | Locked | |
|---|---|---|---|
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | about 3 km | Locked | |
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | about 3 km | Locked | |
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | about 3 km | Locked |
| Ds Max Skysampurn This project | This project is the point the others are measured from | 30 Jun 2031 | 6% (34 of 615) | Not verified yet |
|---|---|---|---|---|
| Jeevan's Allure | about 2.5 km | 31 Jul 2027 | 32% (49 of 152) | Locked |
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | about 3 km | 31 Mar 2028 | 100% (210 of 210) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 3.5 km, Varthur police station | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.44 (886 covered spaces for 615 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 62 m
Across Hosakote, the water table sat 22.6 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 62 m, and it recovered 4.9 m over the year.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.6 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (Grama Panchayath) | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Main structure | Not started · planned by 20 Jun 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 16 Apr 2031 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 0% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 30 Jun 2031 | |
| RERA completion date | 30 Jun 2031 | |
| Work began, as filed | 1 Jul 2026 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 49.95 m filed | |
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 50 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Oct 2026 | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Oct 2026 | |
Land · ₹18.11 Cr 12.2%Development · ₹130.31 Cr 87.8%
| Estimated cost | ₹148.41 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (34) 5.5%Unsold (581) 94.5%
| Sold, Q2 2026-27 | 34 / 615 · 581 available | |
|---|---|---|
| Unsold, Q2 2026-27 | 581 |
| Escrow bank | Indian Bank · Kalyan Nagar | |
|---|---|---|
| Designated account, collected | ₹5.86 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹5.85 Cr in Q2 2026-27 (100% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 46 | |
|---|---|---|
| Marked completed | 26 | |
| Past promised date, not completed | 6 | |
| Complaints filed against the promoter | 19 | |
| Other phases under this promoter name | 40 | |
| With a filed extension or completion | 22 (19 completed, 3 extended) | |
| Average schedule slip | 22 months |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan | Sanctioned 17 Apr 2026 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Indian Bank · Kalyan Nagar | |
| Inspira Infinity | about 3.5 km | Locked |
|---|
| Poetry Of Earth | about 4 km | Locked |
|---|
| Leafy Delight | about 4 km | Locked |
|---|
| Assetz 66 & Shibui | about 4 km | Locked |
|---|
| Reflections 66 | about 4 km | Locked |
|---|
| Vintage Valley | about 4.5 km | Locked |
|---|
| Sowparnika Ashiyana Phase II | about 5 km | Locked |
|---|
| Sowparnika Rhythm of Rain | about 5 km | Locked |
|---|
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | about 3 km | 30 Apr 2026 | 100% (197 of 197) | Locked |
|---|
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | about 3 km | 30 Sep 2027 | 100% (192 of 192) | Locked |
|---|
| Inspira Infinity | about 3.5 km | 31 Jan 2029 | 95% (100 of 105) | Locked |
|---|
| Poetry Of Earth | about 4 km | 31 Dec 2028 | 23% (65 of 282) | Locked |
|---|
| Projects within 4 km, counted | 31 (31 with an approximate location) | |
|---|---|---|
| Flats in them | 9,270 | |
| Booked | 6,041 of 9,270 (65%) | |
| Unsold | 3,229 | |
| Booked a month, pooled | 204 flats | |
| Months to sell, pooled | 16 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 1.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 5 km, Channasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 29 |
| MG Road (CBD) | 19 |
| Manyata Tech Park | 20 |
| ITPL, Whitefield | 6 |
| Ecospace, Bellandur ORR | 10.5 |
| Electronic City Ph 1 | 16 |
| Sewage treatment plant |
|---|
| None within 3 km |
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 1 km |
|---|