Overview
Embassy Springs (Plots)
Overview
Embassy Springs (Plots)
Overview
Embassy Springs (Plots)
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate.
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire NOC | KSFES/NOC/63/2016 | Clear |
| Environmental clearance | SEIAA 70 CON 2021 · EC identification no. EC22B039KA136340 · issued 19 Jul 2022 |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹2014.23 Cr 80.2%Development · ₹497.00 Cr
Loan & collateral
| Escrow bank | HDFC · Richmond road |
|---|
Data room
128 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | 2 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 2 | 1 | Review |
| Construction & progress | – | 1 | – | Review |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| AamayaActive · 7% built | SRK INFRA PROJECTS PRIVATE LIMITED | Plot | ~7,780–16,060 sqft (estimate: filed carpet plus 25%) | Jan 2029 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Abhi HomesExtended to 30-12-2026 | ABHI DEVELOPERS | Apartment | – | Dec 2026 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Adarsh Savana Phase 2Registered · no quarterly update yet | ALEKHYA PROPERTY DEVELOPMENTS PVT LTD. | Plot | ~1,200–3,190 sqft (estimate: filed carpet plus 25%) | Jun 2029 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
8 of 293 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
All 308 projects in Devanahalli → · Embassy Group's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Embassy Springs (Plots) in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 8,56,422 sq m |
|---|
| Airport height NOC (1 of 3) | NOC ID BIAL/SOUTH/B/070114/44716 |
|---|
| Airport height NOC (2 of 3) | NOC ID BIAL/SOUTH/B/070114/44757 |
|---|
| Airport height NOC (3 of 3) | NOC ID BIAL/SOUTH/B/070114/44789 |
|---|
| KSPCB | Filed with the registration |
|---|
| RERA extensions | Granted · Approved 6 Dec 2019 | |
|---|---|---|
| RERA completion date | 31 Mar 2023 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Map of 2 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Earth Aroma Phase-2, price locked; Earth Aroma, price locked.
| Fortius Good Earth | about 2 km | Locked | |
|---|---|---|---|
| Vaishnavi At-One Life IV | about 2.5 km | Locked | |
| Earth Aroma Phase-2 | 2.9 km | Locked | |
| Earth Aroma | 3.3 km | Locked | |
| Ekta Elements | 5.1 km | Locked |
| Embassy Springs (Plots) This project | This project is the point the others are measured from | 31 Mar 2023 | – | Not verified yet |
|---|---|---|---|---|
| Fortius Good Earth | about 2 km | 31 Dec 2027 | – | Locked |
| Vaishnavi At-One Life IV | about 2.5 km | 18 Dec 2027 | – | Locked |
| Earth Aroma Phase-2 | 2.9 km | 31 Dec 2025 | – | Locked |
| Earth Aroma | 3.3 km | 31 Dec 2024 | – | Locked |
| Ekta Elements | 5.1 km | 31 Dec 2027 | – | Locked |
| Projects within 4 km, counted | 22 (14 with an approximate location) | |
|---|---|---|
| Plots in them | 14,886 | |
| Booked | 9,536 of 14,886 (64%) | |
| Unsold | 5,350 | |
| Booked a month, pooled | 256 plots | |
| Months to sell, pooled | 18 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture | Review |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 220 kV, 70 m from the site | Clear |
| Nearest government-flagged flood location | 11.2 km, Kondappa layout |
| Nearest storm drain | 1.7 km to the south, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 40 m to the south, an unnamed water body |
| RERA completion date | 31 Mar 2023 | Review |
|---|---|---|
| Work began, as filed | 17 Oct 2016 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety | KSFES/NOC/63/2016 | |
|---|---|---|
| Environmental clearance | SEIAA 70 CON 2021 · EC identification no. EC22B039KA136340 · issued 19 Jul 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹2511.23 Cr |
|---|
| Escrow bank | HDFC · Richmond road |
|---|
| K-RERA registrations under this promoter | 10 | |
|---|---|---|
| Marked completed | 3 | |
| Past promised date, not completed | 2 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class | |
| Through the year | January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several) | |
| Water supply, as filed | Self development | |
| Nearest city water main | 7.3 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 1.7 km to the south, tertiary drain | |
|---|---|---|
| Ground level | 934 m above sea level, plus or minus 4 m | |
| Metro, operational | 21.6 km, Peenya | |
| Metro, under construction | 3.3 km, Doddajala |
| Kempegowda Airport | 12.9 | 17 | 9.3 |
| MG Road (CBD) | 31.0 | 35 | 25.9 |
| Manyata Tech Park | 26.2 | 30 | 18.1 |
| ITPL, Whitefield | 42.9 | 47 | 27.7 |
| Ecospace, Bellandur ORR | 46.5 | 55 | 32.1 |
| Electronic City Ph 1 | 50.8 | 59 | 41.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | 1.5 km to the south-east | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 2.6 km to the south-east |