Building plan (BDA)Sanctioned 24 Sep 2025No. BDA/PS/EM/EO-3/TA-02/South/15/2025-26
RERA extensionsNone on the filingFiling read 31 Oct 2026
Land conversionConverted 27 Mar 2024DC Bengaluru
Permits
Validity
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
Locked
Forfeiture, agreement•• %
Forfeiture, allotment letterNot verified yet
Transfer feeNot verified yet
Maintenance includedNot verified yet
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Unit mix filed
West · avg 166 m² 51.3%East · avg 172 m²
Location & risks
What is the location like?
Review1 to review
Groundwater, taluk average21.3 m below groundAnekal taluk, July 2023
Water supply, as filedOtherDeclared by the promoter
Metro, operationalabout 5 kmHebbagodi
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion18%As of Q2 2026-27, promoter's return
Possession, agreement30 Sep 2030Agreement for sale, p. 11
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Clear1 clear
Receivable, sold houses₹8.83 CrAs of Q2 2026-27
Cost left₹78.48 CrAs of Q2 2026-27
Sold6 / 117As of Q2 2026-27
Sold in Q2 2026-272✓ClearClear
Funding
Estimated cost
Loan & collateral
Can it be financed?
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Building plan (BDA)
Sanctioned 24 Sep 2025
Escrow bank
AU Small Finance Bank · CHANDRA LAYOUT
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
136 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Contract & costs, Title & ownership, Disputes & cases and DocumentsUnlock
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026.
"Transparent pricing, clear communication, and professional staff! Booking an under-construction villa with this Builder EVERSHINE STONEPARK AT Anekal has been a smooth journey. Their adherence to RERA Compliance regulations and commitment…
MManju bps4 Jun 2026★★★★★
As the name says it all most trusted builder and they have already have completed projects tooo and my recent visit to the new project I liked personally and well planned fast bookings are going on.... That's because of Evershine builder's
RRamesh Pullai3 Jun 2026★★★★★
Evershine StonePark is a fantastic residential project in a fast-developing neighborhood. Checking out Evershine Dwellings' website, it is clear they value both premium features and robust structural quality. The community planning looks…
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Evershine Stonepark in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Encumbrance certificate, Form 15
Survey sketch
Survey sketch filed with K-RERA
Sketch, sanction and mutation vs KGIS map
₹ ••,•••
•• %
•• ••• ••••
•••••
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
Not verified yet
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; South Bengaluru, past year; Bengaluru, past year; South Bengaluru since 2022; This project vs South Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Not verified yet: Structure; Structural safety certificate; Internal roads; Foundation; Wall material; Wall thickness; Concrete / steel grade; Windows; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per house; Sewage plant; Design consultants (Form 6); Fire safety.
Land · ₹9.72 Cr 9.9%Development · ₹88.58 Cr 90.1%
Cost left vs buyer dues
Form 4
Estimated cost, at registration
₹98.30 Cr
Estimated cost, architect's and engineer's certificates
₹86.23 Cr
Cost incurred
₹19.82 Cr (20.2% of the estimate)
Cost left
₹78.48 Cr
Receivable, sold houses
₹8.83 Cr
Sales
Sold vs unsold, Q2 2026-27
Sold (6) 5.1%Unsold (111) 94.9%
Sold per quarter
K-RERA inventory
Sold, Q4 2025-26
3 / 117 · 114 available
Sold, Q1 2026-27
4 / 117 · 113 available
Sold, Q2 2026-27
6 / 117 · 111 available
Unsold, Q2 2026-27
111
Sold in Q1 2026-27
1
Sold in Q2 2026-27
2
3 BHK, sold
6 / 117
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
AU Small Finance Bank · CHANDRA LAYOUT
Designated account, collected
₹78.0 L in Q2 2026-27
Designated account, withdrawn
₹78.0 L in Q2 2026-27 (100% of that quarter's deposits)
Amount withdrawable, Form 4
₹17,01,58,262
Net amount withdrawable, Form 4
₹9,24,47,562
Withdrawn from the escrow account to date
₹7,77,10,700
Not verified yet: Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Anekal taluk average, July 2023: 21.3 m below ground
What it means
20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class
Through the year
January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several)
Water supply, as filed
Other
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot