Overview
Green Field Gardens Extension-1b
Overview
Green Field Gardens Extension-1b
Overview
Green Field Gardens Extension-1b
Overview
Title & ownership
Approvals
| Building plan (BIAPPA) | Sanctioned 11 May 2022 · No. BIAPPA/TP/LAO/17/2021-22/319 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹3.58 Cr 65.4%Development · ₹1.89 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BIAPPA) | Sanctioned 11 May 2022 | |
| Escrow bank | UCO Bank · Cantonment Branch |
Data room
91 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 4square Park SierraActive · 29% built | 4SQUARE ESTATES | Apartment | 1,083 sqft carpet (as filed) | Dec 2029 |
| Adithya TranquilLapsed · completion date passed | ADITHYA DEVELOPERS | Apartment | – | Jan 2023 |
| Aditi North StarActive · 0% built | ADI DEVELOPERS | Apartment | – | Dec 2030 |
| Aditrri LotusExtended to 20-12-2026 | ADITRRI BUILDERS AND DEVELOPERS | Apartment | 839 sqft carpet (as filed) | Dec 2026 |
| Affinity GardeniaActive · 95% built | AFFINITY PROPERTIES LLP | Apartment | 682–853 sqft carpet (as filed) | Dec 2026 |
| After the RainCompleted · OC 30-04-2022 | Total Environment | Villa | 3,184–5,182 sqft | Completed |
| After the Rain - Phase II ACompleted · OC 10-01-2024 | Total Environment Building Systems Private Limited | Mixed development | 290–2,669 sqft carpet (as filed) | Completed |
| After the Rain Phase IIIActive · 3% built | TOTAL ENVIRONMENT BUILDING SYSTEMS PVT LTD | Apartment | 2,643–6,964 sqft carpet (as filed) | Apr 2032 |
8 of 135 other projects in Yelahanka, A to Z. Status is taken from each project's own filing.
All 141 projects in Yelahanka → · Telecom Employees Co-Operative Housing Society LTD's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Green Field Gardens Extension-1b in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2028 |
| Land conversion | Converted 7 Jan 2021 · DC Bengaluru | |
|---|---|---|
| Survey numbers | 53-1 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Vaishnavi At-One Life IV | about 4 km | Locked |
|---|
| Fortius Good Earth | about 4.5 km | Locked |
|---|
| Earth Aroma Phase-2 | about 5 km | Locked |
|---|
| Earth Aroma | about 5.5 km | Locked |
|---|
| Ekta Elements | about 6.5 km | Locked |
|---|
| Green Field Gardens Extension-1b This project | This project is the point the others are measured from | 31 Dec 2028 | – | Not verified yet |
|---|---|---|---|---|
| Vaishnavi At-One Life IV | about 4 km | 18 Dec 2027 | – | Locked |
| Fortius Good Earth | about 4.5 km | 31 Dec 2027 | – | Locked |
| Earth Aroma Phase-2 | about 5 km | 31 Dec 2025 | – | Locked |
| Earth Aroma | about 5.5 km | 31 Dec 2024 | – | Locked |
| Ekta Elements | about 6.5 km | 31 Dec 2027 | – | Locked |
| Projects within 4 km, counted | 19 (19 with an approximate location) | |
|---|---|---|
| Plots in them | 9,579 | |
| Booked | 5,567 of 9,579 (58%) | |
| Unsold | 4,012 | |
| Booked a month, pooled | 202 plots | |
| Months to sell, pooled | 16 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Agriculture, over the filed survey numbers | Review |
|---|---|---|
| Nearest government-flagged flood location | about 7.5 km, Kondappa layout | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
| RERA completion date | 31 Dec 2028 | |
|---|---|---|
| Work began, as filed | 1 Oct 2022 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Architect's certificate, registration | Dated 3 Mar 2023 · site inspected 1 Mar 2023 | |
|---|---|---|
| Engineer's certificate, registration | Dated 15 Jan 2025 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹5.47 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹5.47 Cr |
| Escrow bank | UCO Bank · Cantonment Branch |
|---|
| K-RERA registrations under this promoter | 7 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 1 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 1 CGWB wells in Yelahanka taluk read in this class | |
| Through the year | January 2025: 3.8 m (1 well), Pre-monsoon 2025: 3.4 m (1 well), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Yelahanka taluk (the median where there are several) | |
| Water supply, as filed | Local authority (Bettahalasuru Grama Panchayathi) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 18 km, Peenya | |
| Metro, under construction | about 3 km, Bettahalasuru |
| Kempegowda Airport | 18 | 11 |
| MG Road (CBD) | 28 | 22.5 |
| Manyata Tech Park | 23.5 | 15 |
| ITPL, Whitefield | 39 | 25.5 |
| Ecospace, Bellandur ORR | 43.5 | 29 |
| Electronic City Ph 1 | 48 | 38.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 2.5 km to the north-west | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |