Quality of construction is really good. There is slight delay in the construction but he covered and put a right quality of everything. Location is big plus. In this location difficult to get BDA A khata Property.
Overview
Greenfinch Meadows
Overview
Greenfinch Meadows
Overview
Greenfinch Meadows
Overview
Photo: Greenfinch MeadowsTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (BBMP) | Sanctioned 16 Jul 2022 · No. BBMP/CC/1564/22-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 16 Jul 2022 | |
| Escrow bank | INDUSIND BANK · MG Road |
Data room
169 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
Quality of construction is really good. There is slight delay in the construction but he covered and put a right quality of everything. Location is big plus. In this location difficult to get BDA A khata Property.
We live in front of Greenfince Medwos Apartments. The view here is very amazing and beautiful. The environment is very peaceful, and we really enjoy living here. The overall experience is very good, and I would definitely recommend this…
It has been a transaparent and impressive journey with Greenfinch Meadows. The management is accessible and transparent. The progress of the project has been good. Additionally, the apartment's location and proximity to the Tech parks is…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
| Adarsh Palm RetreatLapsed · completion date passed | Adarsh Developers | Apartment | 975–5,250 sqft | – |
| Adarsh Palm Retreat Mayberry-Phase 1Lapsed · completion date passed | Akarsh Residence Pvt Ltd | Apartment | 1,757–2,706 sqft carpet (as filed) | Mar 2026 |
| Adarsh RosewoodActive · 15% built | Adarsh Developers | Apartment | 1,335–1,900 sqft | Dec 2027 |
| Aishwarya SiliconLapsed · completion date passed | M/s.AISHWARYA BUILDCON DEVELOPERS | Apartment | 1,084 sqft carpet (as filed) | Apr 2022 |
| August GrandCompleted (regulator flag) | August Ventures Private Limited | Apartment | 1,944 sqft carpet (as filed) | Completed |
| Balaji MonarchCompleted · OC 04-12-2020 | SRI BALAJI BUILDERS | Apartment | 835 sqft carpet (as filed) | Completed |
| Bilva ElinaLapsed · completion date passed | Jagadish v | Apartment | – | Jul 2019 |
| Carbon Corner StoneCompleted (regulator flag) | CARBON DEVELOPERS Pvt Ltd | Apartment | – | Completed |
8 of 44 other projects in Bellandur, A to Z. Status is taken from each project's own filing.
All 46 projects in Bellandur → · Greenfinch Projects Private Limited's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Greenfinch Meadows in the interactive atlas
Covers 21/3 only
Transfer of the land
Sale deed
Survey 21/3
K-RERA filing, land schedule
Covers 21/2 only
Transfer of the land
Sale deed
Survey 21/2
K-RERA filing, land schedule
Covers 21/3 only
Approval or registration
Land use converted
Deputy Commissioner Bangalore · Survey 21/3
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 22
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner Bangalore · Survey 22
K-RERA filing, land schedule
Covers 21/2 only
Approval or registration
Land use converted
Deputy Commissioner Bangalore · Survey 21/2
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Bruhut Bengaluru Mahanagara Palike · Survey 22, 21/3, 21/2
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Bruhut Bengaluru Mahanagara Palike · Survey 22, 21/3, 21/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/CC/1564/22-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/141022/005322
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
Page 1
Page 1 of 28 of the encumbrance certificate. Filed with K-RERA: Up to date EC of Sy No. 21/2, 21/3 and 22, 28 pages, English.
| Filed survey numbers matched to the KGIS map | 3 of 3 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 12,134 sq m | |
| Extent the filed land schedule names for these survey numbers | 7,892 sq m | |
| Plot area against the filed extent | 1.54 times | |
| Land area filed with K-RERA | 7,686 sq m | |
| Village, hobli and taluk on the KGIS map | Kariyammana Agrahara, VARTURU2 hobli, BANGALORE-EAST taluk | |
| Sy. 22: filed extent, KGIS plot | 4,047 sq m, 8,221 sq m | |
| Mutation entry | None open on 3 of 3 filed surveys |
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Survey numbers | 22, 21/3, 21/2 | |
|---|---|---|
| Land extent, Sy 22 | 1 Acre / 4046.82 sq m | |
| Land extent, Sy 21/3 | 16 Guntas / 1618.73 sq m | |
| Land extent, Sy 21/2 | 22 Guntas / 2225.75 sq m | |
| Whole survey numbers on the KGIS map | 12,134 sq m (the project holds a share) | |
| Land area of this registration | 7,686 sq m | |
| Khata | A Khatha · Bruhut Bengaluru Mahanagara Palike · 13 Dec 2021 | |
| Sale deed | Dated 2 Feb 1983, 28 Dec 1991, 2 Aug 2010 |
| Survey | Owners on the RTC | RTC extent | Filed extent | Map extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|---|
| Sy. No. 22 | Not read yet | 1 acre | 2 acres 1 gunta | Differs: 1 acre 1 gunta apart | 0 | ||
| Sy. No. 21/3 | Not read yet | 0 | |||||
| Sy. No. 21/2 | Not read yet | 0 |
| Landowner share | 37.5% |
|---|
| Fire NOC |
|---|
| KSFES/NOC/008/2022 · issued 8 Feb 2022 · building height 42.6 m | Clear |
| Environmental clearance | SEIAA 06 CON 2022 · EC identification no. EC22B038KA179310 · issued 7 May 2022 | Clear |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water and sewerage NOC (BWSSB) | issued 14 Sep 2022 |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Sep 2026 |
| Land conversion | 3 of 3 parcels converted | |
|---|---|---|
| Sy 22 | Converted 28 Mar 2017 · Deputy Commissioner Bangalore | |
| Sy 21/3 | Converted 21 Oct 2008 · Deputy Commissioner Bangalore | |
| Sy 21/2 | Converted 3 Sep 2021 · Deputy Commissioner Bangalore | |
| Survey numbers | 22 · 21/3 · 21/2 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Bt3-2BHK · 73 m² 6.6%Bt4-3BHK · 94 m² 6.6%At1-2BHK · 70 m² 6.6%At6-2BHK · 70 m² 6.6%23 other types 73.5%
| Af1-2BHK | 1 | 753 |
| Af2-2BHK | 1 | 775 |
| Af3-2BHK | 1 | 764 |
| Af4-2BHK | 1 | 764 |
| Af5-2BHK | 1 | 775 |
| Af6-2BHK | 1 | 753 |
| At1-2BHK | 12 | 753 |
| At2-2BHK | 12 | 775 |
| At3-2BHK | 12 | 764 |
| At4-2BHK | 12 | 764 |
| At5-2BHK | 12 | 775 |
| At6-2BHK | 12 | 753 |
| Bf1-2BHK | 1 | 775 |
| Bf2-2BHK | 1 | 753 |
| Bf3-2BHK | 1 | 797 |
| Bf4-3BHK | 1 | 1,012 |
| Bf5-2BHK | 1 | 764 |
| Bf6-2BHK | 1 | 764 |
| Bf7-3BHK | 1 | 958 |
| Bt1-2BHK | 12 | 775 |
| Bt2-2BHK | 12 | 753 |
| Bt3-2BHK | 12 | 786 |
| Bt4-3BHK | 12 | 1,012 |
| Bt5-2BHK | 12 | 764 |
| Bt6-2BHK | 12 | 764 |
| Bt7-3BHK | 12 | 969 |
| Bt8-2BHK | 12 | 753 |
| Sold, Q2 2026-27 | 108 / 181 | |
|---|---|---|
| Unsold, Q2 2026-27 | 73 | |
| Months to sell, derived from filed bookings | 39 months |
| Adarsh Parkland | about 2 km | Locked | |
|---|---|---|---|
| Adarsh Rosewood | about 2.5 km | Locked | |
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 3 km | Locked | |
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 3 km | Locked | |
| SOBHA Neopolis Phase 3 - W 1, 2, 10 & 11 | about 3 km | Locked | |
| SOBHA Neopolis Phase 4 - 3, 4, 8 & 9 | about 3 km | Locked | |
| SOBHA Neopolis | about 3 km | Locked | |
| Satori Residence By Genurise | about 4 km | Locked | |
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 And 22 | about 4 km | Locked | |
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58 | about 4 km | Locked | |
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | about 4 km | Locked | |
| Sobha Sentosa Phase 1 Wing 7 | about 4 km | Locked |
| Greenfinch Meadows This project | This project is the point the others are measured from | 30 Sep 2026 | 60% (108 of 181) | Not verified yet |
|---|---|---|---|---|
| Adarsh Parkland | about 2 km | – | – | Locked |
| Adarsh Rosewood | about 2.5 km | 31 Dec 2027 | 20% (24 of 122) | Locked |
| SOBHA Neopolis Phase 2 - W 12 & 13 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | 62% Industrial (hi-tech), 38% Valley / drain buffer, over the filed survey numbers | Review |
|---|---|---|
| Nearest government-flagged flood location | about 1.5 km, Deepa nursing home | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 100% | |
| Electricity, built | 100% | |
| Outdoor Sports facility, built | 100% | |
| Swimming Pool, built | 100% | |
| Parks, built | 100% | |
| Water and Sanitation, built | 100% | |
| Covered parking per unit | 0.98 (178 covered spaces for 181 units) | |
| Power backup | Declared by the promoter |
As the promoter reported itPossession date in the agreement
| Main structure | 100% · planned by 31 Dec 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 31 Mar 2026 | |
| Club house | 100% | |
| Completion | 100% |
| Possession, agreement | 30 Sep 2026 | |
|---|---|---|
| Schedule end | 30 Sep 2026 | |
| RERA completion date | 30 Sep 2026 | |
| Work began, as filed | 1 Jul 2022 |
| Building heights, fire NOC | 42.6 m on the fire NOC · 42.6 m filed, 2 towers |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided |
|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Fire safety | KSFES/NOC/008/2022 · issued 8 Feb 2022 · building height 42.6 m | |
| Environmental clearance | SEIAA 06 CON 2022 · EC identification no. EC22B038KA179310 · issued 7 May 2022 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 21 Jul 2022 · site inspected 19 Jul 2022 | |
| Engineer's certificate, registration | Dated 8 Aug 2022 | |
| Chartered accountant's certificate, registration | Dated 26 Jul 2022 | |
| Architect's quarterly progress certificate dated | 6 Oct 2026 | |
| Architect's site inspection for the quarterly progress certificate | 3 Oct 2026 |
Land · ₹11.10 Cr 15.2%Development · ₹62.00 Cr 84.8%
| Estimated cost, at registration | ₹73.10 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹62.00 Cr | |
| Estimated cost, chartered accountant's certificate | ₹75.44 Cr | |
| Estimated cost, Form 4 Q2 2026-27 | ₹85.49 Cr |
Sold (108) 59.7%Unsold (73) 40.3%
| Sold, Q3 2025-26 | 91 / 181 · 90 available | |
|---|---|---|
| Sold, Q4 2025-26 | 94 / 181 · 87 available | |
| Sold, Q1 2026-27 | 98 / 181 · 83 available | |
| Sold, Q2 2026-27 | 108 / 181 · 73 available | |
| Unsold, Q2 2026-27 | 73 | |
| Sold in Q4 2025-26 | 3 | |
| Sold in Q1 2026-27 | 4 | |
| Sold in Q2 2026-27 | 10 |
| Escrow bank | INDUSIND BANK · MG Road | |
|---|---|---|
| Designated account, collected | ₹3.16 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹3.16 Cr in Q2 2026-27 (100% of that quarter's deposits) | |
| Net amount withdrawable, Form 4 | ₹14,60,53,555 | |
| Escrow account, Q1 2026-27 | ₹1.85 Cr deposited from sales, ₹2.32 Cr withdrawn | |
| Escrow account to date, Q1 2026-27 | ₹59.80 Cr deposited from sales, ₹59.80 Cr withdrawn | |
| Withdrawn from the escrow account to date | ₹62,95,93,634 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 3 km |
| 31 Dec 2030 |
| 98% (220 of 225) |
| Locked |
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 3 km | 31 Dec 2031 | 96% (289 of 302) | Locked |
|---|
| SOBHA Neopolis Phase 3 - W 1, 2, 10 & 11 | about 3 km | 31 Dec 2029 | 90% (335 of 374) | Locked |
|---|
| SOBHA Neopolis Phase 4 - 3, 4, 8 & 9 | about 3 km | 31 Dec 2031 | 85% (319 of 374) | Locked |
|---|
| Projects within 4 km, counted | 45 (45 with an approximate location) | |
|---|---|---|
| Flats in them | 11,952 | |
| Booked | 5,945 of 11,952 (50%) | |
| Unsold | 6,007 | |
| Booked a month, pooled | 183 flats | |
| Months to sell, pooled | 28 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell, BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 5 km, Seetharam Palya | |
| Metro, under construction | about 1 km, Kadubeesanahalli |
| Kempegowda Airport | 47.5 | 29 |
| MG Road (CBD) | 13.5 | 10 |
| Manyata Tech Park | 18.5 | 14 |
| ITPL, Whitefield | 13 | 7.5 |
| Ecospace, Bellandur ORR | 2.5 | 2 |
| Electronic City Ph 1 | 17.5 | 11.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Kadabeesanahalli Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km |