Overview
Jr Elegance
Overview
Jr Elegance
Overview
Jr Elegance
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Records searched to | 15 May 2017 |
|---|
Approvals
| Fire department | Filed with the registration | |
|---|---|---|
| Pollution board (CFE) | Filed with the registration |
| RERA extensions | None on the filing |
|---|
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion |
|---|
Developer
Land · ₹4.50 Cr 24.7%Development · ₹13.72 Cr
Loan & collateral
| Records searched to | 15 May 2017 | Review |
|---|---|---|
| Escrow bank | ORIENTAL BANK OF COMMERCE · HRBR LAYOUT |
Data room
53 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | 1 | Clear |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | 1 | – | Review |
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh PinecourtLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | 382–1,141 sqft carpet (as filed) | Mar 2026 |
| Adarsh PinecourtWithdrawn | Nusrath Unisa | Apartment | – | Nov 2023 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
| Amigo PalacioActive · 40% built | AMIGO SHELTERS PVT LTD | Apartment | 1,044–1,480 sqft carpet (as filed) | Mar 2028 |
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
8 of 185 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Jr Elegance in the interactive atlas
Page 1
Page 1 of 9 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 9 pages, English.
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Matched part of the survey number | 3,590 sq m | |
| The whole survey number on the KGIS map | 37,030 sq m | |
| Land area filed with K-RERA | 3,753 sq m | |
| Village, hobli and taluk on the KGIS map | Horamavu, K R Pura-2 hobli, Bangalore-East taluk |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Whole survey numbers on the KGIS map | 37,030 sq m (the project holds a share) | |
|---|---|---|
| Land area of this registration | 3,753 sq m |
| RERA completion date | 31 Jul 2023 |
|---|
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Map of 1 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Vkk Grand, price locked.
| Legacy Saviero | about 0.5 km | Locked | |
|---|---|---|---|
| Vkk Grand | 1.7 km | Locked | |
| SOBHA Victoria Park Phase 1 | about 3 km | Locked | |
| Nava Skanda Bellavita | about 4 km | Locked | |
| Brr North Excellency Phase I | about 4 km | Locked | |
| Lodha Mirabelle | 4.4 km | Locked | |
| Mirabelle Phase 2 | about 4.5 km | Locked | |
| The Pearl Paradise | 4.7 km | Locked | |
| Assetz Sun & Sanctum - Phase 2 | about 5 km | Locked | |
| Sumadhura Solea | 5.2 km | Locked | |
| Sumadhura Epitome | 5.5 km | Locked | |
| Sattva La Vita | 5.5 km | Locked |
| Jr Elegance This project | This project is the point the others are measured from | 30 Jul 2023 | – | Not verified yet |
|---|---|---|---|---|
| Legacy Saviero | about 0.5 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
| Vkk Grand | 1.7 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
| SOBHA Victoria Park Phase 1 | about 3 km | 31 Dec 2027 | 93% (280 of 300) | Locked |
| Nava Skanda Bellavita | about 4 km | 31 Dec 2029 | 18% (63 of 360) | Locked |
| Brr North Excellency Phase I | about 4 km | 31 Dec 2029 | 33% (34 of 104) | Locked |
| Lodha Mirabelle | 4.4 km | 30 Jun 2028 | 96% (418 of 437) | Locked |
| Rent, 3BHK, 3 km | ₹38,000 /mo · 47 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹28,000 /mo · 150 listings | |
| Rent, 1BHK, 3 km | ₹15,000 /mo · 32 listings | |
| Rent per sq ft, 3 km | ₹25.0 /mo, as listed · 114 listings with a size |
| Projects within 4 km, counted | 26 (18 with an approximate location) | |
|---|---|---|
| Flats in them | 4,613 | |
| Booked | 2,835 of 4,613 (61%) | |
| Unsold | 1,778 | |
| Booked a month, pooled | 79 flats | |
| Months to sell, pooled | 23 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest government-flagged flood location | 1.3 km, Hoysala nagar in Hormavu |
| Nearest storm drain | 220 m to the north-east, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 470 m to the north-west, an unnamed water body |
| Completed, occupancy certificate 10 Mar 2020 |
| Schedule end | 30 Dec 2019 | |
|---|---|---|
| RERA completion date | 31 Jul 2023 | |
| Work began, as filed | 31 Oct 2017 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Toilet tiles | Ceramic tiles (floor) | |
|---|---|---|
| Power backup | Power backup for lifts, common area lighting |
| Estimated cost, at registration | ₹18.22 Cr |
|---|
Sold (37) 54.4%Unsold (31) 45.6%
| Flats sold, at completion | 37 | |
|---|---|---|
| Flats unsold, at completion | 31 | |
| Flats in the phase | 68 |
| Escrow bank | ORIENTAL BANK OF COMMERCE · HRBR LAYOUT |
|---|
| K-RERA registrations under this promoter | 14 | |
|---|---|---|
| Marked completed | 8 | |
| Past promised date, not completed | 5 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Self development | |
| Nearest city water main | 720 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 220 m to the north-east, secondary drain | |
|---|---|---|
| Ground level | 893 m above sea level, plus or minus 4 m | |
| Metro, operational | 3.6 km, Benniganahalli | |
| Metro, under construction | 1.2 km, HRBR Layout |
| Kempegowda Airport | 27.6 | 30 | 19.6 |
| MG Road (CBD) | 11.6 | 14 | 8.6 |
| Manyata Tech Park | 6.5 | 10 | 4.7 |
| ITPL, Whitefield | 14.0 | 17 | 9.6 |
| Ecospace, Bellandur ORR | 16.4 | 26 | 11.6 |
| Electronic City Ph 1 | 28.3 | 35 | 21.1 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 440 m to the north, named Bangalore Water Supply and Sewerage Board on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.4 km to the south-west, named Banaswadi Substation on OpenStreetMap |