Location is very good and I am happy about infra quality of Kns but I heard it has high court stay on the front section of the project …unfortunately one negative point 😌
Overview
Kns Unnati Phase V
Overview
Kns Unnati Phase V
Overview
Kns Unnati Phase V
Overview
Photo: Harshith KTitle & ownership
Approvals
| Building plan (BDA) | Sanctioned 30 May 2025 · No. No. BDA/TPM/PRL-176/2024-25/1150 2025-26 | |
|---|---|---|
| Power NOC | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹11.12 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹8.90 Cr | |
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BDA) | Sanctioned 30 May 2025 | |
| Escrow bank | HDFC · RICHMOND ROAD |
Data room
111 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 5 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 5 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
Location is very good and I am happy about infra quality of Kns but I heard it has high court stay on the front section of the project …unfortunately one negative point 😌
Excellent location, well developed & peaceful layout. as already i have plot in phase 1
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | 1 | – | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Abh SamrddhiLapsed · completion date passed | B V TARAKESHWARI | Plot | ~940–1,200 sqft (estimate: filed carpet plus 25%) | Feb 2026 |
| Aprameya PrasiddhiCompleted (regulator flag) | Aprameya Properties Pvt Ltd | Plot | – | Completed |
| Arohana SerenityCompleted (regulator flag) | Nagaraja B | Plot | ~570–1,790 sqft (estimate: filed carpet plus 25%) | Completed |
| Byraveshwara LayoutLapsed · completion date passed | Channappa and Puttalakshmamma | Plot | ~800–1,500 sqft (estimate: filed carpet plus 25%) | Dec 2024 |
| Cm1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 334 sqft carpet (as filed) | Feb 2025 |
| Dmr LegacyRegistered · no quarterly update yet | Individual promoter (named in the filing) | Plot | ~1,390–1,500 sqft (estimate: filed carpet plus 25%) | Dec 2027 |
| DS Max SamyakActive · 100% built | DS-Max Properties | Apartment | 761–1,078 sqft | Jan 2028 |
| Ds Max SatelliteCompleted · OC 24-04-2020 | DS-MAX PROPERTIES PRIVATE LIMITED | Apartment | – | Completed |
8 of 44 other projects in Kengeri, A to Z. Status is taken from each project's own filing.
All 49 projects in Kengeri → · Kns Propworth LLP's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Kns Unnati Phase V in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| SEIAA | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| Clearances pending | 1, in the latest update | Review |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 11 Jul 2030 |
| Land conversion | 5 of 5 parcels converted | |
|---|---|---|
| Sy 2/2, 3/17 | Converted 4 Dec 2024 · Deputy Comissioner, Bengaluru Urban District. | |
| Sy 2/3, 2/23 | Converted 14 Feb 2025 · Deputy Comissioner, Bengaluru Urban District. | |
| Sy 4/4 | Converted 30 Sep 2024 · Deputy Comissioner, Bengaluru Urban District. | |
| Survey numbers | 2/2 · 2/3 · 2/23 · 3/17 · 4/4 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 2 (2 with an approximate location) | |
|---|---|---|
| Plots in them | 639 | |
| Booked | 463 of 639 (72%) | |
| Unsold | 176 | |
| Booked a month, pooled | 20 plots | |
| Months to sell, pooled | 9 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Industrial (hi-tech), over the filed survey numbers | |
|---|---|---|
| Nearest government-flagged flood location | about 4 km, Sonnenahalli Bridge Upstream Gollarahatti | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
As the promoter reported itPossession date in the agreement
| Internal roads | Not started | |
|---|---|---|
| Completion | 53% |
| Possession, agreement | 31 Mar 2026 | |
|---|---|---|
| RERA completion date | 11 Jul 2030 | |
| Work began, as filed | 7 Jul 2025 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Engineer's certificate, registration | Dated 3 Jul 2025 | |
| Chartered accountant's certificate, registration | Dated 3 Jul 2025 | |
| Chartered accountant, Form 4 | Dated 8 Jul 2026 |
| Cost incurred |
|---|
| ₹6.93 Cr |
| Cost left | ₹4.19 Cr |
|---|
| Plots booked, Form 4 Q2 2026-27 | 51 |
|---|
| Escrow bank | HDFC · RICHMOND ROAD | |
|---|---|---|
| Designated account, collected | ₹2.67 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹2.66 Cr in Q2 2026-27 (100% of that quarter's deposits) | |
| Amount withdrawable, Form 4 | ₹5,89,18,774 | |
| Net amount withdrawable, Form 4 | ₹2,21,28,749 | |
| Escrow account, Q1 2026-27 | Opened at ₹9.1 L, ₹1.29 Cr withdrawn | |
| Escrow account, Q4 2025-26 | ₹1.79 Cr deposited from sales | |
| Escrow account to date, Q1 2026-27 | ₹3.36 Cr deposited from sales, ₹3.35 Cr withdrawn | |
| Sale proceeds realised, Q4 2025-26 | ₹18,21,89,126 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Local authority (Sulikere Grampanchayat) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 5 km, Kengeri | |
| Metro, under construction | about 16.5 km, Tavarekere |
| Kempegowda Airport | 56.5 | 40 |
| MG Road (CBD) | 25.5 | 17 |
| Manyata Tech Park | 34 | 22 |
| ITPL, Whitefield | 42.5 | 31.5 |
| Ecospace, Bellandur ORR | 39.5 | 25.5 |
| Electronic City Ph 1 | 36.5 | 27.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 0.5 km, named STP-3 on OpenStreetMap | |
| Quarry | about 2.5 km to the west | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |