Overview
Kolte-Patil Mirabilis
Overview
Kolte-Patil Mirabilis
Overview
Kolte-Patil Mirabilis
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Records searched to | 14 Jul 2017 |
|---|
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire NOC | GBC(1)151/2011 · building height 38.5 m (TOWER A, TOWER B, TOWER B1, TOWER C, TOWER D, TOWER F), 20.5 m (TOWER E) | Clear |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹230.40 Cr |
|---|
Loan & collateral
| Records searched to | 14 Jul 2017 | Review |
|---|---|---|
| Escrow bank | Axis Bank · M G ROAD BANGALORE |
Data room
49 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | 1 | Clear |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | 1 | – | Review |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh PinecourtLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | 382–1,141 sqft carpet (as filed) | Mar 2026 |
| Adarsh PinecourtWithdrawn | Nusrath Unisa | Apartment | – | Nov 2023 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Kolte-Patil Mirabilis in the interactive atlas
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 28,935 sq m |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 29 Oct 2021 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Map of 1 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Vkk Grand, price locked.
| Legacy Saviero | about 1 km | Locked | |
|---|---|---|---|
| Vkk Grand | 1.5 km | Locked | |
| SOBHA Victoria Park Phase 1 | about 2.5 km | Locked | |
| Nava Skanda Bellavita | about 3.5 km | Locked | |
| Brr North Excellency Phase I | about 4 km | Locked | |
| The Pearl Paradise | 4.3 km | Locked | |
| Lodha Mirabelle | 4.4 km | Locked | |
| Mirabelle Phase 2 | about 4.5 km | Locked | |
| Assetz Sun & Sanctum - Phase 2 | about 4.5 km | Locked | |
| Sumadhura Solea | 5.1 km | Locked | |
| Sattva La Vita | 5.2 km | Locked | |
| Sumadhura Epitome | 5.4 km | Locked |
| Kolte-Patil Mirabilis This project | This project is the point the others are measured from | 29 Oct 2021 | – | Not verified yet |
|---|---|---|---|---|
| Legacy Saviero | about 1 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
| Vkk Grand | 1.5 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
| SOBHA Victoria Park Phase 1 | about 2.5 km | 31 Dec 2027 | 93% (280 of 300) | Locked |
| Nava Skanda Bellavita | about 3.5 km | 31 Dec 2029 | 18% (63 of 360) | Locked |
| Brr North Excellency Phase I | about 4 km | 31 Dec 2029 | 33% (34 of 104) | Locked |
| The Pearl Paradise | 4.3 km | 31 Dec 2026 | 72% (23 of 32) | Locked |
| Rent, 3BHK, 3 km | ₹38,000 /mo · 45 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹27,734 /mo · 134 listings | |
| Rent, 1BHK, 3 km | ₹13,000 /mo · 31 listings | |
| Rent per sq ft, 3 km | ₹25.0 /mo, as listed · 104 listings with a size |
| Projects within 4 km, counted | 29 (18 with an approximate location) | |
|---|---|---|
| Flats in them | 5,212 | |
| Booked | 3,131 of 5,212 (60%) | |
| Unsold | 2,081 | |
| Booked a month, pooled | 90 flats | |
| Months to sell, pooled | 23 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest government-flagged flood location | 1.5 km, Hoysala nagar in Hormavu |
| Nearest storm drain | 50 m to the south-west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 260 m to the north-west, Horamavu |
| Completion |
|---|
| Completed, occupancy certificate filed with K-RERA |
| Schedule end | 30 Apr 2021 | |
|---|---|---|
| RERA completion date | 29 Oct 2021 | |
| Work began, as filed | 9 Aug 2016 |
| Building heights, fire NOC | 38.5 m (TOWER A, TOWER B, TOWER B1, TOWER C, TOWER D, TOWER F), 20.5 m (TOWER E) on the fire NOC |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety | GBC(1)151/2011 · building height 38.5 m (TOWER A, TOWER B, TOWER B1, TOWER C, TOWER D, TOWER F), 20.5 m (TOWER E) | |
|---|---|---|
| Environmental clearance | Filed with the registration |
| Escrow bank | Axis Bank · M G ROAD BANGALORE |
|---|
| K-RERA registrations under this promoter | 5 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 2 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Amigo PalacioActive · 40% built |
| AMIGO SHELTERS PVT LTD |
| Apartment |
| 1,044–1,480 sqft carpet (as filed) |
| Mar 2028 |
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
8 of 185 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Local authority | |
| Nearest city water main | 820 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 50 m to the south-west, tertiary drain | |
|---|---|---|
| Ground level | 890 m above sea level, plus or minus 4 m | |
| Metro, operational | 3.9 km, K.R. Puram | |
| Metro, under construction | 1.6 km, HRBR Layout |
| Kempegowda Airport | 27.5 | 29 | 19.2 |
| MG Road (CBD) | 12.1 | 15 | 9.0 |
| Manyata Tech Park | 7.2 | 11 | 4.7 |
| ITPL, Whitefield | 13.6 | 17 | 9.6 |
| Ecospace, Bellandur ORR | 16.9 | 27 | 12.0 |
| Electronic City Ph 1 | 28.8 | 36 | 21.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 220 m to the west, named Bangalore Water Supply and Sewerage Board on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.8 km to the south-west, named Banaswadi Substation on OpenStreetMap |