Groundwater, taluk average19.3 m below groundDevanahalli taluk, July 2023
Water supply, as filedBorewellDeclared by the promoter
Metro, operationalabout 21.5 kmDasarahalli
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion83%As of Q2 2026-27, promoter's return
Possession, agreement6 Dec 2027Agreement for sale, p. 12
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Sold40 bookedAs of Q2 2026-27
Funding
Estimated cost
Land · ₹19.00 Cr
Loan & collateral
Can it be financed?
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Building plan (BIAPPA)
Sanctioned 4 Oct 2024
Escrow bank
INDUSIND BANK · ITPB Branch
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
147 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Contract & costs, Title & ownership, Disputes & cases and DocumentsUnlock
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Konig North County in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Encumbrance certificate, Form 15
Survey sketch
Survey sketch filed with K-RERA
Sketch, sanction and mutation vs KGIS map
₹ ••,•••
•• %
•• ••• ••••
•••••
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
Not verified yet
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Filed with the registration
SEIAA
Filed with the registration
AAI
Filed with the registration
KSPCB
Filed with the registration
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
31 Dec 2027
Registration certificates
PRM/KA/RERA/1250/303/PR/071124/007207
Land use
Conversion order
Land conversion
Converted 3 Jun 2024 · DC
Survey numbers
127 · 128
Not verified yet: Validity.
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Payments
Payment plan
•• %
•• %
•• %
•• %
•• %
Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Not verified yet: Recent price, plot area; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, plot area; Form 4 certified totals; Agreements in the Form 4 sold list; Plot area vs rest, by type; Unit mix filed; Unit types; K-RERA inventory; Transactions in this project; North Bengaluru, past year; Bengaluru, past year; North Bengaluru since 2022; This project vs North Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Plot price, plotted layouts within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400 and 220 kV
Its corridor, to scale
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Not verified yet: Structure, Structural safety certificate, Club house, Schedule end, What the promoter specified · not an inspection, Specification sheet · brands "or equivalent", Design consultants (Form 6), Fire safety, Environmental clearance.
50.7%
Development · ₹18.51 Cr 49.3%
Form 4
Estimated cost, at registration
₹37.51 Cr
Estimated cost, architect's and engineer's certificates
₹47.30 Cr (91.1% of the Form 4 Q2 2026-27 estimate)
Sales
K-RERA inventory
Plots booked, Form 4 Q2 2026-27
40
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
INDUSIND BANK · ITPB Branch
Designated account, collected
₹3.95 Cr in Q2 2026-27
Designated account, withdrawn
₹5.53 Cr in Q2 2026-27
Track record
DOSL builder track
K-RERA registrations under this promoter
5
Marked completed
1
Past promised date, not completed
0
Not verified yet: Receivable, sold plots; Cost left; Sold in the latest quarter; Cost left vs buyer dues; Collected from buyers; Land cost revision; Sold vs unsold; Sold per quarter; Unregistered agreements, over 10% paid; Average schedule slip.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Devanahalli taluk average, July 2023: 19.3 m below ground
What it means
10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class
Through the year
January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several)
Water supply, as filed
Borewell
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot