Title & ownership
Approvals
| Building plan (BMRDA) | Sanctioned 25 Nov 2021 · No. 33/31/2021-22 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Transfer fee | ₹100 per sq ft | |
|---|---|---|
| Defect liability | 5 years |
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Flats · avg 190 m² 100%
Location & risks
Construction & progress
Developer
Land · ₹1.30 Cr 5%Development · ₹25.00 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BMRDA) | Sanctioned 25 Nov 2021 | |
| Escrow bank | AU Small Finance Bank · RESIDENCY ROAD |
Data room
130 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Aarna RajpathLapsed · completion date passed | AARNA PROJECTS | Mixed development | – | Apr 2025 |
| Adithi EmeraldCompleted · OC 09-12-2021 | M/s ADITHI PROJECTS | Apartment | – | Completed |
| Adithya LujosoCompleted · OC 18-05-2021 | Adithya Constructions | Apartment | 825 sqft carpet (as filed) | Completed |
| Aikya OrchidCompleted · OC 06-05-2024 | AIKYA PROMOTERS AND CONSTRUCTIONS | Apartment | 840–1,049 sqft carpet (as filed) | Completed |
| Bhuvana Boulevard Phase 1Active · 12% built | VSPR DEVELOPERS | Rowhouse | 2,056 sqft carpet (as filed) | Dec 2030 |
| Bhuvana Boulevard Phase 2Active · 10% built | VSPR DEVELOPERS | Rowhouse | 2,056 sqft carpet (as filed) | Dec 2030 |
| Bm PristineLapsed · completion date passed | B M DEVELOPERS | Apartment | – | Jul 2016 |
| Camellia VitalActive · 28% built | Camellia Infrastructures | Apartment | 962 sqft carpet (as filed) | Mar 2028 |
8 of 51 other projects in Varthur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Lake Waters in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Mar 2025 |
| Land conversion | Converted 15 Oct 2020 · Deputy Commisioner,Bangalore rural district | |
|---|---|---|
| Survey numbers | 15/3A2 · 15/9 · 17 · 18/2 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Flats | 32 | 2,047 |
| Jeevan's Allure | about 2.5 km | Locked | |
|---|---|---|---|
| Leafy Delight | about 3 km | Locked | |
| Inspira Infinity | about 3.5 km | Locked | |
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | about 4 km | Locked | |
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | about 4 km | Locked | |
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | about 4 km | Locked | |
| Poetry Of Earth | about 4 km | Locked | |
| Coevolve Florenza | about 4.5 km | Locked | |
| Assetz 66 & Shibui | about 5 km | Locked | |
| Reflections 66 | about 5 km | Locked | |
| Leafy Avenue | about 5 km | Locked | |
| Sowparnika Ashiyana Phase II | about 5.5 km | Locked |
| Lake Waters This project | This project is the point the others are measured from | 31 Mar 2025 | – | Not verified yet |
|---|---|---|---|---|
| Jeevan's Allure | about 2.5 km | 31 Jul 2027 | 32% (49 of 152) | Locked |
| Leafy Delight | about 3 km | 31 Mar 2028 | 24% (16 of 67) | Locked |
| Inspira Infinity | about 3.5 km | 31 Jan 2029 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | 60% Residential (main), 23% Transport & communication, 16% Agriculture, over the filed survey numbers | Review |
|---|---|---|
| Nearest government-flagged flood location | about 3.5 km, Varthur police station |
| Nearest storm drain | about 1.5 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
| Amenities declared | Electricity · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.00 (32 covered spaces for 32 units) | |
| Power backup | Declared by the promoter |
Builder's schedule runs about 3 months past the promised possession date.
| Possession, agreement | 31 Dec 2024 | |
|---|---|---|
| Schedule end | 28 Mar 2025 | |
| RERA completion date | 31 Mar 2025 | Red flag |
| Work began, as filed | 3 Jan 2022 |
| Building heights, fire NOC | 10.35 m filed, 2 towers |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 10 sq m |
|---|
| Architect's certificate, registration | Dated 22 Feb 2022 · site inspected 15 Feb 2022 | |
|---|---|---|
| Engineer's certificate, registration | Dated 22 Feb 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹26.31 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹25.00 Cr |
| Escrow bank | AU Small Finance Bank · RESIDENCY ROAD |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 95% (100 of 105) |
| Locked |
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | about 4 km | 31 Mar 2028 | 100% (210 of 210) | Locked |
|---|
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | about 4 km | 30 Apr 2026 | 100% (197 of 197) | Locked |
|---|
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | about 4 km | 30 Sep 2027 | 100% (192 of 192) | Locked |
|---|
| Projects within 4 km, counted | 29 (29 with an approximate location) | |
|---|---|---|
| Flats in them | 5,957 | |
| Booked | 3,129 of 5,957 (53%) | |
| Unsold | 2,828 | |
| Booked a month, pooled | 106 flats | |
| Months to sell, pooled | 21 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 62 m
Taluk average; not a reading at the site.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell, Local authority (Muthsandra Gram Panchyat) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1.5 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Metro, operational | about 6 km, Channasandra | |
| Metro, under construction | about 9 km, Marathahalli |
| Kempegowda Airport | 43.5 | 30 |
| MG Road (CBD) | 23.5 | 20 |
| Manyata Tech Park | 27.5 | 21 |
| ITPL, Whitefield | 10 | 7 |
| Ecospace, Bellandur ORR | 16 | 11 |
| Electronic City Ph 1 | 26.5 | 16 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km |