The project is just off STRR with excellent future growth prospects. All the best developers are around this belt .
Overview
Legacy Mihira
Overview
Legacy Mihira
Overview
Legacy Mihira
Overview
Photo: Legacy MihiraTitle & ownership
Approvals
| Building plan (Satellite Town Ring Road Planning Authority) | Sanctioned 29 Apr 2025 · No. STRRPA/TP/LAO/40/2023-24/25-26 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| SEIAA |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Ekta Elements | about 9.5 km | Locked |
|---|
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 29 Apr 2025 | |
| Escrow bank | KOTAK MAHINDRA BANK · M.G.ROAD |
Data room
163 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
The project is just off STRR with excellent future growth prospects. All the best developers are around this belt .
Thoughtfully planned project in a fast-developing corridor.
Our family recently visited the project and liked the overall layout. Planning looks well thought out. Amenities seem nicely designed and useful. Feels like a good option for future investment.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | 1 | – | Review |
| Loan & collateral | – | – | – | – |
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| AamayaActive · 7% built | SRK INFRA PROJECTS PRIVATE LIMITED | Plot | ~7,780–16,060 sqft (estimate: filed carpet plus 25%) | Jan 2029 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Abhi HomesExtended to 30-12-2026 | ABHI DEVELOPERS | Apartment | – | Dec 2026 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Adarsh Savana Phase 2Registered · no quarterly update yet | ALEKHYA PROPERTY DEVELOPMENTS PVT LTD. | Plot | ~1,200–3,190 sqft (estimate: filed carpet plus 25%) | Jun 2029 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
8 of 293 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
All 308 projects in Devanahalli → · Legacy Global Projects's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Legacy Mihira in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2030 |
| Land conversion | Converted 10 Jul 1998 · DC Office, Doddaballapur | |
|---|---|---|
| Survey numbers | 254 · 255 · 258 · 260 · 256(P) · 261(P) · 262(P) · 263 · 264 · 265 · 266(P) |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Earth Aroma Phase-2 | about 9.5 km | Locked |
|---|
| Fortius Good Earth | about 10 km | Locked |
|---|
| Earth Aroma | about 10 km | Locked |
|---|
| Vaishnavi At-One Life IV | about 11 km | Locked |
|---|
| Legacy Mihira This project | This project is the point the others are measured from | 31 Dec 2030 | – | Not verified yet |
|---|---|---|---|---|
| Ekta Elements | about 9.5 km | 31 Dec 2027 | – | Locked |
| Earth Aroma Phase-2 | about 9.5 km | 31 Dec 2025 | – | Locked |
| Fortius Good Earth | about 10 km | 31 Dec 2027 | – | Locked |
| Earth Aroma | about 10 km | 31 Dec 2024 | – | Locked |
| Vaishnavi At-One Life IV | about 11 km | 18 Dec 2027 | – | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 20.5 km, Kondappa layout | |
|---|---|---|
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
As the promoter reported it
| Internal roads | 20% | |
|---|---|---|
| Completion | 25% |
| RERA completion date | 31 Dec 2030 | |
|---|---|---|
| Work began, as filed | 1 Jul 2025 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural engineer, quarterly | Form 6 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Chartered accountant's certificate, registration | Dated 10 Jun 2025 |
| Estimated cost, at registration | ₹39.55 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹30.90 Cr | |
| Cost left | ₹28.97 Cr |
| Escrow bank | KOTAK MAHINDRA BANK · M.G.ROAD | |
|---|---|---|
| Designated account, collected | ₹6.38 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 (0% of that quarter's deposits) | |
| Withdrawn from the escrow account to date | ₹0 |
| K-RERA registrations under this promoter | 11 | |
|---|---|---|
| Marked completed | 1 | |
| Past promised date, not completed | 7 | Review |
| Other phases under this promoter name | 10 | |
| With a filed extension or completion | 6 (1 completed, 5 extended) | |
| Average schedule slip | 40 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class | |
| Through the year | January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several) | |
| Water supply, as filed | Local authority (Bidaluru Grama Panchayath) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 30.5 km, K.R. Puram | |
| Metro, under construction | about 9 km, Airport City |
| Kempegowda Airport | 17.5 | 9.5 |
| MG Road (CBD) | 43 | 34.5 |
| Manyata Tech Park | 38 | 26.5 |
| ITPL, Whitefield | 49 | 33 |
| Ecospace, Bellandur ORR | 59.5 | 39 |
| Electronic City Ph 1 | 62.5 | 48.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 1.5 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |