Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Adarsh Palm RetreatLapsed · completion date passed | Adarsh Developers | Apartment | 975–5,250 sqft | – |
| Adarsh Palm Retreat Mayberry-Phase 1Lapsed · completion date passed | Akarsh Residence Pvt Ltd | Apartment | 1,757–2,706 sqft carpet (as filed) | Mar 2026 |
| Adarsh RosewoodActive · 15% built | Adarsh Developers | Apartment | 1,335–1,900 sqft | Dec 2027 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Aishwarya SiliconLapsed · completion date passed | M/s.AISHWARYA BUILDCON DEVELOPERS | Apartment | 1,084 sqft carpet (as filed) | Apr 2022 |
| August GrandCompleted (regulator flag) | August Ventures Private Limited | Apartment | 1,944 sqft carpet (as filed) | Completed |
| Balaji MonarchCompleted · OC 04-12-2020 | SRI BALAJI BUILDERS | Apartment | 835 sqft carpet (as filed) | Completed |
| Bilva ElinaLapsed · completion date passed | Jagadish v | Apartment | – | Jul 2019 |
| Carbon Corner StoneCompleted (regulator flag) | CARBON DEVELOPERS Pvt Ltd | Apartment | – | Completed |
8 of 44 other projects in Bellandur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Mantri Espana in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Map of 4 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Adarsh Rosewood, price locked; Adarsh Parkland, price locked; SOBHA Neopolis, price locked; Satori Residence By Genurise, price locked.
| Mantri Espana This project | This project is the point the others are measured from | – | – | Not verified yet |
|---|---|---|---|---|
| Adarsh Rosewood | 2.4 km | 31 Dec 2027 | 20% (24 of 122) | Locked |
| Adarsh Parkland | 2.4 km | – | – | Locked |
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 3.5 km | 31 Dec 2030 | 98% (220 of 225) | Locked |
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 3.5 km | 31 Dec 2031 | 96% (289 of 302) | Locked |
| SOBHA Neopolis Phase 3 - W 1, 2, 10 & 11 | about 3.5 km | 31 Dec 2029 | 90% (335 of 374) | Locked |
| SOBHA Neopolis Phase 4 - 3, 4, 8 & 9 | about 3.5 km | 31 Dec 2031 | 85% (319 of 374) | Locked |
| Rent, 4BHK, 3 km | ₹80,000 /mo · 17 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹70,450 /mo · 254 listings | |
| Rent, 2BHK, 3 km | ₹42,000 /mo · 281 listings | |
| Rent, 1BHK, 3 km | ₹18,000 /mo · 133 listings | |
| Rent per sq ft, 3 km | ₹39.7 /mo, as listed · 284 listings with a size |
| Projects within 4 km, counted | 44 (18 with an approximate location) | |
|---|---|---|
| Flats in them | 11,116 | |
| Booked | 5,263 of 11,116 (47%) | |
| Unsold | 5,853 | |
| Booked a month, pooled | 197 flats | |
| Months to sell, pooled | 28 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | 92% Industrial (hi-tech), 8% Valley / drain buffer | Review |
|---|---|---|
| Nearest government-flagged flood location | 1.1 km, Bellandur |
| Nearest storm drain | 90 m to the south, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 330 m to the south-west, an unnamed water body |
| K-RERA registrations under this promoter | 11 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 11 | Review |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Nearest city water main | 510 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 90 m to the south, tertiary drain | |
|---|---|---|
| Ground level | 876 m above sea level, plus or minus 4 m | |
| Metro, operational | 5.8 km, Seetharam Palya | |
| Metro, under construction | 520 m, Kadubeesanahalli |
| Kempegowda Airport | 48.8 | 49 | 29.4 |
| MG Road (CBD) | 15.4 | 22 | 10.0 |
| Manyata Tech Park | 19.8 | 27 | 14.1 |
| ITPL, Whitefield | 14.2 | 18 | 8.1 |
| Ecospace, Bellandur ORR | 2.1 | 6 | 1.1 |
| Electronic City Ph 1 | 16.4 | 22 | 10.7 |
| Landfill or waste transfer station | 2.9 km to the north-west | |
|---|---|---|
| Sewage treatment plant | 1.4 km to the north-west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 590 m to the west |