Good apartment silent area, safety very very good,
Overview
Mashri Prajavani
Overview
Mashri Prajavani
Overview
Mashri Prajavani
Overview
Photo: Khilan VadhadiyaTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of 2 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 2 pages, English.
Approvals
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Mar 2022 |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹3.42 Cr 57.9%Development · ₹2.49 Cr 42.1%
Loan & collateral
| Escrow bank | HDFC · Banaswadi |
|---|
Data room
40 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Good apartment silent area, safety very very good,
very nice location, silent area... good to live peace ful... this location
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Avyak FortuneCompleted (regulator flag) | AVYAK BUILDERS | Apartment | 803 sqft carpet (as filed) | Completed |
| Kr Grand View HeightsCompleted · OC 02-03-2022 | K R Constructions | Mixed development | – | Completed |
| La VidaLapsed · completion date passed | UNISHIRE BUILDERS PRIVATE LIMITED | Apartment | – | Apr 2022 |
| Legacy SavieroExtended to 30-06-2027 | Chitrakut Estates Private Limited | Apartment | 994–1,256 sqft carpet (as filed) | Jun 2027 |
| Mathrusri’s Sai Sanvi GrandeurLapsed · completion date passed | SAI DEVELOPERS | Apartment | – | Sep 2022 |
| Nava Subha SamruddhiCompleted · OC 29-08-2023 | M/S NAVA JYOTHI SHELTERS PRIVATE LIMITED | Apartment | – | Completed |
| Nava Vaibhava ‘b’ And ‘c’ BlockCompleted · OC 10-12-2021 | NAVAJYOTHI CONSTRUCTIONS | Apartment | 844–1,072 sqft carpet (as filed) | Completed |
| Nava Vaibhava A BlockCompleted · OC 26-11-2020 | M/S NAVAJYOTHI CONSTRUCTIONS REPRESENTED BY K MURALI BABU | Apartment | – | Completed |
8 of 17 other projects in Central Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Mashri Prajavani in the interactive atlas
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Land area of this registration | 964 sq m | |
|---|---|---|
| Title deed | Executed 15 Mar 2017 · Sy 2/2, Chelakere village · 14156 sq. ft.; Sy 2/3, Chelakere village |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Vkk Grand | about 2 km | Locked |
|---|
| Legacy Saviero | about 2.5 km | Locked |
|---|
| Lodha Mirabelle | about 3 km | Locked |
|---|
| Mirabelle Phase 2 | about 3 km | Locked |
|---|
| Brr North Excellency Phase I | about 3.5 km | Locked |
|---|
| SOBHA Victoria Park Phase 1 | about 3.5 km | Locked |
|---|
| Sumadhura Solea | about 4 km | Locked |
|---|
| Magnolia Delight | about 4.5 km | Locked |
|---|
| Nava Skanda Bellavita | about 4.5 km | Locked |
|---|
| Sumadhura Epitome | about 4.5 km | Locked |
|---|
| The Pearl Paradise | about 5 km | Locked |
|---|
| Sattva La Vita | about 5.5 km | Locked |
|---|
| Mashri Prajavani This project | This project is the point the others are measured from | 30 Mar 2022 | – | Not verified yet |
|---|---|---|---|---|
| Vkk Grand | about 2 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
| Legacy Saviero | about 2.5 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
| Lodha Mirabelle | about 3 km | 30 Jun 2028 | 96% (418 of 437) | Locked |
| Mirabelle Phase 2 | about 3 km | 31 May 2030 | 61% (173 of 284) | Locked |
| Brr North Excellency Phase I | about 3.5 km | 31 Dec 2029 | 33% (34 of 104) | Locked |
| SOBHA Victoria Park Phase 1 | about 3.5 km | 31 Dec 2027 | 93% (280 of 300) | Locked |
| Projects within 4 km, counted | 27 (27 with an approximate location) | |
|---|---|---|
| Flats in them | 3,532 | |
| Booked | 2,007 of 3,532 (57%) | |
| Unsold | 1,525 | |
| Booked a month, pooled | 18 flats | |
| Months to sell, pooled | 84 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1 km, HBR Layout |
|---|
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Self development |
| Schedule end | 31 Dec 2020 | |
|---|---|---|
| RERA completion date | 30 Mar 2022 | Red flag |
| Work began, as filed | 1 Jan 2019 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Estimated cost, at registration | ₹5.92 Cr |
|---|
| Escrow bank | HDFC · Banaswadi |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, secondary drain | |
|---|---|---|
| Metro, operational | about 4.5 km, Baiyappanahalli | |
| Metro, under construction | about 0.5 km, Kalyan Nagar |
| Kempegowda Airport | 26.5 | 20 |
| MG Road (CBD) | 9.5 | 7.5 |
| Manyata Tech Park | 3.5 | 3 |
| ITPL, Whitefield | 14.5 | 11.5 |
| Ecospace, Bellandur ORR | 19.5 | 12 |
| Electronic City Ph 1 | 27.5 | 21.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Banaswadi Substation on OpenStreetMap |