Out of 200 there are very limited people who don't support and always wanna downgrade the apartment and the association works. Those who see the review, please talk to couple of people in NV and get to know the reality. I have been in the…
NNaveen N9 Feb 2025★★★★★
Update 5: 1-Jan-2025 Everything is sorted out in the society as we are entering the 4th year of our residence here. It feels peaceful both inside our flat as well as in the basement. Lots of positive vibes and feel good emotions inside.…
Ssumant karmakar2 Jan 2024★★★★★
Yes I have given 5 stars to this place because I live here #biased But anyone in their sane minds should not even think to live here. People are made to stop doing anything and everything after a certain time on the clock. Before buying or…
No survey sketch is listed on this phase's K-RERA filing
Land record
Survey plots · KGIS cadastral
Approvals
Is it approved for its use?
Clear1 clear
RERA extensionsNone on the filingFiling read 20 Oct 2026
Permits
Approval letters
Power NOC
Filed with the registration
Fire department
Filed with the registration
Environmental clearance
SEIAA 124 CON 2020 · issued 4 Sep 2020
✓Clear
AAI
Filed with the registration
Pollution board (CFE)
Disputes & cases
Are there court cases or buyer complaints on this project?
Clear1 clear
Builder: M/S NAVAJYOTHI CONSTRUCTIONS REPRESENTED BY K MURALI BABU
Court cases on the project's land
0 cases
Filed on
Case no.
Filed at
Location
Filed by
Against
What it's about
Status
Search pending.
Court cases against the builder and landowners
0 cases
Filed on
Case no.
Filed at
Location
Filed by
Against
What it's about
Status
None found.
Buyer complaints filed with K-RERA on this project
0 cases
Filed on
Case no.
Filed at
Location
Filed by
What it's about
Status
None found.
Buyer complaints on other projects by this builder
0 cases
Filed on
Case no.
Filed at
Location
Filed by
What it's about
Status
None found.
✓Confirmed: the record names this project, its land or its promoter company?Likely: matched by the builder's nameHigh: a court stay or a pending case on the filed landMedium: open, or the record does not sayLow: decided or closed
Contract & costs
What does a buyer commit to?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Forfeiture, agreement25% of the sale considerationAgreement for sale, p. 6
Cancellation
Forfeiture
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Floor plans, brochure
No floor plans on file
Unsold stock
K-RERA inventory
Completed: no quarterly return is on this phase's K-RERA filing
The area
Comparable projects
Nearest 12 with filed prices
Location & risks
What is the location like?
Groundwater, taluk average27.3 m below groundBengaluru East taluk, July 2023
Water supply, as filedLocal authorityDeclared by the promoter
The site
Flooding
Site vs nearest drain
Construction & progress
How is it being built, and when will it be ready?
CompletionCompletedOccupancy certificate, 26 Nov 2020
Possession, agreementApr 2021Agreement for sale, p. 6
StructureRCC framed structureAs specified
Progress
Completion, architect
Completed: no quarterly return is on this phase's K-RERA filing
Work left
By component
Completed: no quarterly return is on this phase's K-RERA filing
Developer
Can the developer deliver?
Sold46 / 46At the completion filing, 19 Mar 2024
Sold in the latest quarterNo return filed
Funding
Estimated cost
Land · ₹13.00 Cr 39.4%Development · ₹20.00 Cr
Loan & collateral
Can it be financed?
Conditions
Collateral checks
Escrow bank
Axis Bank · KASTURI NAGAR
Stage
Certified progress
Completed: no quarterly return is on this phase's K-RERA filing
Not verified yet: Value; Max loan; Borrower margin; Developer's project loan; Example unit; Calculation; Records searched to; Building plan; Unregistered agreements, over 10% paid; Sale deed in favour of.
Data room
Documents filed for this project
Documents filed71On K-RERA
Available71100% of filed
K-RERA only0
Approvals with a validity dateNone read
Approvals & NOCs
What we read
Environmental clearanceIssued 4 Sep 2020Filed as SEIAA, p. 1
1 pageAvailable
Available
Available
Available
Available
Available
8 pagesAvailable
2 factsAvailable
Available
Available
1 pageAvailable
Available
Available
Available
Available
3 pagesAvailable
8 pagesAvailable
13 pagesAvailable
Source: K-RERA project page and the documents filed there, as read by us. 8 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
Map centred on the village the filing names, approximate: village level. The filing names only the village. The marker is its centre and the ring is 5 km; it does not mark the site.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Nava Vaibhava A Block is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding village.
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
Not verified yet: Title opinion; Records searched to; Charges on the land; Landowner share of sales; How the land reached this project; Title report; Charges; Schedule in the EC vs KGIS neighbours; Sketch, sanction and mutation vs KGIS map; Area on the KGIS map; The RTC of each filed survey; Share of sales revenue; Joint development agreement.
Filed with the registration
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
30 Sep 2023
Registration certificates
PRM/KA/RERA/1251/446/PR/190625/002623
Not verified yet: Building plan, Land conversion, Validity, Conversion order.
Agreement and allotment letter
Forfeiture, agreement
25% of the sale consideration
Not verified yet: Forfeiture, allotment letter; Transfer fee; Maintenance included; Payment plan; Agreement for sale.
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Unit mix filed; Unit types; Transactions in this project; Central Bengaluru, past year; Bengaluru, past year; Central Bengaluru since 2022; This project vs Central Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields; Months to sell unsold stock; K-RERA inventory.
Nearest storm drain
about 0.5 km from the locality centre, secondary drain
Nearest lake, tank or pond
about 0.5 km from the locality centre, Horamavu
Around it
Water
Groundwater, Bengaluru East taluk average
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
Water at a glance
Groundwater
Bengaluru East taluk average, July 2023: 27.3 m below ground
What it means
20-40 m below ground, a class in CGWB's depth-to-water-level classes
Through the year
Not found
Water supply, as filed
Local authority
Distances
Approximate: village level
Nuisances
Distance from the site
Locality only filed: no distance from the site to show
DOSL nuisance layer
Landfill or waste transfer station
None within 3 km of the locality centre
Sewage treatment plant
about 1 km from the locality centre, named Bangalore Water Supply and Sewerage Board on OpenStreetMap
Quarry
None within 3 km of the locality centre
Crematorium
None within 3 km of the locality centre
Prison
None within 3 km of the locality centre
Electrical substation
about 1.5 km from the locality centre, named Banaswadi Substation on OpenStreetMap
Not verified yet: Metro, operational; Power lines, flood-prone areas, drains; Planning and hazards; Drains and lakes; Specification and Form 5; Nearest city water main; Ground level; Metro, under construction; Road distance from the site; Six city anchors · OSRM, no traffic.
Quarterly return
Completion
Completed, occupancy certificate 26 Nov 2020
Dates
Dates
Filed dates
Possession, agreement
Apr 2021
Schedule end
20 Oct 2020
RERA completion date
30 Sep 2023
Completion date, agreement
Apr 2021
Grace period for possession
3 months
Work began, as filed
8 Mar 2019
Specified structure
What the promoter specified · not an inspection
Structure
RCC framed structure
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Not verified yet: Structural safety certificate; Main structure; Electrical and plumbing finishing; Internal roads; Club house; Completion, accountant; Foundation; Wall material; Wall thickness; Concrete / steel grade; Building heights, fire NOC; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Power backup; Sewage plant; Structural engineer, quarterly; Design consultants (Form 6); Fire safety.
60.6%
Form 4
Estimated cost, at registration
₹33.00 Cr
Sales
Sold vs unsold, at completion
Sold (46) 100%
Sold per quarter
Completed: no quarterly return is on this phase's K-RERA filing
K-RERA inventory
Flats sold, at completion
46
Flats unsold, at completion
0
Flats in the phase
46
Compliance
Escrow
Completed: no quarterly return is on this phase's K-RERA filing
Escrow and filings
Escrow bank
Axis Bank · KASTURI NAGAR
Not verified yet: Receivable, sold flats; Cost left; Cost left vs buyer dues; Cost incurred; Collected from buyers; Land cost revision; Designated account, collected; Designated account, withdrawn; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Basemap: Esri, OpenStreetMap contributors
Map centred on the village the filing names, approximate: village level. The filing names only the village. The marker is its centre and the ring is 5 km; it does not mark the site.