Do whatever you want but don't keep the loud speaker in full volume which is very disturbing, sometimes irritating the all the surrounding areas.
Overview
Meda Eternity
Overview
Meda Eternity
Overview
Meda Eternity
Overview
Photo: Dheeraj MishraTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of 3 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 3 pages, English.
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹2.00 Cr 13.3%Development · ₹13.00 Cr 86.7%
Loan & collateral
| Escrow bank | HDFC · Agara Junction Branch |
|---|
Data room
56 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
Do whatever you want but don't keep the loud speaker in full volume which is very disturbing, sometimes irritating the all the surrounding areas.
It was so nice and beautiful wonderful apartment I loved it thankyou!
Meda Eternity is a residential apartment with aesthetic design. I would give full credit to the engineer/architect. The corridor and staircase are wide and beautiful. The flats also feel spacious. The lawn is passable but that doesn't…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 2 | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| 10x ELapsed · completion date passed | MAZ RD Builders and Developers Private Limited | Apartment | 478 sqft carpet (as filed) | Dec 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
| Adarsh ParadiseActive · 93% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
8 of 328 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Meda Eternity in the interactive atlas
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Matched part of the survey number | 5,220 sq m | |
| The whole survey number on the KGIS map | 18,413 sq m | |
| Land area filed with K-RERA | 4,755 sq m | |
| Village, hobli and taluk on the KGIS map | Kitthaganur, Bidarahalli-2 hobli, Bangalore-East taluk |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Whole survey numbers on the KGIS map | 18,413 sq m (the project holds a share) | |
|---|---|---|
| Land area of this registration | 4,755 sq m | |
| Title deed | Sy 98/4, Kittiganur village, Bidarahalli hobli |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 1 Mar 2019 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Assetz Sun & Sanctum - Phase 2 | about 1.5 km | Locked | |
|---|---|---|---|
| 2g Tula | 4.2 km | Locked | |
| Assetz Bloom & Dell - Phase 2 | 4.3 km | Locked | |
| Garuda Grand | 4.4 km | Locked | |
| Sattva Songbird | 4.8 km | Locked | |
| Chaithanya Sankhya | about 5 km | Locked | |
| Godrej Splendour Phase II | about 5 km | Locked | |
| Legacy Saviero | about 5 km | Locked | |
| Godrej Woodscapes | about 5 km | Locked | |
| Godrej Splendour | 5.3 km | Locked | |
| SOBHA Victoria Park Phase 1 | about 5.5 km | Locked | |
| Vkk Grand | 5.7 km | Locked |
| Meda Eternity This project | This project is the point the others are measured from | 1 Mar 2019 | – | Not verified yet |
|---|---|---|---|---|
| Assetz Sun & Sanctum - Phase 2 | about 1.5 km | 31 Jul 2026 | 100% (70 of 70) | Locked |
| 2g Tula | 4.2 km | 27 Dec 2027 | 68% (173 of 256) | Locked |
| Assetz Bloom & Dell - Phase 2 | 4.3 km | 31 Oct 2027 | 100% (238 of 238) | Locked |
| Garuda Grand | 4.4 km | 31 Mar 2028 | 41% (56 of 136) | Locked |
| Sattva Songbird | 4.8 km | 6 May 2029 | 51% (704 of 1,379) | Locked |
| Chaithanya Sankhya | about 5 km | 30 Nov 2028 | 66% (29 of 44) | Locked |
| Rent, 3BHK, 3 km | ₹48,540 /mo · 19 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹20,750 /mo · 42 listings | |
| Rent, 1BHK, 3 km | ₹10,750 /mo · 15 listings | |
| Rent per sq ft, 3 km | ₹22.2 /mo, as listed · 50 listings with a size |
| Projects within 4 km, counted | 32 (21 with an approximate location) | |
|---|---|---|
| Flats in them | 7,594 | |
| Booked | 4,230 of 7,594 (56%) | |
| Unsold | 3,364 | |
| Booked a month, pooled | 100 flats | |
| Months to sell, pooled | 25 months |
Map of the ground within about 1.2 km of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 220 kV, 100 m from the filed location | Clear |
| Nearest government-flagged flood location | 2.0 km, TRIVENI NAGAR NEAR KR PURAM |
| Nearest storm drain | 1.0 km to the north-east, BD422, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 210 m to the south-east, Gunjur Hosekere |
| Completion | Completed, occupancy certificate filed with K-RERA |
|---|
| Schedule end | 31 Mar 2019 | |
|---|---|---|
| RERA completion date | 1 Mar 2019 | |
| Work began, as filed | 1 Oct 2016 |
| Structure | RCC framed structure |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Flooring | Vitrified tiles |
|---|
| Fire safety | None filed | |
|---|---|---|
| Environmental clearance | None filed |
| Estimated cost, at registration | ₹15.00 Cr |
|---|
| Escrow bank | HDFC · Agara Junction Branch |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 1.2 km of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Self development | |
| Nearest city water main | 1.8 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 1.0 km to the north-east, BD422, secondary drain | |
|---|---|---|
| Ground level | 880 m above sea level, plus or minus 4 m | |
| Metro, operational | 4.6 km, Mahadevapura | |
| Metro, under construction | 5.1 km, KR Puram |
| Kempegowda Airport | 27.5 | 31 | 18.1 |
| MG Road (CBD) | 18.1 | 19 | 13.3 |
| Manyata Tech Park | 12.0 | 16 | 9.4 |
| ITPL, Whitefield | 10.7 | 13 | 6.5 |
| Ecospace, Bellandur ORR | 17.0 | 25 | 12.6 |
| Electronic City Ph 1 | 33.0 | 37 | 22.1 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.1 km to the south-east, named Yelemallappa Chetti 15MLD Sewage Treatment Planet on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |