Overview
Nava Utsava
Overview
Nava Utsava
Overview
Nava Utsava
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | 1 | Clear |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 1 | |
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh PinecourtLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | 382–1,141 sqft carpet (as filed) | Mar 2026 |
| Adarsh PinecourtWithdrawn | Nusrath Unisa | Apartment | – | Nov 2023 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate.
Approvals
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2019 |
Disputes & cases
Builder: M/s.Navajyothi Developers
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Search pending. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion | Completed, occupancy certificate filed with K-RERA |
|---|
Developer
| Estimated cost, at registration | ₹3.00 Cr |
|---|
Loan & collateral
| Escrow bank | Axis Bank · TC Palya |
|---|
Data room
Source: K-RERA project page and the documents filed there, as read by us. 2 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Review |
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Amigo PalacioActive · 40% built | AMIGO SHELTERS PVT LTD | Apartment | 1,044–1,480 sqft carpet (as filed) | Mar 2028 |
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
8 of 185 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Nava Utsava in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 1,007 sq m |
|---|
| Joint development agreement registered | 2 Feb 2018 |
|---|
Map of 1 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Vkk Grand, price locked.
| Legacy Saviero | about 0.5 km | Locked | |
|---|---|---|---|
| Vkk Grand | 2.2 km | Locked | |
| SOBHA Victoria Park Phase 1 | about 3.5 km | Locked | |
| Nava Skanda Bellavita | about 4.5 km | Locked | |
| Assetz Sun & Sanctum - Phase 2 | about 4.5 km | Locked | |
| Brr North Excellency Phase I | about 4.5 km | Locked | |
| Lodha Mirabelle | 4.9 km | Locked | |
| Mirabelle Phase 2 | about 5 km | Locked | |
| The Pearl Paradise | 5.1 km | Locked | |
| Sumadhura Solea | 5.7 km | Locked | |
| Sumadhura Epitome | 5.9 km | Locked | |
| Sattva La Vita | 6.0 km | Locked |
| Nava Utsava This project | This project is the point the others are measured from | 31 Dec 2019 | – | Not verified yet |
|---|---|---|---|---|
| Legacy Saviero | about 0.5 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
| Vkk Grand | 2.2 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
| SOBHA Victoria Park Phase 1 | about 3.5 km | 31 Dec 2027 | 93% (280 of 300) | Locked |
| Nava Skanda Bellavita | about 4.5 km | 31 Dec 2029 | 18% (63 of 360) | Locked |
| Assetz Sun & Sanctum - Phase 2 | about 4.5 km | 31 Jul 2026 | 100% (70 of 70) | Locked |
| Brr North Excellency Phase I | about 4.5 km | 31 Dec 2029 | 33% (34 of 104) | Locked |
| Rent, 3BHK, 3 km | ₹38,600 /mo · 44 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹28,000 /mo · 148 listings | |
| Rent, 1BHK, 3 km | ₹14,000 /mo · 33 listings | |
| Rent per sq ft, 3 km | ₹25.0 /mo, as listed · 107 listings with a size |
| Projects within 4 km, counted | 23 (15 with an approximate location) | |
|---|---|---|
| Flats in them | 4,162 | |
| Booked | 2,763 of 4,162 (66%) | |
| Unsold | 1,399 | |
| Booked a month, pooled | 74 flats | |
| Months to sell, pooled | 19 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest government-flagged flood location | 790 m, Hoysala nagar in Hormavu |
| Nearest storm drain | 70 m to the south, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 370 m to the south-east, Horamavu |
| Schedule end | 31 May 2019 | |
|---|---|---|
| RERA completion date | 31 Dec 2019 | |
| Work began, as filed | 8 May 2018 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Escrow bank | Axis Bank · TC Palya |
|---|
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Local authority | |
| Nearest city water main | 1.2 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 70 m to the south, secondary drain | |
|---|---|---|
| Ground level | 900 m above sea level, plus or minus 4 m | |
| Metro, operational | 3.2 km, Benniganahalli | |
| Metro, under construction | 1.1 km, Horamavu |
| Kempegowda Airport | 28.3 | 31 | 19.9 |
| MG Road (CBD) | 11.5 | 14 | 8.6 |
| Manyata Tech Park | 6.5 | 10 | 5.1 |
| ITPL, Whitefield | 13.9 | 17 | 9.2 |
| Ecospace, Bellandur ORR | 16.4 | 26 | 11.2 |
| Electronic City Ph 1 | 28.3 | 35 | 20.7 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 860 m to the north, named Bangalore Water Supply and Sewerage Board on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.4 km to the west, named Banaswadi Substation on OpenStreetMap |