Overview
Nitesh Cape Cod
Overview
Nitesh Cape Cod
Overview
Nitesh Cape Cod
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate.
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire NOC (1 of 2) | GBC(1)294/2011 | Clear |
| Fire NOC (2 of 2) | GBC(1)294/2011 · building height 45 m | Clear |
| Environmental clearance |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹91.54 Cr
Loan & collateral
| Escrow bank | YES BANK · Kasturba Road |
|---|
Data room
75 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | 2 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | 1 | – | Review |
| Loan & collateral | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Adarsh Palm RetreatLapsed · completion date passed | Adarsh Developers | Apartment | 975–5,250 sqft | – |
| Adarsh Palm Retreat Mayberry-Phase 1Lapsed · completion date passed | Akarsh Residence Pvt Ltd | Apartment | 1,757–2,706 sqft carpet (as filed) | Mar 2026 |
| Adarsh RosewoodActive · 15% built | Adarsh Developers | Apartment | 1,335–1,900 sqft | Dec 2027 |
| Aishwarya SiliconLapsed · completion date passed | M/s.AISHWARYA BUILDCON DEVELOPERS | Apartment | 1,084 sqft carpet (as filed) | Apr 2022 |
| August GrandCompleted (regulator flag) | August Ventures Private Limited | Apartment | 1,944 sqft carpet (as filed) | Completed |
| Balaji MonarchCompleted · OC 04-12-2020 | SRI BALAJI BUILDERS | Apartment | 835 sqft carpet (as filed) | Completed |
| Bilva ElinaLapsed · completion date passed | Jagadish v | Apartment | – | Jul 2019 |
| Carbon Corner StoneCompleted (regulator flag) | CARBON DEVELOPERS Pvt Ltd | Apartment | – | Completed |
8 of 44 other projects in Bellandur, A to Z. Status is taken from each project's own filing.
All 46 projects in Bellandur → · Nitesh Estates's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Nitesh Cape Cod in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 17,705 sq m | |
|---|---|---|
| Title deed | Sy 18/1C, Varthur hobli |
| Filed with the registration |
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | Rejected · Applied 9 May 2019 | |
|---|---|---|
| RERA completion date | 31 Dec 2018 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Map of 4 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Adarsh Rosewood, price locked; Satori Residence By Genurise, price locked; Adarsh Parkland, price locked; Aydin Infra Signature 3, price locked.
| Nitesh Cape Cod This project | This project is the point the others are measured from | 31 Dec 2018 | – | Not verified yet |
|---|---|---|---|---|
| Adarsh Rosewood | 2.2 km | 31 Dec 2027 | 20% (24 of 122) | Locked |
| Satori Residence By Genurise | 2.8 km | 30 Jun 2030 | 10% (16 of 161) | Locked |
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 3 km | 30 Dec 2030 | 25% (38 of 150) | Locked |
| Adarsh Parkland | 3.6 km | – | – | Locked |
| Aydin Infra Signature 3 | 3.7 km | 5 Aug 2027 | 50% (6 of 12) | Locked |
| Sobha Royal Pavilion Phase 8 - Wing 15 | 4.1 km | 30 Jun 2026 | 100% (113 of 113) | Locked |
| Rent, 4BHK, 3 km | ₹95,000 /mo · 21 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹71,336 /mo · 289 listings | |
| Rent, 2BHK, 3 km | ₹43,000 /mo · 332 listings | |
| Rent, 1BHK, 3 km | ₹21,000 /mo · 140 listings | |
| Rent per sq ft, 3 km | ₹40.0 /mo, as listed · 349 listings with a size |
| Projects within 4 km, counted | 45 (17 with an approximate location) | |
|---|---|---|
| Flats in them | 7,649 | |
| Booked | 3,684 of 7,649 (48%) | |
| Unsold | 3,965 | |
| Booked a month, pooled | 103 flats | |
| Months to sell, pooled | 35 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Industrial (hi-tech), at the filed pin | |
|---|---|---|
| Nearest government-flagged flood location | 590 m, Bellandur |
| Nearest storm drain | 10 m, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 270 m to the south-east, Belandur Sowlakeri |
| Schedule end | 31 Dec 2018 | |
|---|---|---|
| RERA completion date | 31 Dec 2018 | Red flag |
| Work began, as filed | 19 Mar 2012 |
| Building heights, fire NOC | 45 m on the fire NOC |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety (1 of 2) | GBC(1)294/2011 | |
|---|---|---|
| Fire safety (2 of 2) | GBC(1)294/2011 · building height 45 m | |
| Environmental clearance | Filed with the registration |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹238.26 Cr |
|---|
| Escrow bank | YES BANK · Kasturba Road |
|---|
| K-RERA registrations under this promoter | 11 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 10 | Review |
| Revoked or withdrawn | 1 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Self development | |
| Nearest city water main | 130 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 10 m, tertiary drain | |
|---|---|---|
| Ground level | 880 m above sea level, plus or minus 4 m | |
| Metro, operational | 5.2 km, Hongasandra | |
| Metro, under construction | 820 m, Bellandur |
| Kempegowda Airport | 49.6 | 49 | 30.9 |
| MG Road (CBD) | 13.6 | 19 | 10.0 |
| Manyata Tech Park | 20.6 | 28 | 14.9 |
| ITPL, Whitefield | 14.9 | 18 | 9.7 |
| Ecospace, Bellandur ORR | 2.4 | 5 | 0.7 |
| Electronic City Ph 1 | 14.1 | 18 | 9.2 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 480 m to the south-east, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 560 m to the north-east |