Overview
No 12 Lloyds Road
Overview
No 12 Lloyds Road
Overview
No 12 Lloyds Road
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Khata issued
A Khatha · BBMP · Survey 86/25-13
K-RERA filing, land schedule
Approvals
| Building plan (BBMP) | Sanctioned 7 Jul 2022 · No. BBMP/Ad.Com/EST/0639/21-22 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK 100%
Location & risks
Construction & progress
Developer
Land · ₹4.35 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 7 Jul 2022 | |
| Escrow bank | ICICI Bank · Coxtown |
Data room
115 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| AlcazarRegistered · no quarterly update yet | PANTHEON ONE | Apartment | 1,751–2,380 sqft carpet (as filed) | Mar 2024 |
| Brigade Legacy | Brigade Group | Apartment | 2,156–3,000 sqft | – |
| CharisCompleted (regulator flag) | Lewis Infrastructure and Projects | Apartment | – | Completed |
| Chartered Karthika | Chartered Housing | Apartment | 2,361 sqft | – |
| Donata VistaCompleted · OC 22-03-2024 | Sanjeev Wahi | Apartment | 1,310 sqft carpet (as filed) | Completed |
| El RoiActive · 82% built | LEWIS INFRASTRUCTURE AND PROJECTS | Apartment | 1,382 sqft carpet (as filed) | Mar 2028 |
| Jose EsperancaLapsed · completion date passed | M/s Sindhuri Infra Projects | Apartment | – | Apr 2022 |
| Koncept Ambience DowntownExtended to 31-12-2026 | Koncept Ambience | Apartment | 2,477–3,131 sqft | Dec 2026 |
8 of 22 other projects in Frazer Town, A to Z. Status is taken from each project's own filing.
All 24 projects in Frazer Town → · Lewis Infrastructure And Projects's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open No 12 Lloyds Road in the interactive atlas
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Ad.Com/EST/0639/21-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/240323/005817
K-RERA registration ·
Approval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 86-25-13 | |
|---|---|---|
| Land extent, Sy 86-25-13 | 557.41 (unit to confirm) | |
| Land area of this registration | 557 sq m | |
| Khata | A Khatha · BBMP · 4 Jan 2016 | |
| Title deed | Consideration ₹1.30 Cr | |
| Title deed | Consideration ₹1.30 Cr |
| Joint development agreement number | 4237 of Book 1, 2021-22 |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Jun 2024 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 86-25-13 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 3BHK | 8 | 9,494 |
| Magnolia Delight | about 3.5 km | Locked | |
|---|---|---|---|
| Ranka Iris | about 4 km | Locked | |
| Legacy Saviero | about 5 km | Locked | |
| Century Regalia (Project 2) | about 5.5 km | Locked | |
| Lodha Mirabelle | about 5.5 km | Locked | |
| Mirabelle Phase 2 | about 5.5 km | Locked | |
| Vkk Grand | about 6 km | Locked | |
| Vista Svara | about 6 km | Locked | |
| Renaissance Srichakra | about 6.5 km | Locked | |
| Brr North Excellency Phase I | about 6.5 km | Locked | |
| Sumadhura Solea | about 7 km | Locked | |
| Vista Padmalaya | about 7 km | Locked |
| No 12 Lloyds Road This project | This project is the point the others are measured from | 30 Jun 2024 | – | Not verified yet |
|---|---|---|---|---|
| Magnolia Delight | about 3.5 km | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Ranka Iris | about 4 km | 30 Apr 2026 | 62% (8 of 13) | Locked |
| Legacy Saviero | about 5 km | 30 Jun 2027 | 45% (43 of 96) |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 0.5 km, Cox town |
|---|
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.13 (9 covered spaces for 8 units) | |
| Power backup | Declared by the promoter |
| Possession, agreement | 30 Jun 2024 | |
|---|---|---|
| Schedule end | 20 Jun 2024 | |
| RERA completion date | 30 Jun 2024 | Red flag |
| Work began, as filed | 30 Dec 2022 |
| Building heights, fire NOC | 11.5 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 1655 sq m |
|---|
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹8.88 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹3.56 Cr |
| Escrow bank | ICICI Bank · Coxtown | |
|---|---|---|
| Share of collections the promoter declared for escrow | 70% |
| K-RERA registrations under this promoter | 9 | |
|---|---|---|
| Marked completed | 5 | |
| Past promised date, not completed | 2 | |
| Other phases under this promoter name | 8 | |
| With a filed extension or completion | 6 (5 completed, 1 extended) | |
| Average schedule slip | 7 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Locked |
| Century Regalia (Project 2) | about 5.5 km | 28 Feb 2030 | 63% (80 of 128) | Locked |
|---|
| Lodha Mirabelle | about 5.5 km | 30 Jun 2028 | 96% (418 of 437) | Locked |
|---|
| Mirabelle Phase 2 | about 5.5 km | 31 May 2030 | 61% (173 of 284) | Locked |
|---|
| Projects within 4 km, counted | 19 (19 with an approximate location) | |
|---|---|---|
| Flats in them | 506 | |
| Booked | 188 of 506 (37%) | |
| Unsold | 318 | |
| Booked a month, pooled | 6 flats | |
| Months to sell, pooled | 57 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | Borewell, BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, secondary drain | |
|---|---|---|
| Metro, operational | about 2.5 km, Halasuru | |
| Metro, under construction | about 1.5 km, Pottery Town |
| Kempegowda Airport | 30 | 24 |
| MG Road (CBD) | 5.5 | 3.5 |
| Manyata Tech Park | 6.5 | 5 |
| ITPL, Whitefield | 16 | 12.5 |
| Ecospace, Bellandur ORR | 18 | 10.5 |
| Electronic City Ph 1 | 25 | 19 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km, named Halasuru 2MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | about 1.5 km, named Kalpalli Cemetery Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named ITC Substation on OpenStreetMap |