Overview
No 3 Milton Street
Overview
No 3 Milton Street
Overview
No 3 Milton Street
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Khata issued
E Khatha · BRUHAT BENGALURU MAHANAGARA PALIKE · Survey 3
K-RERA filing, land schedule
Approvals
| Building plan (BBMP) | Sanctioned 24 Jun 2022 · No. BBMP/Ad.Com./EST/1360/21-22 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 113 m² 100%
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 24 Jun 2022 | |
| Escrow bank | ICICI Bank · Coxtown |
Data room
136 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| AlcazarRegistered · no quarterly update yet | PANTHEON ONE | Apartment | 1,751–2,380 sqft carpet (as filed) | Mar 2024 |
| Brigade Legacy | Brigade Group | Apartment | 2,156–3,000 sqft | – |
| CharisCompleted (regulator flag) | Lewis Infrastructure and Projects | Apartment | – | Completed |
| Chartered Karthika | Chartered Housing | Apartment | 2,361 sqft | – |
| Donata VistaCompleted · OC 22-03-2024 | Sanjeev Wahi | Apartment | 1,310 sqft carpet (as filed) | Completed |
| El RoiActive · 82% built | LEWIS INFRASTRUCTURE AND PROJECTS | Apartment | 1,382 sqft carpet (as filed) | Mar 2028 |
| Jose EsperancaLapsed · completion date passed | M/s Sindhuri Infra Projects | Apartment | – | Apr 2022 |
| Koncept Ambience DowntownExtended to 31-12-2026 | Koncept Ambience | Apartment | 2,477–3,131 sqft | Dec 2026 |
8 of 22 other projects in Frazer Town, A to Z. Status is taken from each project's own filing.
All 24 projects in Frazer Town → · Lewis Infrastructure And Projects's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open No 3 Milton Street in the interactive atlas
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Ad.Com./EST/1360/21-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/210323/005801
K-RERA registration ·
Approval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
Page 1
Page 1 of 1 of the encumbrance certificate. Filed with K-RERA: EC from 01.04.2004 to till date, 1 page.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 3 | |
|---|---|---|
| Land extent, Sy 3 | 613.15 (unit to confirm) | |
| Land area of this registration | 613 sq m | |
| Khata | E Khatha · BRUHAT BENGALURU MAHANAGARA PALIKE · 15 Jun 2022 |
| Joint development agreement number | 21774 of Book 1, 2019-20 |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Jun 2024 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 3 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 3BHK | 11 | 1,216 |
| Magnolia Delight | about 3.5 km | Locked | |
|---|---|---|---|
| Ranka Iris | about 4 km | Locked | |
| Legacy Saviero | about 4.5 km | Locked | |
| Century Regalia (Project 2) | about 5.5 km | Locked | |
| Lodha Mirabelle | about 5.5 km | Locked | |
| Mirabelle Phase 2 | about 5.5 km | Locked | |
| Vkk Grand | about 5.5 km | Locked | |
| Vista Svara | about 6.5 km | Locked | |
| Brr North Excellency Phase I | about 6.5 km | Locked | |
| Renaissance Srichakra | about 6.5 km | Locked | |
| Sumadhura Solea | about 7 km | Locked | |
| Sumadhura Epitome | about 7 km | Locked |
| No 3 Milton Street This project | This project is the point the others are measured from | 30 Jun 2024 | – | Not verified yet |
|---|---|---|---|---|
| Magnolia Delight | about 3.5 km | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Ranka Iris | about 4 km | 30 Apr 2026 | 62% (8 of 13) | Locked |
| Legacy Saviero | about 4.5 km | 30 Jun 2027 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 0.5 km, Cox town |
|---|
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 1 km, an unnamed water body |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.00 (11 covered spaces for 11 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 10 Jan 2024 |
|---|
| Schedule end | 31 Mar 2024 | |
|---|---|---|
| RERA completion date | 30 Jun 2024 | |
| Completion date, agreement | 30 Jun 2024 | |
| Grace period for possession | 3 months | |
| Work began, as filed | 1 Jun 2022 |
| Building heights, fire NOC | 13 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 1998 sq m |
|---|
| Chartered accountant's certificate, registration | Dated 6 Sep 2022 |
|---|
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹4.50 Cr 50.8%Development · ₹4.36 Cr 49.2%
| Estimated cost, at registration | ₹8.86 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹3.27 Cr |
Sold (2) 18.2%Unsold (9) 81.8%
| Flats sold, at completion | 2 | |
|---|---|---|
| Flats unsold, at completion | 9 | |
| Flats in the phase | 11 |
| Escrow bank | ICICI Bank · Coxtown | |
|---|---|---|
| Share of collections the promoter declared for escrow | 70% |
| K-RERA registrations under this promoter | 9 | |
|---|---|---|
| Marked completed | 5 | |
| Past promised date, not completed | 2 | |
| Other phases under this promoter name | 8 | |
| With a filed extension or completion | 5 (4 completed, 1 extended) | |
| Average schedule slip | 9 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 45% (43 of 96) |
| Locked |
| Century Regalia (Project 2) | about 5.5 km | 28 Feb 2030 | 63% (80 of 128) | Locked |
|---|
| Lodha Mirabelle | about 5.5 km | 30 Jun 2028 | 96% (418 of 437) | Locked |
|---|
| Mirabelle Phase 2 | about 5.5 km | 31 May 2030 | 61% (173 of 284) | Locked |
|---|
| Projects within 4 km, counted | 18 (18 with an approximate location) | |
|---|---|---|
| Flats in them | 497 | |
| Booked | 186 of 497 (37%) | |
| Unsold | 311 | |
| Booked a month, pooled | 5 flats | |
| Months to sell, pooled | 57 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | Borewell, BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, secondary drain | |
|---|---|---|
| Metro, operational | about 2.5 km, Halasuru | |
| Metro, under construction | about 1.5 km, Tannery Road |
| Kempegowda Airport | 30 | 23.5 |
| MG Road (CBD) | 6 | 4 |
| Manyata Tech Park | 6.5 | 5 |
| ITPL, Whitefield | 15.5 | 12 |
| Ecospace, Bellandur ORR | 17.5 | 10.5 |
| Electronic City Ph 1 | 25.5 | 19 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km, named Halasuru 2MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | about 1 km, named Kalpalli Cemetery Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named Raheja Mansion Substation on OpenStreetMap |