Overview
Plumeria Lifestyle At Brigade Meadows
Overview
Plumeria Lifestyle At Brigade Meadows
Overview
Plumeria Lifestyle At Brigade Meadows
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Transfer of the land
Title deed executed
Sy 141
Title deed filed with K-RERA, pp. 1, 305
Approvals
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Mar 2021 |
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Forfeiture, agreement | The booking amount |
|---|
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion | Completed, occupancy certificate filed with K-RERA |
|---|
Developer
Land · ₹11.03 Cr 5.2%
Loan & collateral
| Records searched to | 14 Jun 2018 | Review |
|---|---|---|
| Escrow bank | KOTAK MAHINDRA BANK · MG Road |
Data room
44 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 5 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 5 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | 1 | – | Review |
| 1410 The ResidencesCompleted (regulator flag) | Hitin Property Developments | Apartment | 1,550 sqft carpet (as filed) | Completed |
| A.N. ComfortsCompleted · OC 30-12-2019 | D. Anand Naidu | Apartment | – | Completed |
| Aarohana AlterraActive · 2% built | AAROHANA PROJECTS | Apartment | 1,133–1,936 sqft carpet (as filed) | Aug 2033 |
| AayodhyaLapsed · completion date passed | UTOCORP | Apartment | 285 sqft carpet (as filed) | Jun 2024 |
| AiekyaCompleted · OC 18-08-2025 | Avaneesh Ventures | Apartment | 1,129 sqft carpet (as filed) | Completed |
| Aikyam Emerald GroveCompleted (regulator flag) | AIKYAM VENTURES | Plot | – | Completed |
| Amberstone ElanzaActive · 63% built | SRIVARI VENTURES | Apartment | 804–1,161 sqft carpet (as filed) | Dec 2028 |
| Amberstone IlluminaActive · 54% built | SRIVARI DWELLINGS | Apartment | 793–1,071 sqft carpet (as filed) | Dec 2028 |
8 of 170 other projects in Kanakapura Road, A to Z. Status is taken from each project's own filing.
All 180 projects in Kanakapura Road → · Brigade Group's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Plumeria Lifestyle At Brigade Meadows in the interactive atlas
Transfer of the land
Title deed executed
Sy 141
Title deed filed with K-RERA, pp. 1, 161 · See it in Documents
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/181022/002096
K-RERA registration ·
Transfer of the landTitle checkApproval or registration
Read from the original document
| Records searched to | 14 Jun 2018 |
|---|
Page 1
Page 1 of 73 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 73 pages, English.
| Filed survey numbers matched to the KGIS map | 5 of 5 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 32,247 sq m | |
| Land area filed with K-RERA | 15,866 sq m | |
| Village, hobli and taluk on the KGIS map | K.G.Kaggalipura, Uttarahalli-2 hobli, Bangalore-South taluk | |
| Mutation entry | None open on 6 of 6 filed surveys |
Satellite map with the 5 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 5 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Whole survey numbers on the KGIS map | 32,247 sq m (the project holds a share) | |
|---|---|---|
| Land area of this registration | 15,866 sq m |
| Sy. No. 146 | 1 | 1 acre 15 guntas | 0 | ||||
| Sy. No. 147 | 2 | 23 guntas | 0 | ||||
| Sy. No. 148/3 | 1 | 27 guntas |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Defect liability | 5 years |
|---|
| Harivishram | about 0.5 km | Locked |
|---|
| Sattva Springs | about 0.5 km | Locked |
|---|
| Axis Amarissa | about 2 km | Locked |
|---|
| Jhanavi Trishul Alaska | about 6 km | Locked |
|---|
| Mahindra Eden Phase-2 | about 7 km | Locked |
|---|
| Sattva Forest Ridge | about 7.5 km | Locked |
|---|
| Srivara Vasudha | about 8 km | Locked |
|---|
| Platinum Landmark | about 8.5 km | Locked |
|---|
| Good Earth Cadence | about 9 km | Locked |
|---|
| Good Earth Ochre | about 9.5 km | Locked |
|---|
| Samaya Sunshine | about 10 km | Locked |
|---|
| Garden Square | about 10 km | Locked |
|---|
| Plumeria Lifestyle At Brigade Meadows This project | This project is the point the others are measured from | 30 Mar 2021 | – | Not verified yet |
|---|---|---|---|---|
| Harivishram | about 0.5 km | 31 Mar 2027 | 100% (152 of 152) | Locked |
| Sattva Springs | about 0.5 km | 18 Sep 2027 | 38% (25 of 66) | Locked |
| Axis Amarissa | about 2 km | 31 Dec 2029 | 30% (24 of 81) | Locked |
| Jhanavi Trishul Alaska | about 6 km | 30 Sep 2028 | 32% (47 of 148) | Locked |
| Mahindra Eden Phase-2 | about 7 km | 30 Jul 2027 | 100% (250 of 250) | Locked |
| Sattva Forest Ridge | about 7.5 km | 31 Dec 2029 | 75% (304 of 407) | Locked |
| Projects within 4 km, counted | 11 (11 with an approximate location) | |
|---|---|---|
| Flats in them | 2,146 | |
| Booked | 617 of 2,146 (29%) | |
| Unsold | 1,529 | |
| Booked a month, pooled | 15 flats | |
| Months to sell, pooled | 60 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 6.5 km, Mantri Lake view Appartment Next to Talagattapura Lake |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Self development |
| Landfill or waste transfer station | None within 3 km |
|---|
| Schedule end | 1 Jan 2020 | |
|---|---|---|
| RERA completion date | 30 Mar 2021 | |
| Work began, as filed | 27 Jul 2018 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Estimated cost, at registration | ₹211.03 Cr |
|---|
| Escrow bank | KOTAK MAHINDRA BANK · MG Road |
|---|
| K-RERA registrations under this promoter | 36 | |
|---|---|---|
| Marked completed | 13 | |
| Past promised date, not completed | 8 | |
| Revoked or withdrawn | 1 | |
| Other phases under this promoter name | 31 | |
| With a filed extension or completion | 12 (10 completed, 2 extended) | |
| Average schedule slip | 21 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 0 |
| Sy. No. 148/2 | 1 | 27 guntas | 0 |
| Sy. No. 145 | 4 | 1 acre 31 guntas | 0 |
| Sy. No. 144/141 | Not read yet | 0 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 5.5 km, Silk Institute | |
| Metro, under construction | about 11 km, Kalena Agrahara |
| Kempegowda Airport | 57 | 48 |
| MG Road (CBD) | 24 | 20.5 |
| Manyata Tech Park | 32.5 | 28.5 |
| ITPL, Whitefield | 41 | 31 |
| Ecospace, Bellandur ORR | 28.5 | 22 |
| Electronic City Ph 1 | 25.5 | 18.5 |
| Sewage treatment plant | None within 3 km |
|---|
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 0.5 km |
|---|