Extremely disappointed with the project...such pathetic selection of marbles in the rooms and bathrooms...An 8Cr project...a TOTAL LET DOWN
Overview
Prestige Sanctuary
Overview
Prestige Sanctuary
Overview
Prestige Sanctuary
Overview
Photo: RangaTitle & ownership
Approvals
| Building plan (BIAPPA) | Sanctioned 13 May 2022 · No. BIAAPA/TP/LOA/DP/106/2021-2022 | |
|---|---|---|
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Villa Type A · avg 269 m² 49.4%Villa Type C · avg 441 m²
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BIAPPA) | Sanctioned 13 May 2022 | |
| Escrow bank | KOTAK MAHINDRA BANK · Lavelle Road |
Data room
186 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Extremely disappointed with the project...such pathetic selection of marbles in the rooms and bathrooms...An 8Cr project...a TOTAL LET DOWN
Prestige for Prestigies familys, add prestige to your life
Very nice,good location who's going to stay here economically safe,it's peace of nation recomended
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | 1 | 2 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 2 | Clear |
| Loan & collateral | – | – | – | – |
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| AamayaActive · 7% built | SRK INFRA PROJECTS PRIVATE LIMITED | Plot | ~7,780–16,060 sqft (estimate: filed carpet plus 25%) | Jan 2029 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Abhi HomesExtended to 30-12-2026 | ABHI DEVELOPERS | Apartment | – | Dec 2026 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Adarsh Savana Phase 2Registered · no quarterly update yet | ALEKHYA PROPERTY DEVELOPMENTS PVT LTD. | Plot | ~1,200–3,190 sqft (estimate: filed carpet plus 25%) | Jun 2029 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
8 of 293 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Prestige Sanctuary in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Power NOC |
|---|
| Filed with the registration |
| Fire NOC | Filed with the registration |
|---|
| Environmental clearance (1 of 2) | SEIAA 95 CON 2022 · EC identification no. EC22B038KA179539 · issued 22 Aug 2022 | Clear |
|---|
| Environmental clearance (2 of 2) | SEIAA 95 CON 2022 · EC identification no. EC22B038KA179539 | Clear |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | Granted · Approved 17 Dec 2025 | |
|---|---|---|
| RERA completion date | 31 May 2026 |
| Land conversion | 4 of 4 parcels converted | |
|---|---|---|
| Sy 9 | Converted 15 Mar 1990 · Tahasildar, Devanahalli Taluk | |
| Sy 10 | Converted 18 Oct 1990 · Tahasildar, Devanahalli | |
| Sy 11 | Converted 17 Dec 1990 · Tahasildar, Devanahalli | |
| Sy 12 & 13 | Converted 17 Dec 1990 · Tahasildar Devanhalli taluk | |
| Survey numbers | 9 · 10 · 11 · 12 & 13 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Villas | Carpet per villa, average (sq ft) |
|---|---|---|
| Villa Type A | 42 | 2,896 |
| Villa Type B | 19 | 3,711 |
| Villa Type C | 24 | 4,750 |
| Sold, Q1 2026-27 | 85 / 85 | |
|---|---|---|
| Unsold, Q1 2026-27 | 0 |
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 9 km | Locked | |
|---|---|---|---|
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 9 km | Locked | |
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 9 km | Locked | |
| Aeropolis, A Project Of Sattva Group | about 11.5 km | Locked |
| Prestige Sanctuary This project | This project is the point the others are measured from | 31 May 2026 | 100% (85 of 85) | Not verified yet |
|---|---|---|---|---|
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 9 km | 31 Dec 2026 | 100% (30 of 30) | Locked |
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 9 km | 30 Jun 2027 | 100% (30 of 30) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 25 km, Kondappa layout |
|---|
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 100% | |
| CCTV Surveillance, built | 100% | |
| Outdoor Sports facility, built | 100% | |
| Swimming Pool, built | 100% | |
| Parks, built | 100% | |
| Water and Sanitation, built | 100% | |
| Covered parking per unit | 1.35 (115 covered spaces for 85 units) | |
| Power backup | Declared by the promoter |
As the promoter reported it
| Main structure | 100% · planned by 31 Oct 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 30 Nov 2025 | |
| Completion | 100% |
| Schedule end | 30 Nov 2025 | |
|---|---|---|
| RERA completion date | 31 May 2026 | |
| Work began, as filed | 1 Dec 2022 |
| Building heights, fire NOC | 15 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 208 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jun 2026 (3 filed) | Clear |
|---|---|---|
| Fire safety | Filed with the registration | |
| Environmental clearance (1 of 2) | SEIAA 95 CON 2022 · EC identification no. EC22B038KA179539 · issued 22 Aug 2022 | |
| Environmental clearance (2 of 2) | SEIAA 95 CON 2022 · EC identification no. EC22B038KA179539 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jun 2026 (3 filed) | |
| Architect's certificate, registration | Dated 15 Sep 2022 · site inspected 15 Sep 2022 | |
| Chartered accountant's certificate, registration | Dated 15 Sep 2022 | |
| Chartered accountant, Form 4 | Dated 14 Apr 2026 | |
| Architect's site inspection for the quarterly progress certificate | 4 Jun 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹1.87 Cr 0.8%Development · ₹237.99 Cr 99.2%
| Estimated cost, at registration | ₹239.86 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹237.70 Cr |
Sold (85) 100%
| Sold, Q3 2025-26 | 85 / 85 · 0 available | |
|---|---|---|
| Sold, Q4 2025-26 | 85 / 85 · 0 available | |
| Sold, Q1 2026-27 | 85 / 85 · 0 available | |
| Unsold, Q1 2026-27 | 0 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| 4 BHK, sold | 85 / 85 | |
| Villas booked, Form 4 Q1 2026-27 | 85 |
| Escrow bank | KOTAK MAHINDRA BANK · Lavelle Road | |
|---|---|---|
| Designated account, collected | ₹5.02 Cr in Q1 2026-27 | |
| Designated account, withdrawn | ₹14.52 Cr in Q1 2026-27 | |
| Amount deposited in the quarter, Form 4 | ₹8,86,91,645 | |
| Share of collections deposited in escrow | 70% | |
| Sale proceeds realised, Q4 2025-26 | ₹11,95,65,576 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 9 km | 31 Dec 2027 | 100% (20 of 20) | Locked |
|---|
| Aeropolis, A Project Of Sattva Group | about 11.5 km | 9 Jul 2026 | 95% (949 of 1,001) | Locked |
|---|
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class | |
| Through the year | January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several) | |
| Water supply, as filed | Borewell, Local authority (Local Panchayat) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 35 km, K.R. Puram | |
| Metro, under construction | about 13 km, Airport City |
| Kempegowda Airport | 19 | 13 |
| MG Road (CBD) | 44.5 | 39 |
| Manyata Tech Park | 39.5 | 31 |
| ITPL, Whitefield | 48.5 | 37 |
| Ecospace, Bellandur ORR | 59 | 43 |
| Electronic City Ph 1 | 64 | 53 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 1.5 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |