Title & ownership
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Forfeiture, allotment letter | Not found |
|---|
| Late-payment interest | Not found | |
|---|---|---|
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹4.45 Cr |
|---|
Loan & collateral
| Escrow bank | STATE BANK OF INDIA · Wheelers Road |
|---|
Data room
68 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| AlcazarRegistered · no quarterly update yet | PANTHEON ONE | Apartment | 1,751–2,380 sqft carpet (as filed) | Mar 2024 |
| Brigade Legacy | Brigade Group | Apartment | 2,156–3,000 sqft | – |
| CharisCompleted (regulator flag) | Lewis Infrastructure and Projects | Apartment | – | Completed |
| Chartered Karthika | Chartered Housing | Apartment | 2,361 sqft | – |
| Donata VistaCompleted · OC 22-03-2024 | Sanjeev Wahi | Apartment | 1,310 sqft carpet (as filed) | Completed |
| El RoiActive · 82% built | LEWIS INFRASTRUCTURE AND PROJECTS | Apartment | 1,382 sqft carpet (as filed) | Mar 2028 |
| Jose EsperancaLapsed · completion date passed | M/s Sindhuri Infra Projects | Apartment | – | Apr 2022 |
| Koncept Ambience DowntownExtended to 31-12-2026 | Koncept Ambience | Apartment | 2,477–3,131 sqft | Dec 2026 |
8 of 22 other projects in Frazer Town, A to Z. Status is taken from each project's own filing.
All 24 projects in Frazer Town → · Lewis Infrastructure And Projects's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Raintree is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding locality.
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 21 Feb 2020 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Interest the builder pays on late possession |
|---|
| Rs.2,00,000/- per month liquidated damages payable by the developer to the owners if the Owners Constructed Area is not handed over after the 4-month grace period (JDA cl. 7.5) |
| Holding charge | Not found |
|---|
| Magnolia Delight | about 3.5 km, to a locality centre | Locked |
|---|
| Ranka Iris | about 4 km, to a locality centre | Locked |
|---|
| Legacy Saviero | about 4.5 km, to a locality centre | Locked |
|---|
| Lodha Mirabelle | about 5.5 km, to a locality centre | Locked |
|---|
| Century Regalia (Project 2) | about 5.5 km, to a locality centre | Locked |
|---|
| Mirabelle Phase 2 | about 5.5 km, to a locality centre | Locked |
|---|
| Vkk Grand | about 5.5 km, to a locality centre | Locked |
|---|
| Brr North Excellency Phase I | about 6.5 km, to a locality centre | Locked |
|---|
| Vista Svara | about 6.5 km, to a locality centre | Locked |
|---|
| Renaissance Srichakra | about 6.5 km, to a locality centre | Locked |
|---|
| Sumadhura Solea | about 7 km, to a locality centre | Locked |
|---|
| SOBHA Victoria Park Phase 1 | about 7 km, to a locality centre | Locked |
|---|
| Raintree This project | This project is the point the others are measured from | 21 Feb 2020 | – | Not verified yet |
|---|---|---|---|---|
| Magnolia Delight | about 3.5 km, to a locality centre | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Ranka Iris | about 4 km, to a locality centre | 30 Apr 2026 | 62% (8 of 13) | Locked |
| Legacy Saviero | about 4.5 km, to a locality centre | 30 Jun 2027 | 45% (43 of 96) | Locked |
| Lodha Mirabelle | about 5.5 km, to a locality centre | 30 Jun 2028 | 96% (418 of 437) | Locked |
| Century Regalia (Project 2) | about 5.5 km, to a locality centre | 28 Feb 2030 | 63% (80 of 128) | Locked |
| Mirabelle Phase 2 | about 5.5 km, to a locality centre | 31 May 2030 | 61% (173 of 284) | Locked |
| Nearest storm drain | about 0.5 km from the locality centre, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 1 km from the locality centre, an unnamed water body |
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | Local authority |
| Landfill or waste transfer station | None within 3 km of the locality centre | |
|---|---|---|
| Sewage treatment plant | about 1.5 km from the locality centre, named Halasuru 2MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km of the locality centre | |
| Crematorium | about 1 km from the locality centre, named Kalpalli Cemetery Crematorium on OpenStreetMap | |
| Prison | None within 3 km of the locality centre | |
| Electrical substation | about 0.5 km from the locality centre, named Raheja Mansion Substation on OpenStreetMap |
| Completion | Completed, occupancy certificate filed with K-RERA |
|---|
| Schedule end | 30 Jul 2018 | |
|---|---|---|
| RERA completion date | 21 Feb 2020 | |
| Work began, as filed | 21 Feb 2018 |
| Structure | RCC framed structure | |
|---|---|---|
| Wall thickness | All walls: 6 " |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Wooden windows | |
|---|---|---|
| Flooring | Vitrified tiles | |
| Wiring | Concealed copper wiring | |
| Power backup | Power backup for lifts |
| Fire safety | Not found | |
|---|---|---|
| Environmental clearance | Not found |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Escrow bank | STATE BANK OF INDIA · Wheelers Road |
|---|
| K-RERA registrations under this promoter | 9 | |
|---|---|---|
| Marked completed | 5 | |
| Past promised date, not completed | 2 | |
| Other phases under this promoter name | 8 | |
| With a filed extension or completion | 5 (4 completed, 1 extended) | |
| Average schedule slip | 7 months |
Map centred on the locality the filing names, approximate: locality level. The filing names only the locality. The marker is its centre and the ring is 5 km; it does not mark the site.
Centre of the filed locality; basemap © OpenStreetMap contributors
Map centred on the locality the filing names, approximate: locality level. The filing names only the locality. The marker is its centre and the ring is 5 km; it does not mark the site.
Centre of the filed locality; basemap © OpenStreetMap contributors
| Nearest drain | about 0.5 km from the locality centre, tertiary drain |
|---|