Most unprofessional builder. There is a lots of issues. Which is not resolved after 4 yrs also. Big issue is seepage. They even don't bother to listen any of the issues after sailing their property.
Overview
Rohan Upavan Phase IV
Overview
Rohan Upavan Phase IV
Overview
Rohan Upavan Phase IV
Overview
Title & ownership
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire NOC | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion |
|---|
Developer
Land · ₹24.06 Cr
Loan & collateral
| Escrow bank | Axis Bank · MG Road |
|---|
Data room
53 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Most unprofessional builder. There is a lots of issues. Which is not resolved after 4 yrs also. Big issue is seepage. They even don't bother to listen any of the issues after sailing their property.
Nice Apartment big big buildings 17 floors Available and Cleanliness Well Maintained good parking space n small park in Area n houses are Very Good located in cool place
Great apartments in affordable prices according the amenities. Building a great community. Great views on all top floors Separate view for Kalkare Lake. Near byrathi cross, new international airport road. Separate view for orchard inside…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh PinecourtLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | 382–1,141 sqft carpet (as filed) | Mar 2026 |
| Adarsh PinecourtWithdrawn | Nusrath Unisa | Apartment | – | Nov 2023 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
| Amigo PalacioActive · 40% built | AMIGO SHELTERS PVT LTD | Apartment | 1,044–1,480 sqft carpet (as filed) | Mar 2028 |
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
8 of 185 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
All 195 projects in Hennur Road → · Rohan Builders's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Rohan Upavan Phase IV in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Jun 2026 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Vkk Grand | about 1.5 km | Locked |
|---|
| Lodha Mirabelle | about 2.5 km | Locked |
|---|
| Mirabelle Phase 2 | about 2.5 km | Locked |
|---|
| Brr North Excellency Phase I | about 2.5 km | Locked |
|---|
| Legacy Saviero | about 2.5 km | Locked |
|---|
| SOBHA Victoria Park Phase 1 | about 3 km | Locked |
|---|
| Sumadhura Solea | about 3.5 km | Locked |
|---|
| Sumadhura Epitome | about 3.5 km | Locked |
|---|
| Nava Skanda Bellavita | about 3.5 km | Locked |
|---|
| The Pearl Paradise | about 4.5 km | Locked |
|---|
| Sattva La Vita | about 4.5 km | Locked |
|---|
| Magnolia Delight | about 4.5 km | Locked |
|---|
| Rohan Upavan Phase IV This project | This project is the point the others are measured from | 30 Jun 2026 | – | Not verified yet |
|---|---|---|---|---|
| Vkk Grand | about 1.5 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
| Lodha Mirabelle | about 2.5 km | 30 Jun 2028 | 96% (418 of 437) | Locked |
| Mirabelle Phase 2 | about 2.5 km | 31 May 2030 | 61% (173 of 284) | Locked |
| Brr North Excellency Phase I | about 2.5 km | 31 Dec 2029 | 33% (34 of 104) | Locked |
| Legacy Saviero | about 2.5 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
| SOBHA Victoria Park Phase 1 | about 3 km | 31 Dec 2027 | 93% (280 of 300) | Locked |
| Projects within 4 km, counted | 31 (31 with an approximate location) | |
|---|---|---|
| Flats in them | 5,429 | |
| Booked | 2,904 of 5,429 (53%) | |
| Unsold | 2,525 | |
| Booked a month, pooled | 52 flats | |
| Months to sell, pooled | 49 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 0.5 km, HBR Layout |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | Local authority |
| Completed, occupancy certificate 18 May 2024 |
| Schedule end | 31 Aug 2025 | |
|---|---|---|
| RERA completion date | 30 Jun 2026 | |
| Work began, as filed | 30 Jun 2018 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety | Filed with the registration | |
|---|---|---|
| Environmental clearance | Filed with the registration |
| Estimated cost, at registration | ₹82.45 Cr |
|---|
Sold (63) 53.4%Unsold (55) 46.6%
| Flats sold, at completion | 63 | |
|---|---|---|
| Flats unsold, at completion | 55 | |
| Flats in the phase | 118 |
| Escrow bank | Axis Bank · MG Road |
|---|
| K-RERA registrations under this promoter | 11 | |
|---|---|---|
| Marked completed | 10 | |
| Past promised date, not completed | 0 | |
| Other phases under this promoter name | 7 | |
| With a filed extension or completion | 7 (7 completed, 0 extended) | |
| Average schedule slip | 11 months early |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 5.5 km, Baiyappanahalli | |
| Metro, under construction | about 1.5 km, Kalyan Nagar |
| Kempegowda Airport | 25 | 19.5 |
| MG Road (CBD) | 9.5 | 8 |
| Manyata Tech Park | 4 | 2.5 |
| ITPL, Whitefield | 16.5 | 12 |
| Ecospace, Bellandur ORR | 22 | 13 |
| Electronic City Ph 1 | 30 | 22.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |