| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | 1 | Clear |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | 2 | |
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh PinecourtLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | 382–1,141 sqft carpet (as filed) | Mar 2026 |
| Adarsh PinecourtWithdrawn | Nusrath Unisa | Apartment | – | Nov 2023 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of 5 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 5 pages, English.
Approvals
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2020 |
Disputes & cases
Builder: M/s.RR Constructions
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Search pending. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion | Completed, occupancy certificate filed with K-RERA |
|---|
Developer
| Estimated cost, at registration | ₹5.00 Cr |
|---|
Loan & collateral
| Escrow bank | ANDHRA BANK · K.R.Puram |
|---|
Data room
Source: K-RERA project page and the documents filed there, as read by us. 2 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Clear |
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Amigo PalacioActive · 40% built | AMIGO SHELTERS PVT LTD | Apartment | 1,044–1,480 sqft carpet (as filed) | Mar 2028 |
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
8 of 185 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Rr White Lotus in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 1,253 sq m |
|---|
Map of 4 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Vkk Grand, price locked; The Pearl Paradise, price locked; Lodha Mirabelle, price locked; Sumadhura Solea, price locked.
| Vkk Grand | 220 m | Locked | |
|---|---|---|---|
| SOBHA Victoria Park Phase 1 | about 1.5 km | Locked | |
| Legacy Saviero | about 2 km | Locked | |
| Nava Skanda Bellavita | about 2.5 km | Locked | |
| Brr North Excellency Phase I | about 3 km | Locked | |
| The Pearl Paradise | 3.3 km | Locked | |
| Lodha Mirabelle | 3.4 km | Locked | |
| Mirabelle Phase 2 | about 3.5 km | Locked | |
| Sumadhura Solea | 3.9 km | Locked | |
| Sattva La Vita | 4.0 km | Locked | |
| Sumadhura Epitome | 4.2 km | Locked | |
| Radiance Floresta | about 4.5 km | Locked |
| Rr White Lotus This project | This project is the point the others are measured from | 31 Dec 2020 | – | Not verified yet |
|---|---|---|---|---|
| Vkk Grand | 220 m | 30 Jun 2027 | 49% (59 of 120) | Locked |
| SOBHA Victoria Park Phase 1 | about 1.5 km | 31 Dec 2027 | 93% (280 of 300) | Locked |
| Legacy Saviero | about 2 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
| Nava Skanda Bellavita | about 2.5 km | 31 Dec 2029 | 18% (63 of 360) | Locked |
| Brr North Excellency Phase I | about 3 km | 31 Dec 2029 | 33% (34 of 104) | Locked |
| The Pearl Paradise | 3.3 km | 31 Dec 2026 | 72% (23 of 32) | Locked |
| Rent, 3BHK, 3 km | ₹38,000 /mo · 44 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹27,500 /mo · 104 listings | |
| Rent, 1BHK, 3 km | ₹15,000 /mo · 17 listings | |
| Rent per sq ft, 3 km | ₹25.0 /mo, as listed · 89 listings with a size |
| Projects within 4 km, counted | 38 (21 with an approximate location) | |
|---|---|---|
| Flats in them | 7,252 | |
| Booked | 3,872 of 7,252 (53%) | |
| Unsold | 3,380 | |
| Booked a month, pooled | 109 flats | |
| Months to sell, pooled | 31 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 66 kV, 150 m from the filed location | Clear |
| Nearest government-flagged flood location | 1.2 km, Vaddera Palya (Railway track) |
| Nearest storm drain | 30 m to the north-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 330 m to the north, Kalkere Lake |
| Schedule end | 30 Sep 2018 | |
|---|---|---|
| RERA completion date | 31 Dec 2020 | |
| Work began, as filed | 10 May 2018 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Escrow bank | ANDHRA BANK · K.R.Puram |
|---|
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Local authority | |
| Nearest city water main | 420 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 30 m to the north-east, tertiary drain | |
|---|---|---|
| Ground level | 883 m above sea level, plus or minus 4 m | |
| Metro, operational | 5.1 km, Benniganahalli | |
| Metro, under construction | 2.3 km, HRBR Layout |
| Kempegowda Airport | 26.3 | 28 | 18.4 |
| MG Road (CBD) | 11.7 | 15 | 9.3 |
| Manyata Tech Park | 6.1 | 9 | 3.8 |
| ITPL, Whitefield | 15.1 | 20 | 10.8 |
| Ecospace, Bellandur ORR | 18.1 | 29 | 13.1 |
| Electronic City Ph 1 | 30.3 | 39 | 22.6 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 750 m to the north-east, named Horamavu Agara 20MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.1 km to the north-west |