Photo: S2 VIOLETTitle & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3 BHK Flats · avg 90 m² 56.3%2 BHK Flats · avg 70 m²
Location & risks
Construction & progress
Developer
Land · ₹10.64 Cr 46.2%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 2 Dec 2022 | |
| Escrow bank | HDFC · HRBR Layout Branch |
Data room
110 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh PinecourtLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | 382–1,141 sqft carpet (as filed) | Mar 2026 |
| Adarsh PinecourtWithdrawn | Nusrath Unisa | Apartment | – | Nov 2023 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
| Amigo PalacioActive · 40% built | AMIGO SHELTERS PVT LTD | Apartment | 1,044–1,480 sqft carpet (as filed) | Mar 2028 |
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
8 of 185 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open S2 Violet in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 2 Dec 2022 · No. BBMP/Ad.Com./MDP/0555/22-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-121723 · issued 15 Dec 2022 · valid until 14 Dec 2027 | Clear |
| Water and sewerage NOC (BWSSB) | issued 20 Mar 2023 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2024 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 230/14,15,16,17/234/4 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2 BHK Flats | 28 | 753 |
| 3 BHK Flats | 36 | 972 |
| Vkk Grand | about 1 km | Locked | |
|---|---|---|---|
| SOBHA Victoria Park Phase 1 | about 1.5 km | Locked | |
| Legacy Saviero | about 2 km | Locked | |
| Nava Skanda Bellavita | about 2.5 km | Locked | |
| The Pearl Paradise | about 3.5 km | Locked | |
| Brr North Excellency Phase I | about 3.5 km | Locked | |
| Lodha Mirabelle | about 4 km | Locked | |
| Mirabelle Phase 2 | about 4 km | Locked | |
| Sattva La Vita | about 4.5 km | Locked | |
| Radiance Floresta | about 4.5 km | Locked | |
| Sumadhura Solea | about 4.5 km | Locked | |
| Adarsh Pinecourt | about 4.5 km | Locked |
| S2 Violet This project | This project is the point the others are measured from | 31 Dec 2024 | – | Not verified yet |
|---|---|---|---|---|
| Vkk Grand | about 1 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
| SOBHA Victoria Park Phase 1 | about 1.5 km | 31 Dec 2027 | 93% (280 of 300) | Locked |
| Legacy Saviero | about 2 km |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 2 km, Vaddera Palya (Railway track) | |
|---|---|---|
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Horamavu |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.11 (71 covered spaces for 64 units) | |
| Power backup | Declared by the promoter |
| Possession, agreement | 31 Dec 2024 | |
|---|---|---|
| Schedule end | 31 Dec 2024 | |
| RERA completion date | 31 Dec 2024 | Red flag |
| Work began, as filed | 1 Jan 2023 |
| Structure | RCC framed structure | |
|---|---|---|
| Wall thickness | External walls: 6"; Internal walls: 4" | |
| Building heights, fire NOC | 14.4 m filed |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Aluminium windows (sliding) | |
|---|---|---|
| Flooring | Vitrified tiles | |
| Toilet tiles | Glazed tiles (walls) | |
| Wiring | Concealed copper wiring | |
| Power backup | 100% power backup for pumps, common area lighting |
| Architect's certificate, registration | Dated 2 Feb 2023 · site inspected 2 Feb 2023 | |
|---|---|---|
| Engineer's certificate, registration | Dated 16 May 2023 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹23.02 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹12.38 Cr | |
| Estimated cost, chartered accountant's certificate | ₹23.02 Cr, same as the filing |
| Escrow bank | HDFC · HRBR Layout Branch |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 30 Jun 2027 |
| 45% (43 of 96) |
| Locked |
| Nava Skanda Bellavita | about 2.5 km | 31 Dec 2029 | 18% (63 of 360) | Locked |
|---|
| The Pearl Paradise | about 3.5 km | 31 Dec 2026 | 72% (23 of 32) | Locked |
|---|
| Brr North Excellency Phase I | about 3.5 km | 31 Dec 2029 | 33% (34 of 104) | Locked |
|---|
| Projects within 4 km, counted | 36 (36 with an approximate location) | |
|---|---|---|
| Flats in them | 6,626 | |
| Booked | 3,413 of 6,626 (52%) | |
| Unsold | 3,213 | |
| Booked a month, pooled | 105 flats | |
| Months to sell, pooled | 31 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 5 km, K.R. Puram | |
| Metro, under construction | about 2.5 km, HRBR Layout |
| Kempegowda Airport | 27 | 18 |
| MG Road (CBD) | 12.5 | 10 |
| Manyata Tech Park | 7 | 4.5 |
| ITPL, Whitefield | 15.5 | 10 |
| Ecospace, Bellandur ORR | 18.5 | 13 |
| Electronic City Ph 1 | 30.5 | 22.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 0.5 km, named Horamavu Agara 20MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km |