Overview
Sankalp Manor
Overview
Sankalp Manor
Overview
Sankalp Manor
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Side | Schedule in the EC | KGIS neighbours |
|---|---|---|
| North | EC schedule not read yet | Survey 8 (J.I.Kalkere) |
| East | EC schedule not read yet | Survey 262, 263 (J.I.Kalkere) |
| South | EC schedule not read yet | Survey 6 (J.I.Kalkere) |
| West | EC schedule not read yet | Survey 573 (J.I.Kalkere) |
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire department | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion | Completed, occupancy certificate 29 Oct 2020 |
|---|
Developer
| Estimated cost, at registration | ₹22.72 Cr |
|---|
Loan & collateral
| Escrow bank | Dhanalakshmi Bank Ltd. · Peenya Branch |
|---|
Data room
50 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh PinecourtLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | 382–1,141 sqft carpet (as filed) | Mar 2026 |
| Adarsh PinecourtWithdrawn | Nusrath Unisa | Apartment | – | Nov 2023 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
| Amigo PalacioActive · 40% built | AMIGO SHELTERS PVT LTD | Apartment | 1,044–1,480 sqft carpet (as filed) | Mar 2028 |
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
8 of 185 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
All 195 projects in Hennur Road → · DS Max Properties Private Limited's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sankalp Manor in the interactive atlas
Page 1
Page 1 of 14 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 14 pages.
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Matched plots on the KGIS map | 13,509 sq m | |
| Land area filed with K-RERA | 8,253 sq m | |
| Filed area as a share of the KGIS plots' area | 61% | |
| Village, hobli and taluk on the KGIS map | J.I.Kalkere, K R Pura-2 hobli, Bangalore-East taluk | |
| Mutation entry | None open on 1 of 1 filed surveys |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Area on the KGIS map | 13,509 sq m, 1 of 1 filed survey numbers | |
|---|---|---|
| Land area of this registration | 8,253 sq m |
| Survey | Owners as on the RTC, read date / relation / share | Owners on the RTC | RTC extent | Filed extent | Map extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|---|---|
| Sy. No. 7 | 21 | 16 acres 4 guntas | 3 acres 13 guntas | Differs: 12 acres 30 guntas apart | 0 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Mar 2023 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Vkk Grand | about 2 km | Locked |
|---|
| Legacy Saviero | about 2 km | Locked |
|---|
| SOBHA Victoria Park Phase 1 | about 2 km | Locked |
|---|
| Nava Skanda Bellavita | about 3 km | Locked |
|---|
| The Pearl Paradise | about 3.5 km | Locked |
|---|
| Assetz Sun & Sanctum - Phase 2 | about 4 km | Locked |
|---|
| Brr North Excellency Phase I | about 4.5 km | Locked |
|---|
| Radiance Floresta | about 4.5 km | Locked |
|---|
| Adarsh Pinecourt | about 5 km | Locked |
|---|
| Sattva La Vita | about 5 km | Locked |
|---|
| Lodha Mirabelle | about 5 km | Locked |
|---|
| Mirabelle Phase 2 | about 5 km | Locked |
|---|
| Sankalp Manor This project | This project is the point the others are measured from | 30 Mar 2023 | – | Not verified yet |
|---|---|---|---|---|
| Vkk Grand | about 2 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
| Legacy Saviero | about 2 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
| SOBHA Victoria Park Phase 1 | about 2 km | 31 Dec 2027 | 93% (280 of 300) | Locked |
| Nava Skanda Bellavita | about 3 km | 31 Dec 2029 | 18% (63 of 360) | Locked |
| The Pearl Paradise | about 3.5 km | 31 Dec 2026 | 72% (23 of 32) | Locked |
| Assetz Sun & Sanctum - Phase 2 | about 4 km | 31 Jul 2026 | 100% (70 of 70) | Locked |
| Projects within 4 km, counted | 35 (35 with an approximate location) | |
|---|---|---|
| Flats in them | 6,938 | |
| Booked | 3,762 of 6,938 (54%) | |
| Unsold | 3,176 | |
| Booked a month, pooled | 106 flats | |
| Months to sell, pooled | 30 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1 km, Richi's Garden |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Local authority |
| Schedule end | 30 Jun 2022 | |
|---|---|---|
| RERA completion date | 30 Mar 2023 | |
| Work began, as filed | 1 Oct 2018 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Escrow bank | Dhanalakshmi Bank Ltd. · Peenya Branch | |
|---|---|---|
| Share of collections deposited in escrow | 100% |
| K-RERA registrations under this promoter | 46 | |
|---|---|---|
| Marked completed | 26 | |
| Past promised date, not completed | 6 | |
| Other phases under this promoter name | 39 | |
| With a filed extension or completion | 21 (18 completed, 3 extended) | |
| Average schedule slip | 23 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 4.5 km, K.R. Puram | |
| Metro, under construction | about 3 km, Horamavu |
| Kempegowda Airport | 28 | 18 |
| MG Road (CBD) | 14 | 10.5 |
| Manyata Tech Park | 8 | 5.5 |
| ITPL, Whitefield | 14 | 9.5 |
| Ecospace, Bellandur ORR | 19 | 12.5 |
| Electronic City Ph 1 | 30.5 | 22.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Horamavu Agara 20MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 3 km to the north |