Overview
Sattva Songbird Ph 2
Part ofSattva Songbird2 phases, 2,141 flats
Overview
Sattva Songbird Ph 2
Part ofSattva Songbird2 phases, 2,141 flats
Overview
Sattva Songbird Ph 2
Part ofSattva Songbird2 phases, 2,141 flats
Overview
Part ofSattva Songbird2 phases, 2,141 flats
Title & ownership
Approvals
| Building plan (BDA) | Sanctioned 27 Feb 2026 · No. BaAPr/NaMa/AaSa/AA-2/TaSa-3/Ou/42/2025-26 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Forfeiture, agreement | The booking amount |
|---|
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BDA) | Sanctioned 27 Feb 2026 | |
| Escrow bank | ICICI Bank · Commissariat Road |
Data room
246 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| 10x ELapsed · completion date passed | MAZ RD Builders and Developers Private Limited | Apartment | 478 sqft carpet (as filed) | Dec 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
| Adarsh ParadiseActive · 93% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
8 of 328 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
All 345 projects in Old Madras Road → · Sattva Group's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sattva Songbird Ph 2 in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Fire NOC |
|---|
| KSFES/NOC/283/2025 · issued 26 Sep 2025 | Clear |
| Environmental clearance | SEIAA 51 CON 2025 · EC identification no. EC25B3813KA5806827N · issued 10 Jul 2025 | Clear |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 27 Jun 2031 |
| Land conversion | 4 of 4 parcels converted | |
|---|---|---|
| Sy 15/1, 15/2 | Converted 30 Jan 2025 · office of the Deputy Commissioner, Bangalore District | |
| Sy 15/3 | Converted 13 Feb 2025 · office of the Deputy Commissioner, Bangalore District | |
| Sy 15/5 | Converted 9 Jan 2025 · office of the Deputy Commissioner, Bangalore District | |
| Survey numbers | 15/1 · 15/2 · 15/3 · 15/5 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Defect liability | 5 years |
|---|
Type-a 1 - 2BHK + 2t · avg 74 m² 16.8%Type-e 1 - 3BHK + 2t · avg 96 m² 8.4%Type-d 1 - 3BHK + 2 t · avg 93 m² 8.4%Type-c 1 - 3BHK + 2t · avg 92 m² 8.4%16 other types 58%
| Type-a - 2BHK + 2t | 20 | 15,694 |
| Type-a 1 - 2BHK + 2t | 64 | 50,816 |
| Type-b - 2BHK + 2t | 9 | 7,395 |
| Type-b 1 - 2BHK + 2t | 32 | 26,630 |
| Type-c - 3BHK + 2t | 11 | 10,721 |
| Type-c 1 - 3BHK + 2t | 32 | 31,517 |
| Type-d - 3BHK + 2 t | 9 | 8,859 |
| Type-d 1 - 3BHK + 2 t | 32 | 31,872 |
| Type-e - 3BHK + 2t | 11 | 11,281 |
| Type-e 1 - 3BHK + 2t | 32 | 33,153 |
| Type-f - 3BHK + 2t | 11 | 11,141 |
| Type-f 1 - 3BHK + 2t | 32 | 32,765 |
| Type-g - 3BHK + 2t | 11 | 11,399 |
| Type-g 1 - 3BHK + 2t | 32 | 33,573 |
| Type-h - 3BHK+3t | 7 | 7,416 |
| Type-j - 3BHK+3t | 8 | 8,676 |
| Type-k - 3BHK+3t | 6 | 6,501 |
| Type-l - 3BHK+3t | 8 | 8,676 |
| Type-m - 3BHK+3t | 6 | 6,544 |
| Type-n - 3BHK+3t | 8 | 8,783 |
| Sold, Q2 2026-27 | 104 / 381 | |
|---|---|---|
| Unsold, Q2 2026-27 | 277 | |
| Months to sell, derived from filed bookings | 16 months |
| Sattva Songbird | about 0.5 km | Locked | |
|---|---|---|---|
| Godrej Woodscapes | about 1 km | Locked | |
| Chaithanya Sankhya | about 2.5 km | Locked | |
| Assetz Bloom & Dell - Phase 2 | about 2.5 km | Locked | |
| Neighbourhood Tree Park | about 3 km | Locked | |
| One Residences At Sobha One World Ph4 W7 And 8 | about 3.5 km | Locked | |
| One Residences At Sobha One World Ph5 W9,10,11 | about 3.5 km | Locked | |
| One Residences At Sobha One World Ph6 W12,13,14 | about 3.5 km | Locked | |
| Definer Upper Deck | about 3.5 km | Locked | |
| Godrej Splendour Phase II | about 4 km | Locked | |
| Godrej Parkshire (Hoskote) | about 4.5 km | Locked | |
| Godrej Splendour | about 4.5 km | Locked |
| Sattva Songbird Ph 2 This project | This project is the point the others are measured from | 27 Jun 2031 | 27% (104 of 381) | Not verified yet |
|---|---|---|---|---|
| Sattva Songbird | about 0.5 km | 6 May 2029 | 51% (704 of 1,379) | Locked |
| Godrej Woodscapes | about 1 km | 31 Jan 2029 | 100% (2,165 of 2,168) | Locked |
| Chaithanya Sankhya |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 4 km, TRIVENI NAGAR NEAR KR PURAM |
|---|
| Nearest storm drain | about 2.5 km to the south-west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation · Satellite club house (Tower 5-6) | |
|---|---|---|
| Club House, built | 0% | |
| Satellite club house (Tower 5-6), built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Piped Gas, built | 0% | |
| Covered parking per unit | 1.16 (443 covered spaces for 381 units) | |
| Power backup | Declared by the promoter |
As the promoter reported it
| Main structure | Not started · planned by 30 Aug 2030 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 30 May 2031 | |
| Club house | Not started | |
| Completion | 3% |
| Schedule end | 28 Jun 2031 | |
|---|---|---|
| RERA completion date | 27 Jun 2031 | |
| Completion date, agreement | 21 Oct 2032 | |
| Work began, as filed | 1 May 2026 |
| Building heights, fire NOC | filed: Tower-05 135.9 m, Tower-06 25.65 m |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 179.49 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | Clear |
|---|---|---|
| Fire safety | KSFES/NOC/283/2025 · issued 26 Sep 2025 | |
| Environmental clearance | SEIAA 51 CON 2025 · EC identification no. EC25B3813KA5806827N · issued 10 Jul 2025 | |
| Architect, quarterly | Form 5 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | |
| Engineer's certificate, registration | Dated 9 Apr 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹43.66 Cr 14.2%Development · ₹264.65 Cr 85.8%
| Estimated cost, at registration | ₹308.31 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹655.56 Cr | |
| Cost left | ₹648.59 Cr |
Sold (104) 27.3%Unsold (277) 72.7%
| Sold, Q4 2025-26 | 0 / 381 · 381 available | |
|---|---|---|
| Sold, Q1 2026-27 | 43 / 252 · 209 available | |
| Sold, Q2 2026-27 | 104 / 381 · 277 available | |
| Unsold, Q2 2026-27 | 277 | |
| Sold in Q1 2026-27 | 43 | |
| Sold in Q2 2026-27 | 61 |
| Escrow bank | ICICI Bank · Commissariat Road | |
|---|---|---|
| Designated account, collected | ₹13.47 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹7.31 Cr in Q2 2026-27 (54% of that quarter's deposits) |
| K-RERA registrations under this promoter | 10 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 1 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 2.5 km |
| 30 Nov 2028 |
| 66% (29 of 44) |
| Locked |
| Assetz Bloom & Dell - Phase 2 | about 2.5 km | 31 Oct 2027 | 100% (238 of 238) | Locked |
|---|
| Neighbourhood Tree Park | about 3 km | 31 Dec 2028 | 27% (25 of 93) | Locked |
|---|
| One Residences At Sobha One World Ph4 W7 And 8 | about 3.5 km | 30 Sep 2033 | 22% (98 of 440) | Locked |
|---|
| Projects within 4 km, counted | 45 (45 with an approximate location) | |
|---|---|---|
| Flats in them | 15,938 | |
| Booked | 8,364 of 15,938 (52%) | |
| Unsold | 7,574 | |
| Booked a month, pooled | 256 flats | |
| Months to sell, pooled | 25 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 2.5 km to the south-west, tertiary drain | |
|---|---|---|
| Metro, operational | about 6 km, Whitefield | |
| Metro, under construction | about 9 km, Saraswathi Nagar |
| Kempegowda Airport | 27 | 17 |
| MG Road (CBD) | 20.5 | 17.5 |
| Manyata Tech Park | 18.5 | 13.5 |
| ITPL, Whitefield | 13.5 | 7 |
| Ecospace, Bellandur ORR | 20 | 15.5 |
| Electronic City Ph 1 | 35 | 24.5 |
| Landfill or waste transfer station | about 1.5 km, named Cheemasandra BBMP Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 1.5 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km, named Kondaspura on OpenStreetMap |